ALDOT Office Engineer STIP
Records Management Files & Forms Sections & Key Contacts

STIP Level of Effort

Level of Effort Project Obligation Summary By Fiscal Year Report


LVOE ID
Budgeted
Planned
Obligated
Remaining Amt.
FY
2016
County
STATEWIDE
Status
P
Scope
SP
Project #
100045861 SAFETY LVOE ()
Project Description
LEVEL OF EFFORT SAFETY PROGRAM FY-2016
URBAN AREA
Sponsor(s)
LVOE Budget
$49,177,355
FY
2016
County
AUTAUGA
Status
A
Scope
PE
Project #
100057722 HSIP I065 ()
Project Description
GUIDE RAIL INSTALLATION ON I-65 FROM NORTH OF COBBS FORD ROAD TO THE CHILTON COUNTY LINE
URBAN AREA
MONTGOMERY
Sponsor(s)
  • TBD
Federal Share
$18,000
Total Cost
$20,000
FY
2016
County
BARBOUR
Status
C
Scope
FM
Project #
100060430 NH-HSIP 0001 ()
Project Description
RESURFACING AND WIDENING (2' SAFETY WIDENING) ON SR-1 (US-431) FROM JUST SOUTH OF SR-131 TO NORTH OF SR-6 (US-82). BRIDGE RAIL RETROFITTING THE NORTH AND SOUTH BOUND BRIDGES OVER CHENEYHATCHEE CREEK AND BARBOUR CREEK.
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$527,460
Total Cost
$586,766
FY
2016
County
BLOUNT
Status
A
Scope
RW
Project #
100062166 HSIPF 0079 ()
Project Description
ROUNDABOUT CONSTRUCTION AT SR-79 AND SR-160 INTERSECTION
URBAN AREA
Sponsor(s)
Federal Share
$46,020
Total Cost
$46,020
FY
2016
County
BULLOCK
Status
A
Scope
FM
Project #
100066073 HSIP 0015 ()
Project Description
RESURFACE AND 2 FT SAFETY WIDENING SR-15 (US-29) FROM THE PIKE COUNTY LINE TO SR-197 (TRUCK RT 29)
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$857,971
Total Cost
$953,301
FY
2016
County
BUTLER
Status
A
Scope
PE
Project #
100057714 HSIP I065 ()
Project Description
GUIDE RAIL INSTALLATION ON I-65 FROM 0.5 MILE NORTH OF CR-28 TO CATOMA CREEK
URBAN AREA
MONTGOMERY
Sponsor(s)
Federal Share
$9,000
Total Cost
$10,000
FY
2016
County
BUTLER
Status
A
Scope
PE
Project #
100057720 HSIP I065 ()
Project Description
GUIDE RAIL INSTALLATION ON I-65 FROM THE CONECUH CL TO 0.5 MILE NORTH OF CR-28
URBAN AREA
Sponsor(s)
Federal Share
$6,562
Total Cost
$7,291
FY
2016
County
BUTLER
Status
A
Scope
FM
Project #
100065058 STPAA-HSIP 0003 ()
Project Description
SR-3 (US-31) FROM JUST NORTH OF CR-37 TO THE EXISTING JOINT (MP 133.3) PLANING, RESURFACING AND 2' WIDENING
URBAN AREA
Sponsor(s)
Federal Share
$537,894
Total Cost
$597,660
FY
2016
County
CALHOUN
Status
C
Scope
FM
Project #
100064580 STPAA-HSIP 0004 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-4 (US-78) FROM MP 166.715 TO JUST WEST OF CLEBURNE COUNTY LINE MP 171.122
URBAN AREA
ANNISTON
Sponsor(s)
  • TBD
Federal Share
$494,601
Total Cost
$550,298
FY
2016
County
CHAMBERS
Status
A
Scope
FM
Project #
100062399 NH-HSIP 0001 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-1 (US-431) NORTH OF LAFAYETTE CITY LIMITS MP 161.640 TO SOUTH TOWN LIMITS OF FIVE POINTS MP 169.779
URBAN AREA
Sponsor(s)
Federal Share
$686,121
Total Cost
$762,357
FY
2016
County
CLARKE
Status
C
Scope
FM
Project #
100051515 NHF-HSIPF 0013 ()
Project Description
SR-13 (US-43) RESURFACING AND SAFETY WIDENING AND IMPROVEMENTS FROM NEAR CR-10(WALKER SPRINGS RD) TO 0.2 MILE NORTH CR-3
URBAN AREA
Sponsor(s)
Federal Share
$3,048,897
Total Cost
$3,389,632
FY
2016
County
CLARKE
Status
C
Scope
FM
Project #
100064456 STPAA-HSIP 0069 ()
Project Description
2 FT SAFETY WIDENING AND RESURFACING ON SR-69 FROM TALLAHATTA CREEK TO BASHI CREEK
URBAN AREA
Sponsor(s)
Federal Share
$163,422
Total Cost
$182,738
FY
2016
County
CLAY
Status
C
Scope
FM
Project #
100064585 STPAA-HSIP 0077 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-77 FROM JCT SR-49 MP 34.215 TO .3 MILE NORTH OF IDAHO ROAD MP 43.860
URBAN AREA
Sponsor(s)
Federal Share
$413,239
Total Cost
$460,148
FY
2016
County
CLEBURNE
Status
A
Scope
FM
Project #
100064210 STPAA-HSIP 0046 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-46 FROM SOUTH SIDE OF I-20 MP 5.005 TO MP 10.954
URBAN AREA
Sponsor(s)
Federal Share
$581,590
Total Cost
$646,212
FY
2016
County
COLBERT
Status
A
Scope
CN
Project #
100059748 ACOA59748 ATRP ()
Project Description
ADDITIONAL LANES ON AVALON AVENUE FROM SOUTH MONTGOMERY AVE TO COX BLVD
URBAN AREA
SHOALS
Sponsor(s)
  • SHEFFIELD
  • TUSCUMBIA
Federal Share
$742,707
Total Cost
$742,707
FY
2016
County
COLBERT
Status
A
Scope
CN
Project #
100063683 RHCH RR15 ()
Project Description
MODIFICATIONS TO FOUR RAILROAD CROSSINGS IN CHEROKEE, AL. DOT NO. 731985N, DOT NO. 731984G, DOT NO. 731983A, DOT NO. 731982T
URBAN AREA
Sponsor(s)
Federal Share
$324,289
Total Cost
$441,219
FY
2016
County
COOSA
Status
C
Scope
FM
Project #
100064211 STPAA-HSIP 0022 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-22 FROM MP 89.308 TO JCT OF SR-21 (US-231) MP 95.965
URBAN AREA
Sponsor(s)
Federal Share
$703,620
Total Cost
$781,820
FY
2016
County
COVINGTON
Status
C
Scope
FM
Project #
100064175 STPAA-HSIP 0055 ()
Project Description
RESURFACING AND 2 FT SAFETY WIDENING ON SR-55 FROM PAVING JOINT SOUTH OF POPLAR STREET TO YELLOW RIVER
URBAN AREA
Sponsor(s)
Federal Share
$674,875
Total Cost
$750,497
FY
2016
County
CULLMAN
Status
A
Scope
FM
Project #
100062718 NH-HSIP 0074 ()
Project Description
RESURFACE AND SAFETY IMPROVEMENTS ON SR-74 (US-278) FROM JUST WEST OF I-65 TO SR-3 (US-31) IN CULLMAN
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$264,600
Total Cost
$294,000
FY
2016
County
CULLMAN
Status
A
Scope
FM
Project #
100062993 STPAA-HSIP 0069 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-69 FROM SR-3 (US-31) TO SR-74 (US-278) IN CULLMAN
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$440,272
Total Cost
$489,191
FY
2016
County
CULLMAN
Status
A
Scope
PE
Project #
100066089 HSIP 0069 ()
Project Description
ADDITION OF LEFT TURN LANE ON SR-69 AT CR-1545(GOLDRIDGE ROAD)
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$67,500
Total Cost
$75,000
FY
2016
County
DALE
Status
C
Scope
FM
Project #
100065142 STPAA-HSIP 0092 ()
Project Description
TRIPLE LAYER SURFACE TREATMENT AND 2' SAFETY WIDENING ON SR-92 FROM SR-167 TO SR-12 (US-84)
URBAN AREA
Sponsor(s)
Federal Share
$348,216
Total Cost
$387,123
FY
2016
County
DEKALB
Status
C
Scope
PE
Project #
100058014 HSIP I059 ()
Project Description
INSTALL INTERSTATE MEDIAN SAFETY BARRIER ON I-59 FROM SR-117 AT MP 231.40 TO THE GEORGIA STATE LINE AT MP 241.20
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$12,275
Total Cost
$13,749
FY
2016
County
DEKALB
Status
A
Scope
FM
Project #
100062726 STPAA-HSIP 0117 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-117 FROM THE GA STATE LINE TO SR-7(US-11) IN HAMMONDVILLE
URBAN AREA
Sponsor(s)
Federal Share
$1,183,889
Total Cost
$1,315,432
FY
2016
County
DEKALB
Status
C
Scope
FM
Project #
100062740 STPAA-HSIP 0227 ()
Project Description
RESURFACE AND 2 FT SAFETY WIDENING ON SR-227 FROM DEKALB CR-400 TO THE MARSHALL / DEKALB COUNTY LINE
URBAN AREA
Sponsor(s)
Federal Share
$78,946
Total Cost
$87,756
FY
2016
County
DEKALB
Status
C
Scope
FM
Project #
100062742 STPAA-HSIP 0227 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-227 FROM SR-68 IN CROSSVILLE TO SR-75 IN GERALDINE
URBAN AREA
Sponsor(s)
Federal Share
$247,654
Total Cost
$275,171
FY
2016
County
ELMORE
Status
C
Scope
FM
Project #
100056610 STPAA-HSIP 0111 ()
Project Description
RESURFACING AND 2 FT SAFETY WIDENING ON SR-111 FROM HOGAN ROAD TO SR-143
URBAN AREA
MONTGOMERY
Sponsor(s)
  • ALDOT
Federal Share
$162,090
Total Cost
$180,101
FY
2016
County
ELMORE
Status
A
Scope
PE
Project #
100065205 HSIP 2616 ()
Project Description
INSTALLATION OF A ROUNDABOUT AT THE INTERSECTION OF REDLAND ROAD (CR-8) AND FIRETOWER/DOZIER ROAD (CR-59).
URBAN AREA
MONTGOMERY
Sponsor(s)
  • TBD
Federal Share
$142,500
Total Cost
$142,500
FY
2016
County
GENEVA
Status
C
Scope
FM
Project #
100064172 STPAA-HSIP 0052 ()
Project Description
RESURFACING AND 2' SAFETY WIDENING SR-52 FROM SR-196 TO GENEVA EAST CITY LIMITS
URBAN AREA
Sponsor(s)
Federal Share
$127,110
Total Cost
$141,233
FY
2016
County
GENEVA
Status
C
Scope
FM
Project #
100065128 STPAA-HSIP 0027 ()
Project Description
2' SAFETY WIDENING AND RESURFACING OF SR-27 FROM JUNCTION SR-52 TO JUNCTION CR-8
URBAN AREA
Sponsor(s)
Federal Share
$188,542
Total Cost
$209,820
FY
2016
County
GREENE
Status
C
Scope
CN
Project #
100060975 HSIP I059 ()
Project Description
GUIDE RAIL INSTALLATION ON I-59 FROM JUST NORTH OF SUMTER COUNTY LINE AT MP 27.282 TO TUSCALOOSA COUNTY LINE AT MP 55.352
URBAN AREA
TUSCALOOSA
Sponsor(s)
Federal Share
$1,463,678
Total Cost
$1,626,872
FY
2016
County
GREENE
Status
A
Scope
FM
Project #
100064493 STPAA-HSIP 0007 ()
Project Description
RESURFACING AND 2' SAFETY WIDENING ON SR-7 FROM THE END OF THE CURB AND GUTTER SECTION AT MP 44.654 TO JUST SOUTH OF CR-208 AT MP 49.011
URBAN AREA
Sponsor(s)
Federal Share
$400,213
Total Cost
$444,682
FY
2016
County
HENRY
Status
C
Scope
FM
Project #
100063598 STPAA-HSIP 0095 ()
Project Description
RESURFACING AND 2' SAFETY WIDENING ON SR-95 FROM CR-46 IN ABBEVILLE TO NORTH OF CR-92
URBAN AREA
Sponsor(s)
Federal Share
$477,385
Total Cost
$530,428
FY
2016
County
HOUSTON
Status
C
Scope
FM
Project #
100063627 NH-HSIP 0052 ()
Project Description
RESURFACING AND 2' SAFETY WIDENING OF SR-52 FROM EAST OF CR-55 TO GEORGIA STATE LINE
URBAN AREA
Sponsor(s)
Federal Share
$624,410
Total Cost
$693,789
FY
2016
County
HOUSTON
Status
A
Scope
CN
Project #
100063771 RHCH RR16 ()
Project Description
RAILROAD CROSSING IMPROVEMENTS AT LAKE STREET IN HOUSTON COUNTY, REF NO. 1291 (PHASE XIII-R), DOT NO. 637-956X
URBAN AREA
DOTHAN
Sponsor(s)
  • HOUSTON COUNTY
Federal Share
$306,985
Total Cost
$306,985
FY
2016
County
JEFFERSON
Status
C
Scope
CN
Project #
100062226 RHCH RR14 ()
Project Description
MCCORMACK DRIVE/REF. #1273(XIV-R) /DOT # 352 245M
URBAN AREA
BIRMINGHAM
Sponsor(s)
  • ALDOT
Federal Share
$159,522
Total Cost
$159,522
FY
2016
County
JEFFERSON
Status
A
Scope
UT
Project #
100065160 STPAA-HSIP 0003 ()
Project Description
RESURFACING, SAFETY WIDENING AND SAFETY IMPROVEMENTS ALONG SR-3 (US-31) FROM LOCUST FORK BLACK WARRIOR RIVER TO BLOUNT COUNTY LINE
URBAN AREA
BIRMINGHAM
Sponsor(s)
  • ALDOT
Federal Share
$52,522
Total Cost
$58,358
FY
2016
County
LAMAR
Status
A
Scope
FM
Project #
100064500 STPAA-HSIP 0018 ()
Project Description
RESURFACING AND 2FT SAFETY WIDENING ON SR-18 FROM SR-17 AT MP 9.849 TO CR-49 AT MP 16.304
URBAN AREA
Sponsor(s)
Federal Share
$236,079
Total Cost
$262,310
FY
2016
County
LAWRENCE
Status
A
Scope
CN
Project #
100064439 RHCH RR16 ()
Project Description
MODIFICATIONS TO FOUR RAILROAD CROSSINGS IN COURTLAND, AL. DOT NO. 731895P, DOT NO. 731894H, DOT NO. 731893B, AND DOT NO. 731892U
URBAN AREA
Sponsor(s)
Federal Share
$490,020
Total Cost
$816,719
FY
2016
County
LAWRENCE
Status
A
Scope
PE
Project #
100065439 RHPD RR16 ()
Project Description
BRIDGE REPLACEMENT ON JEFFERSON STREET (CR-270) OVER NORFOLK SOUTHERN RAILROAD IN THE CITY OF COURTLAND (BIN 397)
URBAN AREA
Sponsor(s)
Federal Share
$182,000
Total Cost
$250,000
FY
2016
County
LEE
Status
A
Scope
FM
Project #
100063148 STPAA-HSIP 0051 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-51 FROM THE RUSSELL COUNTY LINE(MP 98.120) TO THE OPELIKA CITY LIMITS (MP 111.980)
URBAN AREA
AUBURN-OPELIKA
Sponsor(s)
  • TBD
Federal Share
$799,501
Total Cost
$888,334
FY
2016
County
LEE
Status
A
Scope
CN
Project #
100064690 RHCH RR15 ()
Project Description
NORFOLK SOUTHERN CORRIDOR RAILROAD CROSSING IMPROVEMENTS AT DOT #S: 728-151E, 728-153T, 728-154A, 728-156N, 728-157V, 728-158C, 728-159J, 728-160D, 728-161K, 728-162S, 728-163Y, 728-164F, 728-165M, AND 728-166U.
URBAN AREA
PHENIX CITY
Sponsor(s)
  • TBD
Federal Share
$65,000
Total Cost
$327,553
FY
2016
County
LIMESTONE
Status
C
Scope
CN
Project #
100058237 HSIP-STPSA I065 ()
Project Description
MEDIAN CROSSOVER PROTECTION ON I-65 FROM NORFOLK SOUTHERN RR OVERPASS (MP 341.40) TO 0.1 MILE SOUTH SR-3 (US-31) (MP 354.1) AND FROM 1.3 MILES NORTH SR-53 UNDERPASS (MP 366.20) TO TENNESSEE STATE LINE (MP 366.30) LIMESTONE COUNTY
URBAN AREA
HUNTSVILLE
Sponsor(s)
Federal Share
$1,022,483
Total Cost
$1,136,280
FY
2016
County
LIMESTONE
Status
C
Scope
CN
Project #
100058241 HSIP-STPSA I565 ()
Project Description
MEDIAN CROSSOVER PROTECTION ON I-565 FROM SPRING BRANCH (MP 0.10) TO CR-1036 (MADISON BOULEVARD OVERPASS) (MP 13.30) LIMESTONE AND MADISON COUNTIES
URBAN AREA
HUNTSVILLE
Sponsor(s)
  • ALDOT
Federal Share
$773,363
Total Cost
$859,808
FY
2016
County
LIMESTONE
Status
A
Scope
PE
Project #
100065146 HSIPF 0251 ()
Project Description
INTERSECTION MODIFICATION ON SR-251 AT CR-83 (LINDSAY LANE) TO INSTALL ROUNDABOUT
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$372,008
Total Cost
$413,342
FY
2016
County
LIMESTONE
Status
A
Scope
PE
Project #
100065202 HSIP 4216 ()
Project Description
INTERSECTION MODIFICATION ON CR-109 (EAST LIMESTONE ROAD) AND CR-36 (CAPSHAW ROAD) TO INSTALL ROUNDABOUT
URBAN AREA
HUNTSVILLE
Sponsor(s)
  • TBD
Federal Share
$75,000
Total Cost
$75,000
FY
2016
County
LOWNDES
Status
C
Scope
FM
Project #
100060033 STPAA-HSIP 0097 ()
Project Description
SR-97 FROM JUST NORTH OF I-65 DENIED ACCESS LIMITS TO NORTH OF THE JUNCTION OF SR-21, PLANING, RESURFACING AND WIDENING
URBAN AREA
Sponsor(s)
Federal Share
$550,806
Total Cost
$614,525
FY
2016
County
MACON
Status
A
Scope
PE
Project #
100057718 HSIP I085 ()
Project Description
GUIDERAIL INSTALLATION ON I-85 FROM MONTGOMERY COUNTY LINE TO LEE COUNTY LINE
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$6,300
Total Cost
$7,000
FY
2016
County
MACON
Status
C
Scope
FM
Project #
100062484 STPAA-HSIP 0008 ()
Project Description
PLANING, RESURFACING, 2' WIDENING, AND GUARDRAIL RETROFIT ON SR-8 (US-80) FROM THE JCT OF CR-40 TO THE BEGINNING OF DIVIDED 4 LANE
URBAN AREA
Sponsor(s)
Federal Share
$374,572
Total Cost
$416,191
FY
2016
County
MACON
Status
A
Scope
FM
Project #
100065135 STPAA-HSIP 0081 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-81 FROM THE JUNCTION OF SR-8 (US-80) TO THE JUNCTION OF SR-14
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$506,148
Total Cost
$562,387
FY
2016
County
MADISON
Status
C
Scope
FM
Project #
100062713 NH-HSIP 0001 ()
Project Description
RESURFACE AND 2 FT SAFETY WIDENING ON SR-1(US-431) FROM JUST SOUTH OF OLD HWY 431 TO JUST SOUTH OF VICTORIAN LANE
URBAN AREA
HUNTSVILLE
Sponsor(s)
  • ALDOT
Federal Share
$478,829
Total Cost
$532,090
FY
2016
County
MADISON
Status
A
Scope
SP
Project #
100064489 HSIP NR16 ()
Project Description
ROUNDABOUT CONVERSION STUDY: OLD MONROVIA ROAD AND PROVIDENCE MAIN STREET
URBAN AREA
HUNTSVILLE
Sponsor(s)
  • TBD
Federal Share
$38,112
Total Cost
$42,347
FY
2016
County
MARENGO
Status
C
Scope
FM
Project #
100062436 NH-HSIP 0008 ()
Project Description
2 FT. SAFETY WIDENING (2-LANE), AND RESURFACING ON SR-8 (US-80) FROM HALE CL TO PERRY CL.
URBAN AREA
Sponsor(s)
Federal Share
$109,765
Total Cost
$122,723
FY
2016
County
MARENGO
Status
C
Scope
FM
Project #
100064454 NH-HSIP 0013 ()
Project Description
2 FT. SAFETY WIDENING AND RESURFACING ON SR-13(US-43)FROM 0.78 MILE NORTH OF SR-10 TO SOUTH OF CR-30
URBAN AREA
Sponsor(s)
Federal Share
$263,263
Total Cost
$293,547
FY
2016
County
MARENGO
Status
C
Scope
FM
Project #
100064457 STPAA-HSIP 0069 ()
Project Description
2 FT SAFETY WIDENING AND RESURFACING ON SR-69 FROM THE CLARKE CO LINE TO NORTH END OF HORSE CREEK BR
URBAN AREA
Sponsor(s)
Federal Share
$299,043
Total Cost
$332,617
FY
2016
County
MARSHALL
Status
C
Scope
FM
Project #
100062729 STPAA-HSIP 0227 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-227 FROM THE MARSHALL / DEKALB COUNTY LINE TO SOUTH SAUTY ROAD AND SR-62
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$108,692
Total Cost
$120,768
FY
2016
County
MOBILE
Status
A
Scope
CN
Project #
100059086 HSIP 4913 ()
Project Description
INTERSECTION IMPROVEMENT ON TANNER WILLIAMS ROAD (CR-70) AT ELIZA JORDAN ROAD (CR-523) TO INCLUDE ADDITIONAL LANES AND UTILITIES RELOCATIONS GRADE, DRAIN, BASE, AND PAVE
URBAN AREA
MOBILE
Sponsor(s)
  • MOBILE COUNTY
Federal Share
$600,713
Total Cost
$750,892
FY
2016
County
MOBILE
Status
A
Scope
UT
Project #
100061696 HSIP 4913 ()
Project Description
INTERSECTION IMPROVEMENT ON TANNER WILLIAMS ROAD (CR-70) AT ELIZA JORDAN ROAD (CR-523) TO INCLUDE ADDITIONAL LANES AND UTILITIES RELOCATIONS
URBAN AREA
MOBILE
Sponsor(s)
  • MOBILE COUNTY
Federal Share
$18,366
Total Cost
$20,406
FY
2016
County
MOBILE
Status
A
Scope
CN
Project #
100063100 HSIP 0042 ()
Project Description
CONSTRUCT OFFSET LEFT TURN LANES AND A WEST BOUND RIGHT TURN ON SR-42 (US-98) AT THE INTERSECTION OF MCCRARY ROAD (CR-27)
URBAN AREA
MOBILE
Sponsor(s)
  • ALDOT
Federal Share
$675,000
Total Cost
$1,172,986
FY
2016
County
MONROE
Status
C
Scope
FM
Project #
100064451 STPAA-HSIP 0041 ()
Project Description
2' SAFETY WIDENING AND RESURFACING SR-41 FROM 0.130 MI SOUTH CR-230 TO 0.160 MI SOUTH OF CR-17
URBAN AREA
Sponsor(s)
Federal Share
$172,435
Total Cost
$191,621
FY
2016
County
MONTGOMERY
Status
A
Scope
FM
Project #
100061514 STPAA-HSIP 0126 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING SR-126 FROM THE JCT OF ATLANTA HIGHWAY TO THE JCT OF CHANTILLY PARKWAY. EXCLUDING THE MONTGOMERY OUTER LOOP BASE AND PAVE PROJECT LIMITS
URBAN AREA
MONTGOMERY
Sponsor(s)
  • ALDOT
Federal Share
$147,069
Total Cost
$163,410
FY
2016
County
MONTGOMERY
Status
A
Scope
FM
Project #
100061515 STPAA-HSIP 0293 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING SR-293 FROM SR-110 TO SR-126
URBAN AREA
MONTGOMERY
Sponsor(s)
  • ALDOT
Federal Share
$74,938
Total Cost
$83,264
FY
2016
County
MONTGOMERY
Status
A
Scope
FM
Project #
100063480 STPAA-HSIP 0094 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-94 FROM THE EAST TOWN LIMITS OF RAMER TO THE JCT. OF SR-53 (US-231)
URBAN AREA
Sponsor(s)
Federal Share
$758,857
Total Cost
$843,175
FY
2016
County
PERRY
Status
A
Scope
FM
Project #
100064306 NH-HSIP 0005 ()
Project Description
RESURFACING AND 2 FT SAFETY WIDENING SR-5 FROM N. OF SR-183 (MP 58.787) TO S. OF SR-14 (MP 63.062) AND SR-183 FROM SR-5 (MP 20.268) TO SR-14 (MP 21.273)
URBAN AREA
Sponsor(s)
Federal Share
$538,497
Total Cost
$598,330
FY
2016
County
PIKE
Status
C
Scope
FM
Project #
100063478 STPAA-HSIP 0010 ()
Project Description
RESURFACING AND 2' SAFETY WIDENING ON SR-10 FROM END OF CURB SECTION EAST OF BRUNDIDGE TO BARBOUR COUNTY LINE
URBAN AREA
Sponsor(s)
Federal Share
$307,818
Total Cost
$342,146
FY
2016
County
RANDOLPH
Status
C
Scope
CN
Project #
100064300 RHPD RR16 ()
Project Description
RAILROAD CROSSING IMPROVEMENTS, COUNTY ROAD 3, PHASE (XIII-R), SECTION 130 CROSSING # 639253C
URBAN AREA
Sponsor(s)
Federal Share
$243,013
Total Cost
$243,027
FY
2016
County
RANDOLPH
Status
C
Scope
FM
Project #
100064579 STPAA-HSIP 0022 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-22 FROM MP 153.109 TO MP 157.853
URBAN AREA
Sponsor(s)
Federal Share
$36,495
Total Cost
$40,550
FY
2016
County
RANDOLPH
Status
C
Scope
FM
Project #
100064579 STPAA-HSIP 0022 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-22 FROM MP 153.109 TO MP 157.853
URBAN AREA
Sponsor(s)
Federal Share
$320,450
Total Cost
$356,229
FY
2016
County
RUSSELL
Status
A
Scope
FM
Project #
100064755 STPAA-HSIP 0169 ()
Project Description
RESURFACE AND 1' SAFETY WIDENING SR-169 FROM THE JCT OF SR-1 (US-431) TO THE JCT OF SR-8 (US-80)
URBAN AREA
PHENIX CITY
Sponsor(s)
  • TBD
Federal Share
$216,412
Total Cost
$240,458
FY
2016
County
SHELBY
Status
A
Scope
FM
Project #
100060391 STPAA-HSIP 0155 ()
Project Description
PLANING, RESURFACING AND SAFETY WIDENING ALONG SR-155 FROM 780' NORTH OF SR-25 TO SR-119 IN MONTEVALLO
URBAN AREA
BIRMINGHAM
Sponsor(s)
  • ALDOT
Federal Share
$17,231
Total Cost
$19,146
FY
2016
County
ST. CLAIR
Status
A
Scope
RW
Project #
100062161 HSIPF 0053 ()
Project Description
ROUNDABOUT CONSTRUCTION AT SR-53 (US-231) AND SR-25 (US-411)/CR-33 INTERSECTION
URBAN AREA
Sponsor(s)
Federal Share
$66,474
Total Cost
$73,860
FY
2016
County
ST. CLAIR
Status
C
Scope
FM
Project #
100062720 STPAA-HSIP 0007 ()
Project Description
RESURFACE AND 2 FT SAFETY WIDENING ON SR-7(US-11) FROM SR-53(US-231) TO THE SOUTH STEELE TOWN LIMIT
URBAN AREA
Sponsor(s)
Federal Share
$112,765
Total Cost
$125,295
FY
2016
County
ST. CLAIR
Status
C
Scope
FM
Project #
100062737 STPAA-HSIP 0174 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-174 FROM SR-25(US-411) SOUTH OF ODENVILLE TO SR-53(US-231) NORTH OF PELL CITY
URBAN AREA
BIRMINGHAM
Sponsor(s)
  • ALDOT
Federal Share
$519,352
Total Cost
$577,069
FY
2016
County
STATEWIDE
Status
A
Scope
SP
Project #
100064912 HSIP NR16 ()
Project Description
DEVELOPMENT OF ALSAFE: PHASE II CONTINUED PROGRAM DEVELOPMENT FOR SAFETY PLANNING TOOLS FOR MPOS ON A STATEWIDE BASIS
URBAN AREA
Sponsor(s)
Federal Share
$227,250
Total Cost
$252,500
FY
2016
County
STATEWIDE
Status
A
Scope
SP
Project #
100065000 HSIP NR16 ()
Project Description
DEVELOPMENT OF USRAP (PHASE III); COVERING THE STATE
URBAN AREA
Sponsor(s)
Federal Share
$338,369
Total Cost
$375,965
FY
2016
County
STATEWIDE
Status
A
Scope
SP
Project #
100065223 HSIP NR16 ()
Project Description
STOP CONTROLLED INTERSECTION SAFETY REVIEW PILOT PROJECT INCLUDES EVALUATION OF 49 STOP CONTROLLED INTERSECTIONS IN THE ALDOT NORTH REGION
URBAN AREA
Sponsor(s)
Federal Share
$64,592
Total Cost
$71,769
FY
2016
County
STATEWIDE
Status
A
Scope
SP
Project #
100065225 RHCH RR16 ()
Project Description
ALDOT PUBLIC RAIL HIGHWAY 2009 MUTCD PASSIVE DEVICE COMPLIANCE PILOT PROJECT
URBAN AREA
Sponsor(s)
Federal Share
$71,650
Total Cost
$71,650
FY
2016
County
STATEWIDE
Status
A
Scope
SP
Project #
100065225 RHCH RR16 ()
Project Description
ALDOT PUBLIC RAIL HIGHWAY 2009 MUTCD PASSIVE DEVICE COMPLIANCE PILOT PROJECT
URBAN AREA
Sponsor(s)
Federal Share
$230,478
Total Cost
$230,478
FY
2016
County
SUMTER
Status
A
Scope
FM
Project #
100053533 STPAA-HSIP 0039 ()
Project Description
RESURFACING OF SR-39 WITH 2' SAFETY WIDENING FROM THE NORTH END OF FACTORY CREEK BRIDGE AT MP 5.603 TO THE TOMBIGBEE RIVER BRIDGE AT MP 11.161
URBAN AREA
Sponsor(s)
Federal Share
$474,825
Total Cost
$527,583
FY
2016
County
SUMTER
Status
C
Scope
CN
Project #
100057672 IMF-HSIPF I059 ()
Project Description
I-20/59 INTERSTATE MEDIAN BARRIER FROM MISSISSIPPI STATE LINE TO TOMBIGBEE RIVER DUAL BRIDGES
URBAN AREA
Sponsor(s)
Federal Share
$1,412,405
Total Cost
$1,585,698
FY
2016
County
SUMTER
Status
A
Scope
PE
Project #
100064866 HSIP 0008 ()
Project Description
SAFETY IMPROVEMENTS ON SR-8 (US-80) AT SR-28 AND CR-25
URBAN AREA
Sponsor(s)
Federal Share
$225,000
Total Cost
$250,000
FY
2016
County
TALLADEGA
Status
C
Scope
CN
Project #
100050480 RHPD 1T04 ()
Project Description
CR-683 (STEPHEN J WHITE MEMORIAL BLVD) IN TALLADEGA NORTH SR-21 DOT # 727-316W INSTALL STANDARD MAST MOUNTED SIGNALS, BELLS, GATES ADDITIONAL HEADS TO FACE BROOM STREET. TRIM VEGETATION NORTH SIDE OF TRACKS.
URBAN AREA
Sponsor(s)
Federal Share
$187,020
Total Cost
$187,025
FY
2016
County
TALLADEGA
Status
C
Scope
CN
Project #
100063003 RHCH RR15 ()
Project Description
RAILROAD CROSSING IMPROVEMENTS AT AVENUE H IN TALLADEGA COUNTY, REF # 1280, DOT NO. 727-315P
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$179,570
Total Cost
$179,686
FY
2016
County
TALLAPOOSA
Status
C
Scope
CN
Project #
100062479 RHPD RR14 ()
Project Description
RAILROAD CROSSING IMPROVEMENTS AT ELKAHATCHEE STREET IN ALEXANDER CITY, REF # 1287, DOT NO. 728-231X
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$216,429
Total Cost
$216,624
FY
2016
County
TALLAPOOSA
Status
A
Scope
CN
Project #
100064069 RHPD RR15 ()
Project Description
RAILROAD CROSSING IMPROVEMENTS AT BIBB STREET IN ALEXANDER CITY, DOT NUMBER 728228P
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$338,274
Total Cost
$338,274
FY
2016
County
TALLAPOOSA
Status
C
Scope
FM
Project #
100064582 STPAA-HSIP 0014 ()
Project Description
RESURFACING AND 2' SAFETY WIDENING ON SR-14 FROM BEGINNING OF 2 LANE SECTION MP 196.177 TO MP 198.849
URBAN AREA
Sponsor(s)
Federal Share
$405,808
Total Cost
$455,707
FY
2016
County
TALLAPOOSA
Status
C
Scope
FM
Project #
100064583 STPAA-HSIP 0049 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-49 FROM JCT OF SR-14 MP 8.990 TO MP 14.354 (SOUGAHATCHEE CREEK)
URBAN AREA
Sponsor(s)
Federal Share
$650,746
Total Cost
$723,117
FY
2016
County
TUSCALOOSA
Status
A
Scope
FM
Project #
100065214 STPAA-HSIP 0216 ()
Project Description
RESURFACING AND 2 FT SAFETY WIDENING ON SR-216 FROM JUST EAST OF LOCK 17 RD TO CR-9
URBAN AREA
TUSCALOOSA
Sponsor(s)
  • ALDOT
Federal Share
$359,642
Total Cost
$399,602
FY
2016
County
WASHINGTON
Status
C
Scope
FM
Project #
100062498 STPAA-HSIP 0056 ()
Project Description
2' SAFETY WIDENING (PARTIAL) AND RESURFACING ON SR-56 FROM EAST OF CR-1 TO WEST OF SR-13 (US-43) INTERSECTION, MP. 12.948 TO MP. 27.661
URBAN AREA
Sponsor(s)
Federal Share
$206,181
Total Cost
$229,573
FY
2016
County
WILCOX
Status
C
Scope
FM
Project #
100064459 STPAA-HSIP 0221 ()
Project Description
2' SAFETY WIDENING AND RESURFACING SR-221 FROM SR-10 TO SR-28
URBAN AREA
Sponsor(s)
Federal Share
$295,242
Total Cost
$328,046
FY
2016
County
WILCOX
Status
C
Scope
FM
Project #
100064460 NH-HSIP 0005 ()
Project Description
2' SAFETY WIDENING AND RESURFACING ON SR - 5,FROM MOCCASIN CREEK TO 0.32 MILES NORTH OF SR-10
URBAN AREA
Sponsor(s)
Federal Share
$154,283
Total Cost
$171,425
FY
2016
County
WINSTON
Status
C
Scope
CN
Project #
100062265 RHCH RR14 ()
Project Description
RAILROAD CROSSING IMPROVEMENT ON CR-3625 AT NORFOLK/SOUTHERN RR NEAR NAUVOO
URBAN AREA
Sponsor(s)
Federal Share
$346,790
Total Cost
$346,790
FY
2016
County
STATEWIDE
Status
P
Scope
SP
Project #
100046345 TAP LVOE ()
Project Description
LEVEL OF EFFORT FOR TRANSPORTATION ALTERNATIVES PROGRAM FY 2016
URBAN AREA
Sponsor(s)
LVOE Budget
$15,898,000
FY
2016
County
BALDWIN
Status
A
Scope
CN
Project #
100061683 TAPNU TA13 ()
Project Description
SIDEWALK IMPROVEMENT PROJECT ON SR-59 IN THE CITY OF GULF SHORES.
URBAN AREA
Sponsor(s)
Federal Share
$400,000
Total Cost
$500,000
FY
2016
County
BALDWIN
Status
A
Scope
CN
Project #
100062553 TAPAA TA14 ()
Project Description
SIDEWALKS ALONG COLLEGE AVENUE BETWEEN EAST SILVERHILL AVENUE AND FAIRGROUND ROAD AND ON FAIRGROUND ROAD BETWEEN COLISEUM AND SR-59 IN THE CITY OF ROBERTSDALE.
URBAN AREA
EASTERN SHORE
Sponsor(s)
  • CITY OF ROBERTSDALE
Federal Share
$389,126
Total Cost
$486,407
FY
2016
County
BALDWIN
Status
A
Scope
CN
Project #
100062556 TAPOA TA14 ()
Project Description
SIDEWALKS ALONG SR-287 (HAND AVENUE), PETTY LANE, EAST 12TH STREET AND WEST 12TH STREET IN THE CITY OF BAY MINETTE.
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$216,269
Total Cost
$270,336
FY
2016
County
BALDWIN
Status
A
Scope
CN
Project #
100062558 TAPOA TA14 ()
Project Description
MULTI-USE PATH ON FAIRHOPE AVENUE AND SECTION STREET SR-42 (US-98) AND SR-104 IN FAIRHOPE.
URBAN AREA
EASTERN SHORE
Sponsor(s)
  • CITY OF FAIRHOPE
Federal Share
$400,000
Total Cost
$500,000
FY
2016
County
BALDWIN
Status
A
Scope
CN
Project #
100064549 TAPAA TA15 ()
Project Description
STEDMAN'S LANDING BOARDWALK CONSTRUCTION LOCATED ON SCENIC HWY 98 IN THE MONTROSE COMMUNITY IN BALDWIN COUNTY
URBAN AREA
Sponsor(s)
  • BALDWIN COUNTY COMMISSION
Federal Share
$182,473
Total Cost
$228,092
FY
2016
County
BALDWIN
Status
C
Scope
CN
Project #
100064550 TAPOA TA15 ()
Project Description
SIDEWALK IMPROVEMENTS FROM THE INTERSECTION OF WINDMILL RIDGE ROAD AND SR-59 TO THE INTERSECTION OF SR-59 AND SR-182 IN THE CITY OF GULF SHORES.
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$272,614
Total Cost
$340,768
FY
2016
County
BARBOUR
Status
A
Scope
CN
Project #
100063180 TAPOA TA14 ()
Project Description
RAILS TO TRAILS - PHASE III UNDER HIGHWAY SR-6 (US-82) /SR-1 (US-431) IN THE CITY OF EUFAULA..
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$400,000
Total Cost
$500,000
FY
2016
County
CHOCTAW
Status
A
Scope
CN
Project #
100063116 TAPNU TA14 ()
Project Description
DOWNTOWN SIDEWALKS ALONG WEST CHURCH STREET AND SOUTH HAMBURG AVENUE IN THE TOWN OF BUTLER.
URBAN AREA
Sponsor(s)
Federal Share
$157,074
Total Cost
$196,342
FY
2016
County
CHOCTAW
Status
A
Scope
CN
Project #
100063118 TAPNU TA14 ()
Project Description
DOWNTOWN STREETSCAPE ALONG RIVER STREET IN THE TOWN OF COFFEEVILLE.
URBAN AREA
Sponsor(s)
Federal Share
$188,880
Total Cost
$236,100
FY
2016
County
CLARKE
Status
A
Scope
CN
Project #
100061759 TAPNU TA13 ()
Project Description
SIDEWALKS ALONG 4TH AVENUE AND CARTER DRIVE TO SANDY CIRCLE IN THE TOWN OF GROVE HILL.
URBAN AREA
Sponsor(s)
Federal Share
$194,520
Total Cost
$246,608
FY
2016
County
CLARKE
Status
C
Scope
CN
Project #
100063108 TAPNU TA14 ()
Project Description
SIDEWALK IMPROVEMENTS ALONG DEPOT ROAD, EAST STATE STREET, OAK STREET AND EAST PEARL STREET IN JACKSON.
URBAN AREA
Sponsor(s)
Federal Share
$296,040
Total Cost
$379,857
FY
2016
County
CLAY
Status
C
Scope
CN
Project #
100062595 TAPNU TA14 ()
Project Description
VEGETATION MANAGEMENT ON THE COUNTY MAINTAINED RIGHT OF WAYS IN CLAY COUNTY.
URBAN AREA
Sponsor(s)
Federal Share
$131,034
Total Cost
$163,792
FY
2016
County
COFFEE
Status
A
Scope
CN
Project #
100063185 TAPAA TA14 ()
Project Description
SIDEWALK IMPROVEMENTS - PHASE IV. ON NORTH MAIN STREET SR-12 (US-84) FROM ADAMS STREET TO WATTS STREET IN THE CITY OF ENTERPRISE.
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$400,000
Total Cost
$500,000
FY
2016
County
COVINGTON
Status
A
Scope
CN
Project #
100061654 TAPNU TA13 ()
Project Description
OPP DEPOT REHABILITATION ON THE CORNER OF S. MAIN TO COVINGTON AVENUE IN OPP.
URBAN AREA
Sponsor(s)
Federal Share
$400,000
Total Cost
$500,000
FY
2016
County
CULLMAN
Status
A
Scope
CN
Project #
100062570 TAPAA TA14 ()
Project Description
DOWNTOWN STREETSCAPE IN THE CITY OF CULLMAN. THIS PROJECT IS LOCATED ON SR-3 (US-31) FROM 5TH STREET TO 7TH STREET IN CULLMAN
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$385,060
Total Cost
$481,325
FY
2016
County
DALE
Status
C
Scope
CN
Project #
100064538 TAPOA TA15 ()
Project Description
DOWNTOWN ADA IMPROVEMENTS LOCATED ON SR-123, SR-249 AND SR-105 IN THE CITY OF OZARK.
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$119,878
Total Cost
$149,848
FY
2016
County
DALLAS
Status
A
Scope
CN
Project #
100061622 TAPOA TA13 ()
Project Description
WATER AVENUE REDEVELOPMENT, PHASE II FROM CHURCH STREET TO BROAD STREET IN DOWNTOWN SELMA.
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$400,000
Total Cost
$500,000
FY
2016
County
DEKALB
Status
A
Scope
CN
Project #
100061729 TAPNU TA13 ()
Project Description
CROSSVILLE SIDEWALK IMPROVEMENTS ALONG SR-68 FROM THE NEW CROSSVILLE ELEMENTARY SCHOOL TO CR-24 AND FROM COKER DR. TO UNION GROVE RD. ALONG THE SOUTH SIDE OF SR-68.
URBAN AREA
Sponsor(s)
Federal Share
$400,000
Total Cost
$508,221
FY
2016
County
ESCAMBIA
Status
C
Scope
CN
Project #
100061682 TAPOA TA13 ()
Project Description
TIGER DRIVE SIDEWALK PROJECT ALONG TIGER DRIVE AND SOWELL STREET IN THE CITY OF BREWTON.
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$166,934
Total Cost
$209,004
FY
2016
County
ETOWAH
Status
A
Scope
CN
Project #
100062567 TAPAA TA14 ()
Project Description
ADA COMPLIANT SIDEWALK IMPROVEMENTS ON SR-1 (US-431 MEIGHAN BOULEVARD) AND SR-291 IN THE CITY LIMITS OF GADSDEN.
URBAN AREA
GADSDEN
Sponsor(s)
  • ALDOT
Federal Share
$400,000
Total Cost
$500,000
FY
2016
County
FAYETTE
Status
C
Scope
CN
Project #
100061739 TAPNU TA13 ()
Project Description
CONSTRUCT SIDEWALKS ALONG SR-18 AND HOMESTEAD STREET IN THE TOWN OF BERRY
URBAN AREA
Sponsor(s)
Federal Share
$305,244
Total Cost
$381,555
FY
2016
County
GENEVA
Status
C
Scope
CN
Project #
100063179 TAPNU TA14 ()
Project Description
SIDEWALK IMPROVEMENTS ALONG SR-52 FROM THE POST OFFICE JUST WEST OF SOUTH REX AVENUE TO KELLY ROAD NORTH IN THE CITY OF SLOCOMB.
URBAN AREA
Sponsor(s)
Federal Share
$169,560
Total Cost
$211,950
FY
2016
County
GENEVA
Status
A
Scope
CN
Project #
100063184 TAPNU TA14 ()
Project Description
DOWNTOWN STREETSCAPE IMPROVEMENTS ON SOUTH COMMERCE STREET FROM EAST CHURCH AVENUE TO EAST CAMPBELL AVENUE IN THE CITY OF GENEVA
URBAN AREA
Sponsor(s)
Federal Share
$278,880
Total Cost
$348,600
FY
2016
County
HENRY
Status
C
Scope
CN
Project #
100063182 TAPOA TA14 ()
Project Description
SIDEWALK CONNECTORS AND DOWNTOWN ADA IMPROVEMENTS ON EAST MAIN STREET, EAST CHURCH STREET, WEST CHURCH STREET, AND SIDEWALKS NEAR THE DOWNTOWN SQUARE IN DOWNTOWN HEADLAND.
URBAN AREA
DOTHAN
Sponsor(s)
  • CITY OF HEADLAND
Federal Share
$119,936
Total Cost
$149,920
FY
2016
County
HOUSTON
Status
C
Scope
CN
Project #
100064537 TAPOA TA15 ()
Project Description
SIDEWALK LOCATED ALONG THE SOUTH SIDE OF WESTGATE PARKWAY, STARTING AT MORRIS SLINGLUFF EL. SCHOOL AND ENDING AT NORTHVIEW HIGH SCHOOL IN DOTHAN.
URBAN AREA
DOTHAN
Sponsor(s)
  • CITY OF DOTHAN
Federal Share
$175,808
Total Cost
$219,760
FY
2016
County
HOUSTON
Status
C
Scope
CN
Project #
100064537 TAPOA TA15 ()
Project Description
SIDEWALK LOCATED ALONG THE SOUTH SIDE OF WESTGATE PARKWAY, STARTING AT MORRIS SLINGLUFF EL. SCHOOL AND ENDING AT NORTHVIEW HIGH SCHOOL IN DOTHAN.
URBAN AREA
DOTHAN
Sponsor(s)
  • CITY OF DOTHAN
Federal Share
$177,167
Total Cost
$221,459
FY
2016
County
JACKSON
Status
A
Scope
CN
Project #
100061731 TAPNU TA13 ()
Project Description
BRIDGEPORT - STEPS TO SAFETY PROJECT STARTING AT 6TH STREET HEADING SOUTHWEST ALONG DR. LEE AVENUE UNTIL 8TH STREET THEN TURNING SOUTH ON 8TH STREET CULMINATING AT MCFARLAND COURT PUBLIC HOUSING, IN THE TOWN OF BRIDGEPORT.
URBAN AREA
Sponsor(s)
Federal Share
$138,000
Total Cost
$172,500
FY
2016
County
JACKSON
Status
A
Scope
CN
Project #
100062583 APL-TAPAA TA14 ()
Project Description
DOWNTOWN PUBLIC SQUARE STREETSCAPE IMPROVEMENTS ON BROAD STREET IN THE CITY OF SCOTTSBORO.
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$800,000
Total Cost
$1,004,574
FY
2016
County
JEFFERSON
Status
A
Scope
CN
Project #
100061589 TAPBH TA13 ()
Project Description
RUFFNER MOUNTAIN CONNECTOR TRAIL ALONG 5TH AVENUE NORTH, 75TH STREET, 85TH STREET, 2ND AVE SOUTH AND 81ST STREET SOUTH WITHIN THE EAST LAKE NEIGHBORHOOD JEFFERSON COUNTY
URBAN AREA
BIRMINGHAM
Sponsor(s)
  • BIRMINGHAM
Federal Share
$400,000
Total Cost
$500,000
FY
2016
County
LEE
Status
C
Scope
CN
Project #
100064539 TAPAA TA15 ()
Project Description
SHARED USE PATH LOCATED ON 1ST AVENUE (FROM SIMMONS STREET TO 10TH STREET) SOUTH RAILROAD (FROM N. 5TH STREET. TO SAMFORD AVENUE.); SAMFORD AVENUE. (FROM SOUTH RAILROAD TO END) IN THE CITY OF OPELIKA.
URBAN AREA
AUBURN-OPELIKA
Sponsor(s)
  • OPELIKA
Federal Share
$153,558
Total Cost
$198,157
FY
2016
County
LIMESTONE
Status
C
Scope
CN
Project #
100061563 TAPOA TA13 ()
Project Description
LIMESTONE COUNTY ARCHIVES DEPOT RESTORATION AND INSTALLMENT OF SPRINKLER SYSTEM ON 310 WEST WASHINGTON /STREET IN ATHENS.
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$303,267
Total Cost
$379,084
FY
2016
County
MADISON
Status
A
Scope
CN
Project #
100063481 TAPHV TA14 ()
Project Description
ALDRIDGE CREEK GREENWAY EXTENSION IN THE CITY OF HUNTSVILLE. THIS PROJECT IS LOCATED SOUTH HUNTSVILLE: FROM WEATHERLY ROAD NORTH TO ESSLINGER ROAD.
URBAN AREA
HUNTSVILLE
Sponsor(s)
  • CITY OF HUNTSVILLE
Federal Share
$816,593
Total Cost
$1,020,741
FY
2016
County
MARSHALL
Status
A
Scope
CN
Project #
100062565 TAPAA TA14 ()
Project Description
DOWNTOWN STREETSCAPE ALONG N. MAIN STREET FROM THE 4TH AVE. NW INTERSECTION TO HWY. 69/CULLMAN RD. IN DOWNTOWN ARAB.
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$400,000
Total Cost
$500,000
FY
2016
County
MOBILE
Status
A
Scope
CN
Project #
100061398 TAPMB-TAPAA TA13 ()
Project Description
ACCESS MANAGEMENT PLAN AND BICYCLE PATH ALONG SR-13 (US-43) IN SARALAND
URBAN AREA
MOBILE
Sponsor(s)
  • CITY OF SARALAND
Federal Share
$366,580
Total Cost
$458,225
FY
2016
County
MOBILE
Status
A
Scope
CN
Project #
100061398 TAPMB-TAPAA TA13 ()
Project Description
ACCESS MANAGEMENT PLAN AND BICYCLE PATH ALONG SR-13 (US-43) IN SARALAND
URBAN AREA
MOBILE
Sponsor(s)
  • CITY OF SARALAND
Federal Share
$149,320
Total Cost
$186,650
FY
2016
County
MOBILE
Status
C
Scope
CN
Project #
100061399 TAPMB TA13 ()
Project Description
SIDEWALK TO ADAMS SCHOOL ALONG BAYOU SARA AVE., BALDWIN RD., SHADY OAK ST, BLACKJACK RD., AND SMOKE AVE ON THE EAST SIDE OF SR-13 (US-43) IN SARALAND.
URBAN AREA
MOBILE
Sponsor(s)
  • CITY OF SARALAND
Federal Share
$153,400
Total Cost
$207,259
FY
2016
County
MOBILE
Status
C
Scope
CN
Project #
100062518 TAPMB TA14 ()
Project Description
MOBILE CO. COMMISSION CONSTRUCTION OF SIDEWALK ALONG BURROUGHS LANE FROM WASHINGTON BOULEVARD TO BURROUGHS ELEMENTARY SCHOOL.
URBAN AREA
MOBILE
Sponsor(s)
  • MOBILE COUNTY
Federal Share
$109,095
Total Cost
$136,369
FY
2016
County
MOBILE
Status
C
Scope
CN
Project #
100062530 TAPMB TA14 ()
Project Description
WEST GRANT STREET SIDEWALK IN THE CITY OF CHICKASAW.
URBAN AREA
MOBILE
Sponsor(s)
  • CHICKASAW
Federal Share
$115,471
Total Cost
$144,339
FY
2016
County
MOBILE
Status
A
Scope
CN
Project #
100062554 TAPAA TA14 ()
Project Description
SIDEWALKS ALONG SR-42 (US-98 MOFFETT ROAD) MCCRARY ROAD AND WULFF ROAD IN THE CITY OF SEMMES.
URBAN AREA
MOBILE
Sponsor(s)
  • CITY OF SEMMES
Federal Share
$196,576
Total Cost
$245,720
FY
2016
County
MOBILE
Status
C
Scope
CN
Project #
100062555 TAPAA TA14 ()
Project Description
SIDEWALKS ALONG SR-13 (US-43), WEST BAYOU AVENUE AND 7TH STREET IN THE CITY OF SATSUMA.
URBAN AREA
MOBILE
Sponsor(s)
  • CITY OF SATSUMA
Federal Share
$364,426
Total Cost
$461,293
FY
2016
County
MOBILE
Status
A
Scope
CN
Project #
100062559 TAPNU TA14 ()
Project Description
DOWNTOWN STREETSCAPE ALONG N. MAIN STREET, NORTH OF E. STATE STREET IN THE CITY OF CITRONELLE.
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$178,812
Total Cost
$223,515
FY
2016
County
MOBILE
Status
C
Scope
CN
Project #
100064504 TAPMB TA15 ()
Project Description
SIDEWALKS ALONG SR-42 (US-98/MOFFETT ROAD) FROM ILLINOIS STREET TO FIRETOWER ROAD IN THE CITY OF SEMMES.
URBAN AREA
MOBILE
Sponsor(s)
  • CITY OF SEMMES
Federal Share
$186,226
Total Cost
$232,782
FY
2016
County
MONROE
Status
A
Scope
CN
Project #
100061757 TAPNU TA13 ()
Project Description
SIDEWALK IMPROVEMENTS ALONG SR-21, SR-41 (ALABAMA AVENUE) RUMBLEY ROAD AND VANITY FAIR DRIVE IN MONROEVILLE.
URBAN AREA
Sponsor(s)
Federal Share
$190,103
Total Cost
$237,629
FY
2016
County
MONROE
Status
C
Scope
CN
Project #
100063107 TAPNU TA14 ()
Project Description
SIDEWALKS ALONG VARIOUS STREETS IN THE TOWN OF EXCEL.
URBAN AREA
Sponsor(s)
Federal Share
$248,526
Total Cost
$312,827
FY
2016
County
MONROE
Status
A
Scope
CN
Project #
100064554 TAPNU TA15 ()
Project Description
SIDEWALK IMPROVEMENTS LOCATED ON SOUTH MOUNT PLEASANT AVENUE IN THE CITY OF MONROEVILLE.
URBAN AREA
Sponsor(s)
Federal Share
$189,672
Total Cost
$237,090
FY
2016
County
MONTGOMERY
Status
C
Scope
CN
Project #
100062516 TAPMN TA14 ()
Project Description
PIKE ROAD NATURE TRAIL, WALLAHATCHIE ROAD PORTION IN THE TOWN OF PIKE ROAD. THIS PROJECT IS LOCATED ON WALLAHATCHIE ROAD AND CONNECTS WITH SR-110.
URBAN AREA
MONTGOMERY
Sponsor(s)
  • TOWN OF PIKE ROAD
Federal Share
$100,569
Total Cost
$125,711
FY
2016
County
PIKE
Status
C
Scope
CN
Project #
100061655 TAPNU TA13 ()
Project Description
SIDEWALK IMPROVEMENTS ALONG GALLOWAY ROAD AND S. A. GRAHAM BOULEVARD IN THE CITY OF BRUNDIDGE.
URBAN AREA
Sponsor(s)
Federal Share
$293,360
Total Cost
$366,700
FY
2016
County
SHELBY
Status
C
Scope
CN
Project #
100061583 TAPAA TA13 ()
Project Description
SIDEWALKS ALONG HEBB ROAD AND MCGOWIN ROAD IN THE TOWN OF WILSONVILLE.
URBAN AREA
BIRMINGHAM
Sponsor(s)
  • WILSONVILLE
Federal Share
$165,558
Total Cost
$206,947
FY
2016
County
STATEWIDE
Status
A
Scope
SP
Project #
100065521 TAPAA NR16 ()
Project Description
STATEWIDE MANAGEMENT FOR THE OUTDOOR ADVERTISING PROGRAM FY-2016 AND FY-2017
URBAN AREA
Sponsor(s)
Federal Share
$960,000
Total Cost
$1,200,000
FY
2016
County
TUSCALOOSA
Status
C
Scope
CN
Project #
100062527 TAPOA TA14 ()
Project Description
SIDEWALKS FROM TOWN HALL TO BALL FIELDS IN THE TOWN OF VANCE. THIS PROJECT IS LOCATED FROM THE NEW VANCE TOWN HALL ON MUNICIPAL DRIVE TO NEW BASEBALL FIELDS ON TINGLE TANGLE ROAD IN VANCE.
URBAN AREA
TUSCALOOSA
Sponsor(s)
  • VANCE TOWN
Federal Share
$223,841
Total Cost
$279,801
FY
2016
County
WASHINGTON
Status
C
Scope
CN
Project #
100063117 TAPNU TA14 ()
Project Description
SIDEWALKS ALONG SR-17, JEFFERSON STREET, CENTRAL AVENUE, MARTIN LUTHER KING, JR. AVENUE, AND BAY AVENUE. IN THE TOWN OF CHATOM.
URBAN AREA
Sponsor(s)
Federal Share
$239,290
Total Cost
$305,945
FY
2016
County
WILCOX
Status
A
Scope
CN
Project #
100061758 TAPNU TA13 ()
Project Description
DOWNTOWN SIDEWALK IMPROVEMENTS ALONG SR-41(CLAIBORNE STREET) IN THE CITY OF CAMDEN.
URBAN AREA
Sponsor(s)
Federal Share
$109,880
Total Cost
$140,076
FY
2016
County
STATEWIDE
Status
P
Scope
SP
Project #
100054492 COUNTY LVOE ()
Project Description
LEVEL OF EFFORT COUNTY ALLOCATED FUNDS FY 2016
URBAN AREA
Sponsor(s)
LVOE Budget
$35,711,000
FY
2016
County
BALDWIN
Status
C
Scope
CN
Project #
100063672 BR 0214 ()
Project Description
BRIDGE REPLACEMENT ON (CR-55) BROAD STREET OVER AN UNNAMED BRANCH OF POLECAT CREEK (BIN 005954)
URBAN AREA
EASTERN SHORE
Sponsor(s)
  • TBD
Federal Share
$914,770
Total Cost
$1,140,556
FY
2016
County
BARBOUR
Status
A
Scope
CN
Project #
100065266 STPNU 0315 ()
Project Description
TRIPLE LAYER BITUMINOUS TREATMENT AND TRAFFIC STRIPE ON CR-15 FROM DALE COUNTY LINE TO SR-51 (SITE 1); CR-79 FROM SR-131 TO SR-30 (SITE 2) - BCP 03-275-15
URBAN AREA
Sponsor(s)
Federal Share
$697,510
Total Cost
$877,230
FY
2016
County
BIBB
Status
A
Scope
CN
Project #
100065647 BR 0415 ()
Project Description
COATING OF SEVEN BRIDGES ON CR-12 (BIN 7677), CR-24 (BIN 5489), CR-26 (BIN 4309), CR-65 (BIN 7658), CR-10 (BIN 4583), HOPEWELL CHURCH ROAD (BIN 11416), AND HARRISBURG ROAD (BIN 7615) - BCP 04-01-14
URBAN AREA
Sponsor(s)
Federal Share
$539,975
Total Cost
$674,968
FY
2016
County
BLOUNT
Status
C
Scope
CN
Project #
100065464 STPNU 0513 ()
Project Description
RESURFACING, TRAFFIC STRIPING, SIGNAGE, INTERSECTION IMPROVEMENTS, AND GUARDRAIL ON CR-39 FROM SR-75 TO ETOWAH COUNTY LINE - BCP 05-148-13
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$1,085,370
Total Cost
$1,356,712
FY
2016
County
BULLOCK
Status
A
Scope
CN
Project #
100063577 STPNU 0614 ()
Project Description
WIDENING, RESURFACING, AND TRAFFIC STRIPE CR-11 FROM CR-8 TO CR-14 - BCP 06-06-13
URBAN AREA
Sponsor(s)
Federal Share
$946,736
Total Cost
$1,183,420
FY
2016
County
CHEROKEE
Status
C
Scope
CN
Project #
100065329 STPNU 1016 ()
Project Description
RESURFACING CR-46 FROM CR-91 TO THE INTERSECTION OF CR-41 - CCP 10-55-16
URBAN AREA
Sponsor(s)
Federal Share
$180,684
Total Cost
$225,855
FY
2016
County
CHEROKEE
Status
C
Scope
CN
Project #
100065331 STPNU 1016 ()
Project Description
RESURFACING CR-47 FROM CR-52 TO THE DEKALB COUNTY LINE - CCP 10-56-16
URBAN AREA
Sponsor(s)
Federal Share
$194,717
Total Cost
$243,396
FY
2016
County
CLARKE
Status
A
Scope
CN
Project #
100065511 STPNU 1316 ()
Project Description
RESURFACE CR-19(ALLEN WALKER ROAD) FROM THE INTERSECTION WITH WALKER SPRINGS ROAD 7.145 MILES TO THE INTERSECTION WITH CR-29 (ALLEN ROAD) - CCP 13-35-15
URBAN AREA
Sponsor(s)
Federal Share
$882,882
Total Cost
$1,103,602
FY
2016
County
COLBERT
Status
C
Scope
CN
Project #
100063667 STPNU 1715 ()
Project Description
STRIPING, PAVEMENT MARKERS, MARKINGS, AND LEGENDS ON ALLBORO RD, MAUD RD, MYNOT RD, MT. HESTER RD, BUGLE LN, WOODMONT DR, MT. STANLEY RD - CCP 17-229-15
URBAN AREA
SHOALS
Sponsor(s)
  • COLBERT COUNTY
Federal Share
$279,742
Total Cost
$349,678
FY
2016
County
COLBERT
Status
C
Scope
CN
Project #
100065301 STPOA 1714 ()
Project Description
RESURFACE CR-22 (OLD HIGHWAY 20) FROM SR-133 EAST TO CR-48
URBAN AREA
SHOALS
Sponsor(s)
  • COLBERT COUNTY
Federal Share
$635,646
Total Cost
$794,557
FY
2016
County
CONECUH
Status
A
Scope
CN
Project #
100061171 STPNU 1814 ()
Project Description
RESURFACE CR-47 FROM CR-24 TO BUTLER COUNTY LINE
URBAN AREA
Sponsor(s)
Federal Share
$355,523
Total Cost
$457,456
FY
2016
County
COOSA
Status
C
Scope
CN
Project #
100065492 STPNU 1915 ()
Project Description
RESURFACE AND TRAFFIC STRIPE CR-66 FROM THE GOODWATER CITY LIMITS TO CR-49 - CCP 19-134-15
URBAN AREA
Sponsor(s)
Federal Share
$517,500
Total Cost
$646,888
FY
2016
County
COOSA
Status
A
Scope
PE
Project #
100065651 BRZ 1916 ()
Project Description
PRECAST ON CR-15 AT WEOGUFKA CREEK BIN # 5175
URBAN AREA
Sponsor(s)
Federal Share
$7,539
Total Cost
$9,423
FY
2016
County
CRENSHAW
Status
C
Scope
CN
Project #
100065752 STPNU 2116 ()
Project Description
PATCH,LEVEL,SURFACE TREAT AND RESURFACE PETRY HIGHWAY (CR-59) FROM LIVE OAK ROAD (CR-50) TO BODIFORD POOL/BEAVER POND ROAD (CR-30) - CCP 21-195-12
URBAN AREA
Sponsor(s)
Federal Share
$614,190
Total Cost
$767,733
FY
2016
County
CULLMAN
Status
A
Scope
CN
Project #
100065440 STPAA 2215 ()
Project Description
RESURFACE AND TRAFFIC STRIPE CR-222 FROM CR-410 TO GOOD HOPE CITY LIMITS - CCP 22-67-16
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$913,304
Total Cost
$1,141,630
FY
2016
County
DALE
Status
A
Scope
PE
Project #
100065334 STPNU 2314 ()
Project Description
INTERSECTION IMPROVEMENTS OF SR-123/CR-18 AND SR-53 (US-231/CR-18), INCLUDING WIDENING AND RESURFACING CR-18 FROM SR-123 TO SR-53 (US-231) AND TURNLANES INTO THE WAYNE FARMS PROPERTY TO BENEFIT WAYNE FARMS FEEDMILL.
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$52,008
Total Cost
$63,578
FY
2016
County
DALLAS
Status
A
Scope
CN
Project #
100065541 STPNU 2416 ()
Project Description
RESURFACE AND STRIPE ON CR-222 FROM CR-37 TO SR-22 (DCP 24-128-13)
URBAN AREA
Sponsor(s)
Federal Share
$551,763
Total Cost
$689,703
FY
2016
County
ELMORE
Status
C
Scope
CN
Project #
100065138 STPOA 2614 ()
Project Description
LEVEL, RESURFACE, AND TRAFFIC STRIPE POSSUM TROT ROAD FROM COOSA RIVER ROAD EAST 1.778 MILES TO LIGHTWOOD ROAD - ECP 26-27-14
URBAN AREA
MONTGOMERY
Sponsor(s)
  • TBD
Federal Share
$252,316
Total Cost
$315,395
FY
2016
County
FRANKLIN
Status
A
Scope
PE
Project #
100065258 BRZ 3015 ()
Project Description
BRIDGE REPLACEMENT OF BIN# 5145 ON CR-8 OVER IVY BRANCH (DISMAL BRANCH) THROUGH STATE SERVICES.
URBAN AREA
Sponsor(s)
Federal Share
$23,123
Total Cost
$28,904
FY
2016
County
FRANKLIN
Status
A
Scope
CN
Project #
100065588 STPNU 3015 ()
Project Description
CULVERT EXTENSIONS, PATCH, LEVEL, AND TRAFFIC STRIPE CR-23 FROM CR-11 TO SR-19 - FCP 30-12-14
URBAN AREA
Sponsor(s)
Federal Share
$75,684
Total Cost
$94,605
FY
2016
County
FRANKLIN
Status
A
Scope
CN
Project #
100065588 STPNU 3015 ()
Project Description
CULVERT EXTENSIONS, PATCH, LEVEL, AND TRAFFIC STRIPE CR-23 FROM CR-11 TO SR-19 - FCP 30-12-14
URBAN AREA
Sponsor(s)
Federal Share
$661,725
Total Cost
$827,156
FY
2016
County
GENEVA
Status
C
Scope
CN
Project #
100065272 STPNU 3115 ()
Project Description
RESURFACING AND TRAFFIC STRIPE ON CR-4 FROM SR-52 TO SPRING CREEK RD - GCP 31-01-15
URBAN AREA
Sponsor(s)
Federal Share
$113,803
Total Cost
$142,254
FY
2016
County
GENEVA
Status
C
Scope
CN
Project #
100065273 STPNU 3115 ()
Project Description
WIDENING, RESURFACING AND TRAFFIC STRIPE ON CR-65 FROM CR-4 TO SR-52 - GCP 31-02-15
URBAN AREA
Sponsor(s)
Federal Share
$431,345
Total Cost
$539,195
FY
2016
County
GREENE
Status
A
Scope
CN
Project #
100064748 STPNU 3214 ()
Project Description
FULL DEPTH RECLAMATION, RESURFACING AND STRIPING ON CR-148 FROM SR-13(US-43) TO DOLLAR HIDE CAMP - GCP 32-01-13
URBAN AREA
Sponsor(s)
Federal Share
$438,297
Total Cost
$547,871
FY
2016
County
HENRY
Status
C
Scope
CN
Project #
100064565 STPNU 3413 ()
Project Description
PATCH, LEVEL, RESURFACE AND TRAFFIC STRIPE CR-45 FROM SR-1 (US-431) NORTH TO SR-173 - HCP 34-22-13
URBAN AREA
Sponsor(s)
Federal Share
$276,259
Total Cost
$345,324
FY
2016
County
HOUSTON
Status
C
Scope
CN
Project #
100065457 STPNU 3516 ()
Project Description
G-TREATMENT, LEVELING, RESURFACE, AND STRIPE CR-55 FROM A PAVEMENT JOINT APPROXIMATELY 40 FT SOUTH OF NOBLES ROAD TO A PAVEMENT JOINT NORTH OF ASHFORD CITY LIMIT (APPROXIMATELY 0.34 MILE NORTH OF GARRETT ROAD) - HCP 35-392-16
URBAN AREA
Sponsor(s)
Federal Share
$917,782
Total Cost
$1,147,246
FY
2016
County
HOUSTON
Status
C
Scope
CN
Project #
100065617 STPOA 3516 ()
Project Description
G-TREATMENT, RESURFACE, AND TEMPORARY STRIPE S. BAY SPRINGS ROAD (CR-49) FROM THE GENEVA COUNTY LINE TO THE INTERSECTION OF FORTNER STREET - HCP 35-395-16
URBAN AREA
DOTHAN
Sponsor(s)
  • HOUSTON COUNTY
Federal Share
$79,655
Total Cost
$99,569
FY
2016
County
JACKSON
Status
C
Scope
CN
Project #
100063643 STPNU 3614 ()
Project Description
RESURFACING, SHOULDERS, AND TRAFFIC STRIPE ON CR-33 FROM RAILROAD STREET TO CR-229 - JCP 36-39-12
URBAN AREA
Sponsor(s)
Federal Share
$434,648
Total Cost
$543,310
FY
2016
County
JEFFERSON
Status
C
Scope
PE
Project #
100065237 BR 3715 ()
Project Description
BRIDGE REPLACEMENT AND APPROACHES OF BIN# 3374 ON BRADFORD TRAFFORD ROAD (CR-121) OVER GURLEY CREEK
URBAN AREA
BIRMINGHAM
Sponsor(s)
  • ALDOT
Federal Share
$31,946
Total Cost
$38,975
FY
2016
County
JEFFERSON
Status
A
Scope
CN
Project #
100065369 BR 3713 ()
Project Description
BRIDGE REPLACEMENT AND APPROACHES ON THE SOUTHBOUND ROADWAY OF CR-65 (MINOR PARKWAY) OVER BNSF RAILROAD TO INCLUDE TRAFFIC SIGNAL REPLACEMENT BIN # 4911- JCP 37-65-14
URBAN AREA
BIRMINGHAM
Sponsor(s)
  • TBD
Federal Share
$3,271,149
Total Cost
$4,088,936
FY
2016
County
LAUDERDALE
Status
C
Scope
CN
Project #
100065137 STPNU 3915 ()
Project Description
RESURFACING AND STRIPING ON CR-11 FROM SR-157 TO CR-8 (SITE 1) AND CR-51 FROM CR-92 TO CR-76 (SITE 2) - LCP 39-162-15
URBAN AREA
Sponsor(s)
Federal Share
$469,661
Total Cost
$587,077
FY
2016
County
LIMESTONE
Status
C
Scope
CN
Project #
100064068 STPAA-STPOA 4214 ()
Project Description
RESURFACE AND STRIPE EAST LIMESTONE ROAD FROM SR-2(US-72) TO COPELAND ROAD - LCP 42-163-14
URBAN AREA
HUNTSVILLE
Sponsor(s)
  • LIMESTONE COUNTY
Federal Share
$201,351
Total Cost
$251,689
FY
2016
County
LIMESTONE
Status
C
Scope
CN
Project #
100064068 STPAA-STPOA 4214 ()
Project Description
RESURFACE AND STRIPE EAST LIMESTONE ROAD FROM SR-2(US-72) TO COPELAND ROAD - LCP 42-163-14
URBAN AREA
HUNTSVILLE
Sponsor(s)
  • LIMESTONE COUNTY
Federal Share
$395,222
Total Cost
$494,027
FY
2016
County
LOWNDES
Status
A
Scope
CN
Project #
100065408 STPNU 4315 ()
Project Description
PATCHING, LEVELING, RESURFACING AND GUARDRAIL ON CR-23 FROM SR-8 (US-80) NORTH TO CR-40 - LCP 43-01-14
URBAN AREA
Sponsor(s)
Federal Share
$539,665
Total Cost
$674,581
FY
2016
County
LOWNDES
Status
A
Scope
CN
Project #
100065408 STPNU 4315 ()
Project Description
PATCHING, LEVELING, RESURFACING AND GUARDRAIL ON CR-23 FROM SR-8 (US-80) NORTH TO CR-40 - LCP 43-01-14
URBAN AREA
Sponsor(s)
Federal Share
$73,556
Total Cost
$116,925
FY
2016
County
MACON
Status
C
Scope
CN
Project #
100065119 STPOA-STPNU 4415 ()
Project Description
RESURFACE AND TRAFFIC STRIPE CR-69 FROM CR-22 TO SR-8(US-80) (SITE 1);CR-57 FROM CR-59 TO CR-54 (SITE 2);CR-21 FROM TUSKEGEE CITY LIMITS TO SR-199 (SITE 3) - MCP 44-132-15
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$155,910
Total Cost
$194,888
FY
2016
County
MACON
Status
C
Scope
CN
Project #
100065119 STPOA-STPNU 4415 ()
Project Description
RESURFACE AND TRAFFIC STRIPE CR-69 FROM CR-22 TO SR-8(US-80) (SITE 1);CR-57 FROM CR-59 TO CR-54 (SITE 2);CR-21 FROM TUSKEGEE CITY LIMITS TO SR-199 (SITE 3) - MCP 44-132-15
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$591,037
Total Cost
$738,828
FY
2016
County
MOBILE
Status
A
Scope
CN
Project #
100061186 ACBRZ61186 ATRP ()
Project Description
BRIDGE AND APPROACHES CR-63 (WILMER-GEORGETOWN ROAD) OVER BIG CREEK BIN # 4901
URBAN AREA
Sponsor(s)
Federal Share
$130,400
Total Cost
$163,000
FY
2016
County
MOBILE
Status
A
Scope
CN
Project #
100064871 STPAA 4915 ()
Project Description
WIDENING, RESURFACING, GUARDRAIL AND STRIPING DAWES ROAD (CR-33) FROM THREE NOTCH ROAD (CR-32) TO PAVEMENT JOINT APPROXIMATELY 350 FEET SOUTH OF SCOTT DAIRY LOOP ROAD S. - MCP 49-081-15
URBAN AREA
MOBILE
Sponsor(s)
  • ALDOT
Federal Share
$730,129
Total Cost
$924,344
FY
2016
County
MONROE
Status
C
Scope
CN
Project #
100065404 STPNU 5015 ()
Project Description
WIDEN, LEVEL, RESURFACE AND TRAFFIC STRIPE CR-49 FROM THE CLARKE COUNTY LINE TO THE END OF PAVED ROADWAY (APPROX. 5.6 MILES) - MCP 50-06-15
URBAN AREA
Sponsor(s)
Federal Share
$1,048,771
Total Cost
$1,310,964
FY
2016
County
MONTGOMERY
Status
C
Scope
CN
Project #
100065619 STPNU 5115 ()
Project Description
RESURFACING CR-89 (MOORE ROAD) FROM SR-94 TO SR-53 (US-231)
URBAN AREA
Sponsor(s)
Federal Share
$472,696
Total Cost
$590,870
FY
2016
County
MORGAN
Status
C
Scope
CN
Project #
100064684 STPNU 5214 ()
Project Description
PARTIAL WIDENING, RESURFACE, TRAFFIC STRIPE AND INSTALL GUARDRAIL ON CR-73 (EVA ROAD) FROM PECK MOUNTAIN ROAD TO SR-67 - MCP 52-141-14
URBAN AREA
Sponsor(s)
Federal Share
$694,902
Total Cost
$868,627
FY
2016
County
PICKENS
Status
A
Scope
CN
Project #
100065652 STPNU 5416 ()
Project Description
RESURFACING AND STRIPING ON CR-9 FROM THE INTERSECTION OF SR-86 TO THE INTERSECTION OF SR-6(US-82) - PCP 54-25-15
URBAN AREA
Sponsor(s)
Federal Share
$406,299
Total Cost
$507,874
FY
2016
County
PIKE
Status
C
Scope
CN
Project #
100065857 STPAA 5516 ()
Project Description
PATCHING, LEVELING, RESURFACING, AND TRAFFIC STRIPE ON CR-5516 FROM SR-10(US-231) NORTH TO CR-5513 - PCP 55-14-15
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$281,816
Total Cost
$352,270
FY
2016
County
SHELBY
Status
C
Scope
SP
Project #
100065215 STPAA 5916 ()
Project Description
20-YEAR RECERTIFICATION REPAIRS ON SHELBY COUNTY'S SNOOPER TRUCK.
URBAN AREA
BIRMINGHAM
Sponsor(s)
  • TBD
Federal Share
$252,816
Total Cost
$316,020
FY
2016
County
SUMTER
Status
A
Scope
PE
Project #
100064997 BRZ 6016 ()
Project Description
BRIDGE REPLACEMENT ON PAYNEVILLE-MILLVILLE ROAD OVER SUCARNOOCHEE RIVER, BIN 000064
URBAN AREA
Sponsor(s)
Federal Share
$20,800
Total Cost
$26,000
FY
2016
County
SUMTER
Status
A
Scope
PE
Project #
100064998 BRZ 6015 ()
Project Description
BRIDGE REPLACEMENTS ON PAYNEVILLE-MILLVILLE ROAD OVER EDMONDS CREEK (BIN 14089) AND UNNAMED CREEK (BIN 12808)
URBAN AREA
Sponsor(s)
Federal Share
$71,866
Total Cost
$89,832
FY
2016
County
TALLADEGA
Status
A
Scope
PE
Project #
100065355 BR 6116 ()
Project Description
BRIDGE REPLACEMENT CR-207 (STEMLEY ROAD) OVER CHOCCOLOCCO CREEK BIN# 8456
URBAN AREA
Sponsor(s)
Federal Share
$44,192
Total Cost
$55,240
FY
2016
County
TALLAPOOSA
Status
C
Scope
CN
Project #
100064672 STPNU 6215 ()
Project Description
WIDEN, RESURFACE AND STRIPE CR-41 (COWPENS ROAD) FROM CR-61 (GOLDVILLE CUT OFF ROAD) EAST TO SR-22 - TCP 62-39-15
URBAN AREA
Sponsor(s)
Federal Share
$281,176
Total Cost
$624,838
FY
2016
County
WALKER
Status
A
Scope
CN
Project #
100064935 STPNU 6415 ()
Project Description
RESURFACE, STRIPING AND GUARDRAIL ON NEW OAKMAN HIGHWAY FROM MARKET STREET IN OAKMAN TO THE ROW OF SR-269 IN PARRISH - WCP 64-56-12
URBAN AREA
Sponsor(s)
Federal Share
$1,566,873
Total Cost
$1,958,591
FY
2016
County
WASHINGTON
Status
A
Scope
CN
Project #
100063475 STPNU 6514 ()
Project Description
RESURFACE AND TRAFFIC STRIPE CR-19 FROM CR-35 TO CR-20 - WCP 65-91-13
URBAN AREA
Sponsor(s)
Federal Share
$1,094,865
Total Cost
$1,368,581
FY
2016
County
WILCOX
Status
A
Scope
CN
Project #
100063477 STPNU 6614 ()
Project Description
RESURFACE CR-27 FROM THE CLARKE COUNTY LINE TO CHURCH STREET - WCP 66-01-12
URBAN AREA
Sponsor(s)
Federal Share
$973,859
Total Cost
$1,217,324
FY
2016
County
WILCOX
Status
A
Scope
CN
Project #
100065382 STPNU 6616 ()
Project Description
RESURFACE CR-18 FROM CR-27 TO SR-10 - WCP 66-02-12
URBAN AREA
Sponsor(s)
Federal Share
$838,387
Total Cost
$1,047,984
FY
2016
County
STATEWIDE
Status
P
Scope
SP
Project #
100040750 STATE RESURFACING LVOE ()
Project Description
LEVEL OF EFFORT FEDERAL AID RESURFACING EAST CENTRAL REGION FY 2016
URBAN AREA
Sponsor(s)
LVOE Budget
$37,440,000
FY
2016
County
STATEWIDE
Status
P
Scope
SP
Project #
100043502 STATE RESURFACING LVOE ()
Project Description
FY-2016 LEVEL OF EFFORT FEDERAL AID RESURFACING SOUTHEAST REGION
URBAN AREA
Sponsor(s)
LVOE Budget
$54,080,000
FY
2016
County
STATEWIDE
Status
P
Scope
SP
Project #
100057572 STATE RESURFACING LVOE ()
Project Description
LEVEL OF EFFORT FEDERAL AID RESURFACING NORTH REGION FOR FY 2016
URBAN AREA
Sponsor(s)
LVOE Budget
$45,760,000
FY
2016
County
STATEWIDE
Status
P
Scope
SP
Project #
100063429 STATE RESURFACING LVOE ()
Project Description
LEVEL OF EFFORT FEDERAL AID RESURFACING WEST CENTRAL REGION FY 2016
URBAN AREA
Sponsor(s)
LVOE Budget
$33,280,000
FY
2016
County
STATEWIDE
Status
P
Scope
SP
Project #
100063433 STATE RESURFACING LVOE ()
Project Description
LEVEL OF EFFORT FEDERAL AID RESURFACING SOUTH WEST REGION FOR FY 2016
URBAN AREA
Sponsor(s)
LVOE Budget
$37,440,000
FY
2016
County
BALDWIN
Status
C
Scope
FM
Project #
100064388 STPAA 0225 ()
Project Description
RESURFACING ON SR-225 FROM CR-138 (HURRICANE RD.) (MP 12.03) (STA. 635+00) TO SR-59 IN STOCKTON (MP 23.91) (STA. 1262+51) AND CULVERT REPLACEMENT (MP 16.48) (STA. 870+32)
URBAN AREA
Sponsor(s)
Federal Share
$2,340,176
Total Cost
$2,929,503
FY
2016
County
BALDWIN
Status
C
Scope
FM
Project #
100064397 STPAA 0016 ()
Project Description
RESURFACING ON SR-16 (US-90) FROM SR-59 TO THE FL/AL STATE LINE
URBAN AREA
EASTERN SHORE
Sponsor(s)
  • TBD
Federal Share
$2,583,450
Total Cost
$3,232,634
FY
2016
County
BALDWIN
Status
C
Scope
FM
Project #
100065744 STPAA 0003 ()
Project Description
RESURFACING ON SR-3 (US-31) FROM SR-16 (US-90) TO JUST WEST OF SPANISH VILLAGE
URBAN AREA
EASTERN SHORE
Sponsor(s)
  • TBD
Federal Share
$360,805
Total Cost
$451,676
FY
2016
County
BARBOUR
Status
C
Scope
FM
Project #
100060430 NH-HSIP 0001 ()
Project Description
RESURFACING AND WIDENING (2' SAFETY WIDENING) ON SR-1 (US-431) FROM JUST SOUTH OF SR-131 TO NORTH OF SR-6 (US-82). BRIDGE RAIL RETROFITTING THE NORTH AND SOUTH BOUND BRIDGES OVER CHENEYHATCHEE CREEK AND BARBOUR CREEK.
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$4,219,679
Total Cost
$5,280,898
FY
2016
County
BARBOUR
Status
C
Scope
FM
Project #
100065129 STPAA 0239 ()
Project Description
TRIPLE LAYER SURFACE TREATMENT ON SR-239 FROM STINKING CREEK TO THE BULLOCK COUNTY LINE
URBAN AREA
Sponsor(s)
Federal Share
$471,569
Total Cost
$590,347
FY
2016
County
BARBOUR
Status
C
Scope
FM
Project #
100065269 NH 0006 ()
Project Description
RESURFACING SR-6 (US-82) FROM SR-1 TO THE GEORGIA STATE LINE AND REMOVAL OF ABANDONED RAILROAD CROSSINGS
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$457,782
Total Cost
$572,250
FY
2016
County
BIBB
Status
C
Scope
FM
Project #
100064308 NH 0005 ()
Project Description
RESURFACING ON SR-5 FROM WEST BLOCTON SOUTH CITY LIMITS TO MP 105.468
URBAN AREA
Sponsor(s)
Federal Share
$3,503,886
Total Cost
$4,380,858
FY
2016
County
BUTLER
Status
A
Scope
FM
Project #
100065058 STPAA-HSIP 0003 ()
Project Description
SR-3 (US-31) FROM JUST NORTH OF CR-37 TO THE EXISTING JOINT (MP 133.3) PLANING, RESURFACING AND 2' WIDENING
URBAN AREA
Sponsor(s)
Federal Share
$2,178,138
Total Cost
$2,722,673
FY
2016
County
CALHOUN
Status
C
Scope
FM
Project #
100064213 STPOA 0204 ()
Project Description
RESURFACE AND BRIDGE RAIL RETROFIT SR-204 FROM JCT SR-1 (US-431) MP 0.000 TO MP 6.620 (WEST POINT RD./PLEASANT VALLEY RD.)
URBAN AREA
ANNISTON
Sponsor(s)
  • TBD
Federal Share
$2,655,549
Total Cost
$3,322,262
FY
2016
County
CALHOUN
Status
C
Scope
FM
Project #
100064580 STPAA-HSIP 0004 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-4 (US-78) FROM MP 166.715 TO JUST WEST OF CLEBURNE COUNTY LINE MP 171.122
URBAN AREA
ANNISTON
Sponsor(s)
  • TBD
Federal Share
$1,653,904
Total Cost
$2,067,582
FY
2016
County
CHAMBERS
Status
A
Scope
FM
Project #
100062399 NH-HSIP 0001 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-1 (US-431) NORTH OF LAFAYETTE CITY LIMITS MP 161.640 TO SOUTH TOWN LIMITS OF FIVE POINTS MP 169.779
URBAN AREA
Sponsor(s)
Federal Share
$2,439,542
Total Cost
$3,049,427
FY
2016
County
CHEROKEE
Status
C
Scope
FM
Project #
100062714 STPAA 0025 ()
Project Description
RESURFACE SR-25(US-411) FROM NORTH OF CENTRE BY-PASS MP 238.55 THRU THE CITY OF CENTRE MP 243.800
URBAN AREA
Sponsor(s)
Federal Share
$1,660,067
Total Cost
$2,077,603
FY
2016
County
CHEROKEE
Status
C
Scope
FM
Project #
100062715 STPAA 0025 ()
Project Description
RESURFACING SR-25 (US-411) FROM JUST SOUTH OF SR-283 (411 BY-PASS) TO JUST EAST OF CR-161 (MP 249.000)
URBAN AREA
Sponsor(s)
Federal Share
$1,404,184
Total Cost
$1,757,472
FY
2016
County
CHEROKEE
Status
A
Scope
FM
Project #
100062989 STPAA 0009 ()
Project Description
RESURFACING SR-9 FROM THE INTERSECTION OF SR-25(US-411) TO THE INTERSECTION WITH SR-68
URBAN AREA
Sponsor(s)
Federal Share
$415,683
Total Cost
$519,603
FY
2016
County
CHILTON
Status
A
Scope
FM
Project #
100063149 STPAA 0022 ()
Project Description
RESURFACING SR-22 FROM JUST EAST OF CR-15 AT MP 58.25 TO JUST WEST OF CR-53 AT MP 64.90
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$2,819,541
Total Cost
$3,524,426
FY
2016
County
CLARKE
Status
C
Scope
FM
Project #
100051515 NHF-HSIPF 0013 ()
Project Description
SR-13 (US-43) RESURFACING AND SAFETY WIDENING AND IMPROVEMENTS FROM NEAR CR-10(WALKER SPRINGS RD) TO 0.2 MILE NORTH CR-3
URBAN AREA
Sponsor(s)
Federal Share
$1,275,356
Total Cost
$1,594,982
FY
2016
County
CLARKE
Status
C
Scope
FM
Project #
100063487 STPAA 0177 ()
Project Description
PLANING AND RESURFACING ON SR-177 FROM SR-13 (US-43) TO MILLER STREET
URBAN AREA
Sponsor(s)
Federal Share
$1,007,449
Total Cost
$1,260,253
FY
2016
County
CLARKE
Status
C
Scope
FM
Project #
100064456 STPAA-HSIP 0069 ()
Project Description
2 FT SAFETY WIDENING AND RESURFACING ON SR-69 FROM TALLAHATTA CREEK TO BASHI CREEK
URBAN AREA
Sponsor(s)
Federal Share
$460,004
Total Cost
$575,004
FY
2016
County
CLAY
Status
C
Scope
FM
Project #
100064585 STPAA-HSIP 0077 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-77 FROM JCT SR-49 MP 34.215 TO .3 MILE NORTH OF IDAHO ROAD MP 43.860
URBAN AREA
Sponsor(s)
Federal Share
$1,565,959
Total Cost
$1,957,461
FY
2016
County
CLEBURNE
Status
A
Scope
FM
Project #
100064210 STPAA-HSIP 0046 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-46 FROM SOUTH SIDE OF I-20 MP 5.005 TO MP 10.954
URBAN AREA
Sponsor(s)
Federal Share
$2,355,082
Total Cost
$2,943,853
FY
2016
County
COFFEE
Status
C
Scope
FM
Project #
100064173 STPOA 0027 ()
Project Description
RESURFACING ON SR-27 FROM NORTH OF CR-636 TO SR-192 (BOLL WEEVIL CIRCLE)
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$1,528,296
Total Cost
$1,912,996
FY
2016
County
COFFEE
Status
C
Scope
FM
Project #
100065145 STPAA 0167 ()
Project Description
RESURFACING SR-167 FROM SOUTH OF PEA RIVER AT CR-154 TO PIKE COUNTY LINE
URBAN AREA
Sponsor(s)
Federal Share
$3,448,948
Total Cost
$4,314,200
FY
2016
County
COLBERT
Status
C
Scope
FM
Project #
100063933 STPAA 0247 ()
Project Description
RESURFACING AND TRAFFIC STRIPING SR-247 FROM STA. 20+00 (MP 20.820) AT CR-49 TO STA. 231+82 (MP 24.850) AT SR-2 (US-72)
URBAN AREA
SHOALS
Sponsor(s)
  • ALDOT
Federal Share
$720,813
Total Cost
$901,351
FY
2016
County
COLBERT
Status
C
Scope
FM
Project #
100064618 NH 0020 ()
Project Description
MAINTENANCE RESURFACING ON SR-20 FROM SR-157 (MP 32.19) TO CR-48 (MP 36.22)
URBAN AREA
SHOALS
Sponsor(s)
  • ALDOT
Federal Share
$1,428,089
Total Cost
$1,786,318
FY
2016
County
CONECUH
Status
C
Scope
FM
Project #
100064396 NH 0003 ()
Project Description
RESURFACING ON SR-3 (US-31) FROM PAVEMENT JOINT JUST SOUTH OF THE ESCAMBIA COUNTY LINE TO PAVEMENT JOINT AT THE INTERSECTION OF SR-12 (US-84)
URBAN AREA
Sponsor(s)
Federal Share
$1,951,300
Total Cost
$2,439,611
FY
2016
County
COOSA
Status
C
Scope
FM
Project #
100064211 STPAA-HSIP 0022 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-22 FROM MP 89.308 TO JCT OF SR-21 (US-231) MP 95.965
URBAN AREA
Sponsor(s)
Federal Share
$2,093,865
Total Cost
$2,618,558
FY
2016
County
COVINGTON
Status
C
Scope
FM
Project #
100064175 STPAA-HSIP 0055 ()
Project Description
RESURFACING AND 2 FT SAFETY WIDENING ON SR-55 FROM PAVING JOINT SOUTH OF POPLAR STREET TO YELLOW RIVER
URBAN AREA
Sponsor(s)
Federal Share
$2,126,879
Total Cost
$2,660,854
FY
2016
County
CRENSHAW
Status
C
Scope
FM
Project #
100065131 NH 0009 ()
Project Description
RESURFACING OF SR-9 (US-331) FROM NORTH OF FULTON AVENUE IN BRANTLEY TO SOUTH OF MEADOW CREST DRIVE IN LUVERNE
URBAN AREA
Sponsor(s)
Federal Share
$2,781,605
Total Cost
$3,481,119
FY
2016
County
CULLMAN
Status
C
Scope
FM
Project #
100062717 STPAA 0091 ()
Project Description
RESURFACE SR-91 FROM SOUTH OF CULLMAN CR-38 TO SR-3(US-31) IN HANCEVILLE
URBAN AREA
Sponsor(s)
Federal Share
$2,570,317
Total Cost
$3,215,550
FY
2016
County
CULLMAN
Status
A
Scope
FM
Project #
100062718 NH-HSIP 0074 ()
Project Description
RESURFACE AND SAFETY IMPROVEMENTS ON SR-74 (US-278) FROM JUST WEST OF I-65 TO SR-3 (US-31) IN CULLMAN
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$1,094,400
Total Cost
$1,368,000
FY
2016
County
CULLMAN
Status
A
Scope
FM
Project #
100062993 STPAA-HSIP 0069 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-69 FROM SR-3 (US-31) TO SR-74 (US-278) IN CULLMAN
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$1,268,000
Total Cost
$1,585,000
FY
2016
County
DALE
Status
C
Scope
FM
Project #
100065142 STPAA-HSIP 0092 ()
Project Description
TRIPLE LAYER SURFACE TREATMENT AND 2' SAFETY WIDENING ON SR-92 FROM SR-167 TO SR-12 (US-84)
URBAN AREA
Sponsor(s)
Federal Share
$1,410,058
Total Cost
$1,763,560
FY
2016
County
DALLAS
Status
A
Scope
FM
Project #
100060034 NH 0008 ()
Project Description
PLANING AND RESURFACING SR-8 (US-80) FROM THE JUNCTION OF SR-14 AND SR-22 TO THE EDMOND PETTUS BRIDGE
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$1,220,162
Total Cost
$1,525,203
FY
2016
County
DALLAS
Status
C
Scope
FM
Project #
100064449 NH 0005 ()
Project Description
PLANE AND RESURFACE SR-5 FROM THE WILCOX COUNTY LINE TO THE NORTH OF THE INTERSECTION OF CR-21
URBAN AREA
Sponsor(s)
Federal Share
$1,669,298
Total Cost
$2,088,217
FY
2016
County
DEKALB
Status
A
Scope
FM
Project #
100062726 STPAA-HSIP 0117 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-117 FROM THE GA STATE LINE TO SR-7(US-11) IN HAMMONDVILLE
URBAN AREA
Sponsor(s)
Federal Share
$4,169,815
Total Cost
$5,212,269
FY
2016
County
DEKALB
Status
C
Scope
FM
Project #
100062742 STPAA-HSIP 0227 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-227 FROM SR-68 IN CROSSVILLE TO SR-75 IN GERALDINE
URBAN AREA
Sponsor(s)
Federal Share
$1,246,982
Total Cost
$1,559,302
FY
2016
County
ELMORE
Status
C
Scope
FM
Project #
100056610 STPAA-HSIP 0111 ()
Project Description
RESURFACING AND 2 FT SAFETY WIDENING ON SR-111 FROM HOGAN ROAD TO SR-143
URBAN AREA
MONTGOMERY
Sponsor(s)
  • ALDOT
Federal Share
$756,422
Total Cost
$945,536
FY
2016
County
ESCAMBIA
Status
C
Scope
FM
Project #
100064390 NH 0003 ()
Project Description
RESURFACING ON SR-3 (US-31) FROM JOINT JUST NORTH OF TIGER DR./DOUGLASS LN. TO JOINT JUST SOUTH OF THE CONECUH COUNTY LINE
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$1,546,415
Total Cost
$1,933,832
FY
2016
County
ESCAMBIA
Status
C
Scope
FM
Project #
100065743 RECA 0021 ()
Project Description
RESURFACING ON SR-21 FROM FLORIDA STATE LINE TO JOINT AT MP 0.968
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$332,985
Total Cost
$416,340
FY
2016
County
ETOWAH
Status
A
Scope
FM
Project #
100064333 NH 0759 ()
Project Description
RESURFACE SR-759 FROM THE END OF I-759 (MP. 4.935) SR-291 (MP. 5.407)
URBAN AREA
GADSDEN
Sponsor(s)
  • ALDOT
Federal Share
$373,791
Total Cost
$467,238
FY
2016
County
FAYETTE
Status
C
Scope
FM
Project #
100064492 NH 0013 ()
Project Description
RESURFACING ON SR-13 (US-43) FROM TUSCALOOSA COUNTY LINE AT MP 223.04 TO THE BERRY "Y" AT MP 226.643
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$2,023,874
Total Cost
$2,529,859
FY
2016
County
FRANKLIN
Status
C
Scope
FM
Project #
100064624 STPAA 0172 ()
Project Description
MAINTENANCE RESURFACING ON SR-172 FROM SR-19 (MP 0.0) TO NEAR WILSON WEST ROAD (MP 5.60)
URBAN AREA
Sponsor(s)
Federal Share
$1,388,540
Total Cost
$1,736,364
FY
2016
County
FRANKLIN
Status
C
Scope
FM
Project #
100064632 STPAA 0187 ()
Project Description
MAINTENANCE RESURFACING ON SR-187 FROM SR-172 (MP 9.69) TO CR-22 (MP 17.27)
URBAN AREA
Sponsor(s)
Federal Share
$1,771,767
Total Cost
$2,215,485
FY
2016
County
GENEVA
Status
C
Scope
FM
Project #
100064172 STPAA-HSIP 0052 ()
Project Description
RESURFACING AND 2' SAFETY WIDENING SR-52 FROM SR-196 TO GENEVA EAST CITY LIMITS
URBAN AREA
Sponsor(s)
Federal Share
$1,298,687
Total Cost
$1,625,350
FY
2016
County
GENEVA
Status
C
Scope
FM
Project #
100065128 STPAA-HSIP 0027 ()
Project Description
2' SAFETY WIDENING AND RESURFACING OF SR-27 FROM JUNCTION SR-52 TO JUNCTION CR-8
URBAN AREA
Sponsor(s)
Federal Share
$763,477
Total Cost
$955,849
FY
2016
County
GENEVA
Status
C
Scope
FM
Project #
100065130 STPAA 0052 ()
Project Description
RESURFACE SR-52 FROM THE INTERSECTION OF SR-167 TO THE END OF THE CURB AT THE INTERSECTION OF CR-69
URBAN AREA
Sponsor(s)
Federal Share
$697,129
Total Cost
$871,423
FY
2016
County
GREENE
Status
A
Scope
FM
Project #
100064493 STPAA-HSIP 0007 ()
Project Description
RESURFACING AND 2' SAFETY WIDENING ON SR-7 FROM THE END OF THE CURB AND GUTTER SECTION AT MP 44.654 TO JUST SOUTH OF CR-208 AT MP 49.011
URBAN AREA
Sponsor(s)
Federal Share
$2,015,890
Total Cost
$2,519,863
FY
2016
County
HENRY
Status
C
Scope
FM
Project #
100063598 STPAA-HSIP 0095 ()
Project Description
RESURFACING AND 2' SAFETY WIDENING ON SR-95 FROM CR-46 IN ABBEVILLE TO NORTH OF CR-92
URBAN AREA
Sponsor(s)
Federal Share
$1,697,371
Total Cost
$2,121,719
FY
2016
County
HOUSTON
Status
C
Scope
FM
Project #
100063627 NH-HSIP 0052 ()
Project Description
RESURFACING AND 2' SAFETY WIDENING OF SR-52 FROM EAST OF CR-55 TO GEORGIA STATE LINE
URBAN AREA
Sponsor(s)
Federal Share
$2,363,441
Total Cost
$2,957,732
FY
2016
County
HOUSTON
Status
C
Scope
FM
Project #
100065745 NH 0001 ()
Project Description
RESURFACING OF SR-1 (US-231) FROM FLORIDA STATE LINE TO JUST NORTH OF CR-93
URBAN AREA
DOTHAN
Sponsor(s)
  • ALDOT
Federal Share
$3,017,502
Total Cost
$5,202,604
FY
2016
County
JEFFERSON
Status
C
Scope
FM
Project #
100063570 STPAA 0005 ()
Project Description
PLANING, RESURFACING, LOOP DETECTORS, GUARDRAIL END ANCHOR AND INLET REPLACEMENT, ADA CURB RAMPS AND PERMANENT TRAFFIC STRIPE ALONG SR-5 (US-78) ARKADELPHIA ROAD FROM SR-7 (US-11) TO I-59.
URBAN AREA
BIRMINGHAM
Sponsor(s)
  • TBD
Federal Share
$837,383
Total Cost
$1,048,724
FY
2016
County
JEFFERSON
Status
C
Scope
FM
Project #
100063573 NH 0150 ()
Project Description
PLANING, RESURFACING, LOOP DETECTORS, PERMANENT TRAFFIC STRIPE AND GUARDRAIL END ANCHORS ALONG SR-150 FROM I-459 TO SR-3 (US-31) MP 8.828 TO MP 11.801 JEFFERSON COUNTY
URBAN AREA
BIRMINGHAM
Sponsor(s)
  • TBD
Federal Share
$1,627,337
Total Cost
$2,037,807
FY
2016
County
LAMAR
Status
A
Scope
FM
Project #
100064500 STPAA-HSIP 0018 ()
Project Description
RESURFACING AND 2FT SAFETY WIDENING ON SR-18 FROM SR-17 AT MP 9.849 TO CR-49 AT MP 16.304
URBAN AREA
Sponsor(s)
Federal Share
$2,413,255
Total Cost
$3,016,569
FY
2016
County
LAUDERDALE
Status
C
Scope
FM
Project #
100064633 NH 0020 ()
Project Description
MAINTENANCE RESURFACING ON SR-20 FROM SR-133 (MP. 17.16) TO SR-2 (US-43) (MP. 22.05).
URBAN AREA
SHOALS
Sponsor(s)
  • ALDOT
Federal Share
$1,404,594
Total Cost
$1,756,187
FY
2016
County
LAUDERDALE
Status
C
Scope
FM
Project #
100065449 NH 0020 ()
Project Description
MAINTENANCE RESURFACING ON SR-20 FROM JUST EAST OF CR-222 (MP 13.020) TO JUST EAST OF SR-133 (MP 17.160)
URBAN AREA
SHOALS
Sponsor(s)
  • ALDOT
Federal Share
$1,277,315
Total Cost
$1,596,953
FY
2016
County
LAUDERDALE
Status
C
Scope
FM
Project #
100065751 NH 0157 ()
Project Description
RESURFACE SR-157 FROM MP 71.097 AT THE NORTH ENDS OF THE SINGING RIVER BRIDGES TO MP 71.593 AT HUNTSVILLE ROAD
URBAN AREA
SHOALS
Sponsor(s)
  • ALDOT
Federal Share
$45,573
Total Cost
$56,966
FY
2016
County
LAUDERDALE
Status
C
Scope
FM
Project #
100065751 NH 0157 ()
Project Description
RESURFACE SR-157 FROM MP 71.097 AT THE NORTH ENDS OF THE SINGING RIVER BRIDGES TO MP 71.593 AT HUNTSVILLE ROAD
URBAN AREA
SHOALS
Sponsor(s)
  • ALDOT
Federal Share
$488,256
Total Cost
$610,909
FY
2016
County
LAWRENCE
Status
C
Scope
FM
Project #
100064634 NH 0020 ()
Project Description
MAINTENANCE RESURFACING ON SR-20 FROM STA.20+00 ( MP. 40.530) AT THE COLBERT/LAWRENCE CO. LINE TO STA. 292+31 (MP. 45.700) IN TOWN CREEK
URBAN AREA
Sponsor(s)
Federal Share
$1,495,998
Total Cost
$1,872,196
FY
2016
County
LEE
Status
A
Scope
FM
Project #
100063148 STPAA-HSIP 0051 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-51 FROM THE RUSSELL COUNTY LINE(MP 98.120) TO THE OPELIKA CITY LIMITS (MP 111.980)
URBAN AREA
AUBURN-OPELIKA
Sponsor(s)
  • TBD
Federal Share
$3,731,005
Total Cost
$4,663,756
FY
2016
County
LEE
Status
A
Scope
FM
Project #
100065756 STPAA 0169 ()
Project Description
RESURFACE SR-169 FROM MEADOWS MILL ROAD (MP 16) TO THE JCT OF SR-51 (MP 26)
URBAN AREA
AUBURN-OPELIKA
Sponsor(s)
Federal Share
$1,280,122
Total Cost
$1,600,152
FY
2016
County
LIMESTONE
Status
A
Scope
FM
Project #
100064620 NH 0002 ()
Project Description
MAINTENANCE RESURFACING ON SR-2 (US-72) FROM NEAR JEFFERSON STREET (MP. 74.60) TO NEAR MCCULLEY MILL ROAD (MP. 81.4)
URBAN AREA
HUNTSVILLE
Sponsor(s)
  • TBD
Federal Share
$738,228
Total Cost
$922,784
FY
2016
County
LIMESTONE
Status
A
Scope
FM
Project #
100064620 NH 0002 ()
Project Description
MAINTENANCE RESURFACING ON SR-2 (US-72) FROM NEAR JEFFERSON STREET (MP. 74.60) TO NEAR MCCULLEY MILL ROAD (MP. 81.4)
URBAN AREA
HUNTSVILLE
Sponsor(s)
  • TBD
Federal Share
$4,074,378
Total Cost
$5,092,973
FY
2016
County
LOWNDES
Status
C
Scope
FM
Project #
100060033 STPAA-HSIP 0097 ()
Project Description
SR-97 FROM JUST NORTH OF I-65 DENIED ACCESS LIMITS TO NORTH OF THE JUNCTION OF SR-21, PLANING, RESURFACING AND WIDENING
URBAN AREA
Sponsor(s)
Federal Share
$3,007,577
Total Cost
$3,759,493
FY
2016
County
MACON
Status
C
Scope
FM
Project #
100062484 STPAA-HSIP 0008 ()
Project Description
PLANING, RESURFACING, 2' WIDENING, AND GUARDRAIL RETROFIT ON SR-8 (US-80) FROM THE JCT OF CR-40 TO THE BEGINNING OF DIVIDED 4 LANE
URBAN AREA
Sponsor(s)
Federal Share
$1,625,592
Total Cost
$2,032,783
FY
2016
County
MACON
Status
A
Scope
FM
Project #
100065135 STPAA-HSIP 0081 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-81 FROM THE JUNCTION OF SR-8 (US-80) TO THE JUNCTION OF SR-14
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$3,299,336
Total Cost
$4,124,170
FY
2016
County
MADISON
Status
C
Scope
FM
Project #
100062713 NH-HSIP 0001 ()
Project Description
RESURFACE AND 2 FT SAFETY WIDENING ON SR-1(US-431) FROM JUST SOUTH OF OLD HWY 431 TO JUST SOUTH OF VICTORIAN LANE
URBAN AREA
HUNTSVILLE
Sponsor(s)
  • ALDOT
Federal Share
$1,422,994
Total Cost
$1,781,346
FY
2016
County
MADISON
Status
C
Scope
FM
Project #
100062732 NH 0001 ()
Project Description
RESURFACE SR-1 (US-431) FROM MADISON / MARSHALL COUNTY LINE TO OLD HWY 431
URBAN AREA
HUNTSVILLE
Sponsor(s)
  • ALDOT
Federal Share
$1,634,074
Total Cost
$2,045,598
FY
2016
County
MARENGO
Status
C
Scope
FM
Project #
100062436 NH-HSIP 0008 ()
Project Description
2 FT. SAFETY WIDENING (2-LANE), AND RESURFACING ON SR-8 (US-80) FROM HALE CL TO PERRY CL.
URBAN AREA
Sponsor(s)
Federal Share
$1,534,252
Total Cost
$1,922,662
FY
2016
County
MARENGO
Status
C
Scope
FM
Project #
100064452 NH 0013 ()
Project Description
RESURFACING SR-13 (US-43) FROM 0.03 MILE NORTH OF SR-69 S. TO 0.34 MILE NORTH OF SR-28
URBAN AREA
Sponsor(s)
Federal Share
$441,315
Total Cost
$552,297
FY
2016
County
MARENGO
Status
C
Scope
FM
Project #
100064453 STPAA 0028 ()
Project Description
RESURFACING ON SR-28 FROM SR-13(US-43) TO WEST OF LAWRENCE STREET
URBAN AREA
Sponsor(s)
Federal Share
$97,383
Total Cost
$121,728
FY
2016
County
MARENGO
Status
C
Scope
FM
Project #
100064454 NH-HSIP 0013 ()
Project Description
2 FT. SAFETY WIDENING AND RESURFACING ON SR-13(US-43)FROM 0.78 MILE NORTH OF SR-10 TO SOUTH OF CR-30
URBAN AREA
Sponsor(s)
Federal Share
$546,026
Total Cost
$683,519
FY
2016
County
MARENGO
Status
C
Scope
FM
Project #
100064457 STPAA-HSIP 0069 ()
Project Description
2 FT SAFETY WIDENING AND RESURFACING ON SR-69 FROM THE CLARKE CO LINE TO NORTH END OF HORSE CREEK BR
URBAN AREA
Sponsor(s)
Federal Share
$591,655
Total Cost
$739,550
FY
2016
County
MARENGO
Status
C
Scope
FM
Project #
100065249 STPAA 0028 ()
Project Description
RESURFACING ON SR-28 FROM THE WEST EDGE OF LAWRENCE STREET TO WEST OF AIRPORT ROAD
URBAN AREA
Sponsor(s)
Federal Share
$891,364
Total Cost
$1,114,388
FY
2016
County
MARION
Status
C
Scope
FM
Project #
100063158 STPAA 0118 ()
Project Description
RESURFACE SR-118 FROM MP 24.410 NEAR CR-69 TO MP 29.940 NEAR CR-60
URBAN AREA
Sponsor(s)
Federal Share
$2,860,698
Total Cost
$3,577,813
FY
2016
County
MARION
Status
C
Scope
FM
Project #
100064496 STPAA 0253 ()
Project Description
RESURFACING ON SR-253 FROM SR-44 AT MP 6.437 TO CR-45 AT MP 12.914
URBAN AREA
Sponsor(s)
Federal Share
$2,255,224
Total Cost
$2,819,988
FY
2016
County
MARION
Status
C
Scope
FM
Project #
100064498 NH 0074 ()
Project Description
RESURFACING ON SR-74 (US-278) FROM NEAR RAGSDALE AVENUE AT MP 5.415 TO ROLLINS ROAD AT MP 5.749 AND FROM INDUSTRIAL DRIVE AT MP 7.099 TO WEST OF CR-57 AT MP 11.154
URBAN AREA
Sponsor(s)
Federal Share
$1,154,532
Total Cost
$1,444,279
FY
2016
County
MARSHALL
Status
C
Scope
FM
Project #
100062716 NH 0001 ()
Project Description
RESURFACE SR-1(US-431) FROM SR-79 TO THE SOUTH END OF THE TENNESSEE RIVER BRIDGES
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$1,507,660
Total Cost
$1,885,617
FY
2016
County
MOBILE
Status
C
Scope
FM
Project #
100063035 NH 0016 ()
Project Description
RESURFACING ON SR-16 (US-90) FROM WEST OF PINEHILL DRIVE MP 25.250 TO SR-163 MP 25.940
URBAN AREA
MOBILE
Sponsor(s)
  • ALDOT
Federal Share
$90,859
Total Cost
$113,573
FY
2016
County
MOBILE
Status
C
Scope
FM
Project #
100063035 NH 0016 ()
Project Description
RESURFACING ON SR-16 (US-90) FROM WEST OF PINEHILL DRIVE MP 25.250 TO SR-163 MP 25.940
URBAN AREA
MOBILE
Sponsor(s)
  • ALDOT
Federal Share
$341,543
Total Cost
$427,550
FY
2016
County
MOBILE
Status
A
Scope
FM
Project #
100064391 NH 0013 ()
Project Description
RESURFACING ON SR-13 (US-43) FROM PAVEMENT JOINT JUST SOUTH OF SR-16 (US-90) TO PAVEMENT JOINT JUST NORTH OF SR-158
URBAN AREA
MOBILE
Sponsor(s)
  • ALDOT
Federal Share
$1,776,000
Total Cost
$2,223,414
FY
2016
County
MOBILE
Status
C
Scope
FM
Project #
100064416 STPAA 0016 ()
Project Description
RESURFACING ON SR-16 (US-90) FROM AL/MS STATE LINE TO PAVEMENT JOINT JUST EAST OF RAMSEY ROAD
URBAN AREA
MOBILE
Sponsor(s)
  • ALDOT
Federal Share
$1,191,058
Total Cost
$1,490,418
FY
2016
County
MONROE
Status
C
Scope
FM
Project #
100064450 STPAA 0041 ()
Project Description
RESURFACING SR-41 FROM SOUTH OF SR-21 TO THE MONROEVILLE SQUARE
URBAN AREA
Sponsor(s)
Federal Share
$859,513
Total Cost
$1,074,661
FY
2016
County
MONROE
Status
C
Scope
FM
Project #
100064451 STPAA-HSIP 0041 ()
Project Description
2' SAFETY WIDENING AND RESURFACING SR-41 FROM 0.130 MI SOUTH CR-230 TO 0.160 MI SOUTH OF CR-17
URBAN AREA
Sponsor(s)
Federal Share
$543,432
Total Cost
$679,302
FY
2016
County
MONTGOMERY
Status
A
Scope
FM
Project #
100061514 STPAA-HSIP 0126 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING SR-126 FROM THE JCT OF ATLANTA HIGHWAY TO THE JCT OF CHANTILLY PARKWAY. EXCLUDING THE MONTGOMERY OUTER LOOP BASE AND PAVE PROJECT LIMITS
URBAN AREA
MONTGOMERY
Sponsor(s)
  • ALDOT
Federal Share
$1,503,367
Total Cost
$1,879,209
FY
2016
County
MONTGOMERY
Status
A
Scope
FM
Project #
100061515 STPAA-HSIP 0293 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING SR-293 FROM SR-110 TO SR-126
URBAN AREA
MONTGOMERY
Sponsor(s)
  • ALDOT
Federal Share
$409,184
Total Cost
$511,479
FY
2016
County
MONTGOMERY
Status
A
Scope
FM
Project #
100063480 STPAA-HSIP 0094 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-94 FROM THE EAST TOWN LIMITS OF RAMER TO THE JCT. OF SR-53 (US-231)
URBAN AREA
Sponsor(s)
Federal Share
$3,072,903
Total Cost
$3,841,129
FY
2016
County
MORGAN
Status
C
Scope
FM
Project #
100064627 NH 0053 ()
Project Description
MAINTENANCE RESURFACING ON SR-53 ( US-231 ) FROM STA. 20+00 (MP. 301.030) NORTH OF KENNAMER DR. TO STA. 302+81 ( MP. 306.530 ) AT THE SOUTH END OF THE TENNESSEE RIVER BRIDGES
URBAN AREA
Sponsor(s)
Federal Share
$3,114,714
Total Cost
$3,894,076
FY
2016
County
PERRY
Status
A
Scope
FM
Project #
100064306 NH-HSIP 0005 ()
Project Description
RESURFACING AND 2 FT SAFETY WIDENING SR-5 FROM N. OF SR-183 (MP 58.787) TO S. OF SR-14 (MP 63.062) AND SR-183 FROM SR-5 (MP 20.268) TO SR-14 (MP 21.273)
URBAN AREA
Sponsor(s)
Federal Share
$1,914,656
Total Cost
$2,393,320
FY
2016
County
PERRY
Status
A
Scope
FM
Project #
100064307 NH 0008 ()
Project Description
RESURFACING (SITE 1) SR-8 (US-80) FROM WEST OF WASHINGTON STREET (MP 54.165) TO EAST OF VILLAGE AVENUE (MP 55.676) (SITE 2) SR-61 FROM SR-8 (US-80) TO HALE COUNTY LINE (MP 2.464)
URBAN AREA
Sponsor(s)
Federal Share
$1,876,000
Total Cost
$2,345,000
FY
2016
County
PIKE
Status
C
Scope
FM
Project #
100063478 STPAA-HSIP 0010 ()
Project Description
RESURFACING AND 2' SAFETY WIDENING ON SR-10 FROM END OF CURB SECTION EAST OF BRUNDIDGE TO BARBOUR COUNTY LINE
URBAN AREA
Sponsor(s)
Federal Share
$1,094,464
Total Cost
$1,369,990
FY
2016
County
RANDOLPH
Status
C
Scope
FM
Project #
100064579 STPAA-HSIP 0022 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-22 FROM MP 153.109 TO MP 157.853
URBAN AREA
Sponsor(s)
Federal Share
$1,352,636
Total Cost
$1,690,805
FY
2016
County
RUSSELL
Status
A
Scope
FM
Project #
100064755 STPAA-HSIP 0169 ()
Project Description
RESURFACE AND 1' SAFETY WIDENING SR-169 FROM THE JCT OF SR-1 (US-431) TO THE JCT OF SR-8 (US-80)
URBAN AREA
PHENIX CITY
Sponsor(s)
  • TBD
Federal Share
$1,731,297
Total Cost
$2,164,121
FY
2016
County
SHELBY
Status
A
Scope
FM
Project #
100060391 STPAA-HSIP 0155 ()
Project Description
PLANING, RESURFACING AND SAFETY WIDENING ALONG SR-155 FROM 780' NORTH OF SR-25 TO SR-119 IN MONTEVALLO
URBAN AREA
BIRMINGHAM
Sponsor(s)
  • ALDOT
Federal Share
$239,963
Total Cost
$299,953
FY
2016
County
SHELBY
Status
A
Scope
FM
Project #
100062328 NH 0003 ()
Project Description
PLANING, RESURFACING, LOOP DETECTORS, GUARDRAIL END ANCHORS, BRIDGE RETROFIT AND PERMANENT TRAFFIC STRIPE ALONG SR-3 (US-31) FROM BISHOP CREEK BRIDGE (BIN 002092) MP 260.241 TO THE SHELBY/ JEFFERSON COUNTY LINE MP 262.900 SHELBY COUNTY
URBAN AREA
BIRMINGHAM
Sponsor(s)
  • TBD
Federal Share
$2,304,129
Total Cost
$2,880,161
FY
2016
County
SHELBY
Status
C
Scope
FM
Project #
100063569 STPAA 0145 ()
Project Description
PLANING, RESURFACING, GUARDRAIL END ANCHORS AND PERMANENT TRAFFIC STRIPE ALONG SR-145 FROM THE CHILTON/SHELBY COUNTY LINE TO THE END OF SR-145
URBAN AREA
BIRMINGHAM
Sponsor(s)
  • TBD
Federal Share
$3,648,356
Total Cost
$4,566,387
FY
2016
County
ST. CLAIR
Status
C
Scope
FM
Project #
100062720 STPAA-HSIP 0007 ()
Project Description
RESURFACE AND 2 FT SAFETY WIDENING ON SR-7(US-11) FROM SR-53(US-231) TO THE SOUTH STEELE TOWN LIMIT
URBAN AREA
Sponsor(s)
Federal Share
$900,389
Total Cost
$1,127,653
FY
2016
County
ST. CLAIR
Status
C
Scope
FM
Project #
100062723 STPOA 0004 ()
Project Description
PLANING, RESURFACING AND PERMANENT TRAFFIC STRIPE ALONG SR-4 (US-78) FROM I-20 TO SR-53(US-231) IN PELL CITY. (EXCEPTION FOR WOLF CREEK BRIDGE - MP. 130.66 TO MP. 130.94)
URBAN AREA
Sponsor(s)
Federal Share
$779,632
Total Cost
$975,472
FY
2016
County
ST. CLAIR
Status
C
Scope
FM
Project #
100062737 STPAA-HSIP 0174 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-174 FROM SR-25(US-411) SOUTH OF ODENVILLE TO SR-53(US-231) NORTH OF PELL CITY
URBAN AREA
BIRMINGHAM
Sponsor(s)
  • ALDOT
Federal Share
$1,384,126
Total Cost
$1,731,207
FY
2016
County
SUMTER
Status
A
Scope
FM
Project #
100053533 STPAA-HSIP 0039 ()
Project Description
RESURFACING OF SR-39 WITH 2' SAFETY WIDENING FROM THE NORTH END OF FACTORY CREEK BRIDGE AT MP 5.603 TO THE TOMBIGBEE RIVER BRIDGE AT MP 11.161
URBAN AREA
Sponsor(s)
Federal Share
$1,688,266
Total Cost
$2,110,332
FY
2016
County
TALLADEGA
Status
A
Scope
FM
Project #
100064581 STPAA 0076 ()
Project Description
RESURFACE SR-76 FROM SR-38 (US-231) MP 6.653 TO MP 11.630
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$1,376,581
Total Cost
$1,720,727
FY
2016
County
TALLAPOOSA
Status
C
Scope
FM
Project #
100064582 STPAA-HSIP 0014 ()
Project Description
RESURFACING AND 2' SAFETY WIDENING ON SR-14 FROM BEGINNING OF 2 LANE SECTION MP 196.177 TO MP 198.849
URBAN AREA
Sponsor(s)
Federal Share
$1,278,909
Total Cost
$1,598,636
FY
2016
County
TALLAPOOSA
Status
C
Scope
FM
Project #
100064583 STPAA-HSIP 0049 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-49 FROM JCT OF SR-14 MP 8.990 TO MP 14.354 (SOUGAHATCHEE CREEK)
URBAN AREA
Sponsor(s)
Federal Share
$2,050,836
Total Cost
$2,563,547
FY
2016
County
TUSCALOOSA
Status
C
Scope
FM
Project #
100064399 NH 0013 ()
Project Description
RESURFACING SR-13 (US-43) FROM SR-6 (US-82) IN NORTHPORT TO MP 202.010
URBAN AREA
TUSCALOOSA
Sponsor(s)
  • ALDOT
Federal Share
$1,472,497
Total Cost
$1,840,833
FY
2016
County
TUSCALOOSA
Status
A
Scope
FM
Project #
100065213 STPOA 0216 ()
Project Description
RESURFACING SR-216 FROM JUST EAST OF BOOLER ROAD TO JUST WEST OF I-20/59
URBAN AREA
TUSCALOOSA
Sponsor(s)
  • ALDOT
Federal Share
$2,616,000
Total Cost
$3,270,000
FY
2016
County
TUSCALOOSA
Status
A
Scope
FM
Project #
100065214 STPAA-HSIP 0216 ()
Project Description
RESURFACING AND 2 FT SAFETY WIDENING ON SR-216 FROM JUST EAST OF LOCK 17 RD TO CR-9
URBAN AREA
TUSCALOOSA
Sponsor(s)
  • ALDOT
Federal Share
$2,139,409
Total Cost
$2,674,262
FY
2016
County
WALKER
Status
C
Scope
FM
Project #
100064494 STPAA 0269 ()
Project Description
RESURFACING OF SR-269 FROM JEFFERSON COUNTY LINE AT MP 21.740 TO NORTH OF CR-22 AT MP 32.120
URBAN AREA
Sponsor(s)
Federal Share
$3,212,064
Total Cost
$4,016,351
FY
2016
County
WALKER
Status
C
Scope
FM
Project #
100064497 STPOA 0005 ()
Project Description
PLANING, RESURFACING, CROSS SLOPE AND SUPERELEVATION CORRECTION, BRIDGE RAIL RETROFIT ON SR-5 FROM SR-69 OVERPASS AT MP 172.196 TO BUCK CREEK BRIDGE AT MP 181.400
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$2,454,564
Total Cost
$3,070,549
FY
2016
County
WASHINGTON
Status
C
Scope
FM
Project #
100062498 STPAA-HSIP 0056 ()
Project Description
2' SAFETY WIDENING (PARTIAL) AND RESURFACING ON SR-56 FROM EAST OF CR-1 TO WEST OF SR-13 (US-43) INTERSECTION, MP. 12.948 TO MP. 27.661
URBAN AREA
Sponsor(s)
Federal Share
$2,875,788
Total Cost
$3,596,649
FY
2016
County
WASHINGTON
Status
C
Scope
FM
Project #
100065124 NH 0013 ()
Project Description
RESURFACING SR-13 (US-43), FROM NORTH OF MCINTOSH TO 0.333 MILE NORTH OF LEWIS CREEK BRIDGE
URBAN AREA
Sponsor(s)
Federal Share
$1,080,982
Total Cost
$1,351,651
FY
2016
County
WILCOX
Status
C
Scope
FM
Project #
100064458 STPAA 0028 ()
Project Description
RESURFACING SR-28 FROM SR-10 TO WEST OF SR-21
URBAN AREA
Sponsor(s)
Federal Share
$1,997,099
Total Cost
$2,496,938
FY
2016
County
WILCOX
Status
C
Scope
FM
Project #
100064459 STPAA-HSIP 0221 ()
Project Description
2' SAFETY WIDENING AND RESURFACING SR-221 FROM SR-10 TO SR-28
URBAN AREA
Sponsor(s)
Federal Share
$709,552
Total Cost
$886,983
FY
2016
County
WILCOX
Status
C
Scope
FM
Project #
100064460 NH-HSIP 0005 ()
Project Description
2' SAFETY WIDENING AND RESURFACING ON SR - 5,FROM MOCCASIN CREEK TO 0.32 MILES NORTH OF SR-10
URBAN AREA
Sponsor(s)
Federal Share
$776,236
Total Cost
$971,409

LVOE ID
Budgeted
Planned
Obligated
Remaining Amt.
FY
2017
County
STATEWIDE
Status
P
Scope
SP
Project #
100056582 SAFETY LVOE ()
Project Description
LEVEL OF EFFORT SAFETY PROGRAM FY-2017
URBAN AREA
Sponsor(s)
LVOE Budget
$34,315,000
FY
2017
County
AREAWIDE
Status
A
Scope
SP
Project #
100066371 HSIP NR17 ()
Project Description
HORIZONTAL CURVE ROADWAY SIGNING IMPROVEMENT PROGRAM FISCAL YEAR 2017/2018 (EAST CENTRAL REGION - ALEX CITY AREA)
URBAN AREA
Sponsor(s)
Federal Share
$2,068
Total Cost
$2,298
FY
2017
County
AREAWIDE
Status
A
Scope
SP
Project #
100066372 HSIP NR17 ()
Project Description
HORIZONTAL CURVE ROADWAY SIGNING IMPROVEMENT PROGRAM FISCAL YEAR 2017/2018 (EAST CENTRAL REGION - BIRMINGHAM AREA)
URBAN AREA
Sponsor(s)
Federal Share
$8,272
Total Cost
$9,191
FY
2017
County
AREAWIDE
Status
C
Scope
SP
Project #
100066373 HSIP NR17 ()
Project Description
HORIZONTAL CURVE ROADWAY SIGNING IMPROVEMENT PROGRAM FISCAL YEAR 2017/2018 (NORTH REGION - GUNTERSVILLE AREA)
URBAN AREA
Sponsor(s)
Federal Share
$60,758
Total Cost
$68,178
FY
2017
County
AREAWIDE
Status
C
Scope
PE
Project #
100066374 HSIP NR17 ()
Project Description
HORIZONTAL CURVE ROADWAY SIGNING IMPROVEMENT PROGRAM (NORTH REGION - TUSCUMBIA AREA)
URBAN AREA
Sponsor(s)
Federal Share
$48,275
Total Cost
$53,679
FY
2017
County
AREAWIDE
Status
A
Scope
SP
Project #
100066375 HSIP NR17 ()
Project Description
HORIZONTAL CURVE ROADWAY SIGNING IMPROVEMENT PROGRAM FISCAL YEAR 2017/2018 (SOUTHEAST REGION - MONTGOMERY AREA)
URBAN AREA
Sponsor(s)
Federal Share
$9,731
Total Cost
$10,812
FY
2017
County
AREAWIDE
Status
A
Scope
SP
Project #
100066376 HSIP NR17 ()
Project Description
HORIZONTAL CURVE ROADWAY SIGNING IMPROVEMENT PROGRAM FY 2017/2018 (SOUTHEAST REGION - TROY AREA)
URBAN AREA
Sponsor(s)
Federal Share
$6,625
Total Cost
$7,361
FY
2017
County
AREAWIDE
Status
A
Scope
SP
Project #
100066377 HSIP NR17 ()
Project Description
HORIZONTAL CURVE ROADWAY SIGNING IMPROVEMENT PROGRAM FY 2017/2018 (SOUTHWEST REGION - GROVE HILL AREA)
URBAN AREA
Sponsor(s)
Federal Share
$21,006
Total Cost
$23,340
FY
2017
County
AREAWIDE
Status
A
Scope
SP
Project #
100066378 HSIP NR17 ()
Project Description
HORIZONTAL CURVE ROADWAY SIGNING IMPROVEMENT PROGRAM FY 2017/2018 (SOUTHWEST REGION - MOBILE AREA)
URBAN AREA
Sponsor(s)
Federal Share
$64,910
Total Cost
$72,122
FY
2017
County
AREAWIDE
Status
A
Scope
SP
Project #
100066379 HSIP NR17 ()
Project Description
HORIZONTAL CURVE ROADWAY SIGNING IMPROVEMENT PROGRAM FY 2017/2018 (WEST CENTRAL REGION - FAYETTE AREA)
URBAN AREA
Sponsor(s)
Federal Share
$441
Total Cost
$490
FY
2017
County
AREAWIDE
Status
A
Scope
SP
Project #
100066380 HSIP NR17 ()
Project Description
HORIZONTAL CURVE ROADWAY SIGNING IMPROVEMENT PROGRAM FY 2017/2018 (WEST CENTRAL REGION - TUSCALOOSA AREA)
URBAN AREA
Sponsor(s)
Federal Share
$9,686
Total Cost
$10,762
FY
2017
County
AUTAUGA
Status
A
Scope
FM
Project #
100065778 STPAA-HSIP 0014 ()
Project Description
RESURFACE AND 2' SAFTEY WIDENING ON SR-14 FROM THE JUNCTION OF CR-21 TO SR-6 (US-82)
URBAN AREA
MONTGOMERY
Sponsor(s)
  • TBD
Federal Share
$560,779
Total Cost
$623,088
FY
2017
County
AUTAUGA
Status
A
Scope
FM
Project #
100065785 NH-HSIP 0006 ()
Project Description
RESURFACE, 2' SAFTEY WIDENING AND BRIDGE RAIL RETROFIT ON SR-6 (US-82) FROM JUST EAST OF SR-14 TO JUST WEST OF SR-3 (US-31)
URBAN AREA
MONTGOMERY
Sponsor(s)
  • TBD
Federal Share
$157,930
Total Cost
$175,478
FY
2017
County
BALDWIN
Status
A
Scope
PE
Project #
100057690 STPSA-HSIP I065 ()
Project Description
I-65 INSTALL INTERSTATE MEDIAN CABLE BARRIER FROM SR-59 MP 33.7 TO RAILROAD BRIDGE MP 75.5
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$27,000
Total Cost
$30,000
FY
2017
County
BALDWIN
Status
A
Scope
PE
Project #
100057693 HSIP I010 ()
Project Description
INSTALL INTERSTATE MEDIAN CABLE BARRIER ON I-10 FROM SR-181 TO PERDIDO RIVER BRIDGE
URBAN AREA
EASTERN SHORE
Sponsor(s)
  • TBD
Federal Share
$4,050
Total Cost
$4,500
FY
2017
County
BARBOUR
Status
C
Scope
FM
Project #
100065938 STPAA-HSIP 0131 ()
Project Description
RESURFACING AND 2' SAFETY WIDENING OF SR-131 FROM SR-10 TO SOUTH OF CR-53 AT TEXASVILLE
URBAN AREA
Sponsor(s)
Federal Share
$401,901
Total Cost
$446,554
FY
2017
County
BIBB
Status
A
Scope
UT
Project #
100062170 HSIPF 0005 ()
Project Description
ROUNDABOUT CONSTRUCTION AT SR-5 AND CR-58 INTERSECTION
URBAN AREA
Sponsor(s)
Federal Share
$266,187
Total Cost
$266,187
FY
2017
County
BLOUNT
Status
A
Scope
PE
Project #
100066786 HSIP 0160 ()
Project Description
INTERSECTION IMPROVEMENTS ON SR-160 AT THE I-65 INTERCHANGE RAMP AND AT SR-3 (US-31)
URBAN AREA
BIRMINGHAM
Sponsor(s)
  • ALDOT
Federal Share
$450,000
Total Cost
$500,000
FY
2017
County
BULLOCK
Status
A
Scope
FM
Project #
100065786 STPAA-HSIP 0051 ()
Project Description
RESURFACE AND 2' SAFTEY WIDENING ON SR-51 FROM THE BARBOUR COUNTY LINE TO SR-6 (US-82)
URBAN AREA
Sponsor(s)
Federal Share
$378,536
Total Cost
$420,596
FY
2017
County
BUTLER
Status
A
Scope
CN
Project #
100057721 HSIP I065 ()
Project Description
GUIDE RAIL INSTALLATION ON I-65 FROM THE CONECUH CL TO 0.5 MILE NORTH OF CR-28
URBAN AREA
Sponsor(s)
Federal Share
$322,282
Total Cost
$358,091
FY
2017
County
BUTLER
Status
A
Scope
FM
Project #
100065788 STPAA-HSIP 0245 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-245 FROM SR-10 TO SR-185 AND RESURFACE SR-10 FROM JUST WEST OF SOUTH COLLEGE STREET TO BOLLING STREET
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$217,966
Total Cost
$242,185
FY
2017
County
CHAMBERS
Status
A
Scope
FM
Project #
100065901 STPAA-HSIP 0015 ()
Project Description
RESURFACE, STRIPE AND 2' SAFETY WIDENING SR-15 (US-29) FROM LEE COUNTY LINE (MP 201.246) TO SOUTH OF JUDGE BROWN ROAD (MP 204.558)
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$156,130
Total Cost
$173,477
FY
2017
County
CHILTON
Status
A
Scope
FM
Project #
100065808 STPAA-HSIP 0003 ()
Project Description
RESURFACING AND 2 FEET SAFETY WIDENING SR-3 (US-31) FROM JEMISON NORTH CITY LIMITS TO THE SHELBY COUNTY LINE
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$225,927
Total Cost
$251,030
FY
2017
County
CLAY
Status
C
Scope
FM
Project #
100065895 STPAA-HSIP 0009 ()
Project Description
RESURFACE, STRIPE, AND 2' SAFETY WIDENING SR-9 FROM MAD INDIAN CREEK BRIDGE MP. 193.927 TO THE CLEBURNE COUNTY LINE MP. 203.168
URBAN AREA
Sponsor(s)
Federal Share
$480,620
Total Cost
$534,023
FY
2017
County
COFFEE
Status
A
Scope
FM
Project #
100066117 STPAA-HSIP 0134 ()
Project Description
RESURFACING AND 2' SAFETY WIDENING ON SR-134 FROM OPP BYPASS SR-9 (US-331) IN COVINGTON COUNTY TO SR-87 IN COFFEE COUNTY.
URBAN AREA
Sponsor(s)
Federal Share
$1,209,750
Total Cost
$1,344,167
FY
2017
County
CONECUH
Status
A
Scope
PE
Project #
100057681 HSIP I065 ()
Project Description
INSTALL INTERSTATE MEDIAN CABLE BARRIER FROM MP 75.5 TO MP 105.5 IN CONECUH COUNTY
URBAN AREA
Sponsor(s)
Federal Share
$32,400
Total Cost
$36,000
FY
2017
County
COOSA
Status
A
Scope
FM
Project #
100058934 STPAA-HSIP 0022 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-22 FROM SR-9 TO WEST OF THE TALLAPOOSA COUNTY LINE MP 109.732
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$563,008
Total Cost
$625,565
FY
2017
County
COVINGTON
Status
C
Scope
FM
Project #
100065940 NH-HSIP 0009 ()
Project Description
RESURFACING AND 2' SAFETY WIDENING ON SR-9 FROM 0.3 MILES NORTH OF RODNEY J EVANS DRIVE TO THE NORTH CITY LIMITS OF FLORALA
URBAN AREA
Sponsor(s)
Federal Share
$129,296
Total Cost
$143,662
FY
2017
County
COVINGTON
Status
A
Scope
FM
Project #
100065941 STPAA-HSIP 0055 ()
Project Description
RESURFACING AND 2' SAFETY WIDENING ON SR-55 FROM SR-15 (STANLEY AVENUE) TO THE BEGIN OF CURB AND GUTTER .37 MILES NORTH OF THE US-29/SR-55 INTERSECTION
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$169,389
Total Cost
$188,210
FY
2017
County
CULLMAN
Status
A
Scope
FM
Project #
100060506 STPAA-HSIP 0003 ()
Project Description
RESURFACE AND 2 FT SAFETY WIDENING ON SR-3 (US-31) FROM THE INTERSECTION OF 7TH STREET SW TO THE CULLMAN CITY LIMITS
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$326,341
Total Cost
$362,601
FY
2017
County
CULLMAN
Status
A
Scope
CN
Project #
100061436 HSIP 0069 ()
Project Description
ADDITION OF LEFT TURN LANE ON SR-69 AT CR-1545 (GOLD RIDGE ROAD)
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$360,133
Total Cost
$703,280
FY
2017
County
CULLMAN
Status
A
Scope
FM
Project #
100064411 NH-HSIP 0074 ()
Project Description
RESURFACE AND 2 FT SAFETY WIDENING ON SR-74 (US-278) FROM EAST OF THE SR-69 INTERSECTION TO THE END OF THE CURB AND GUTTER SECTION 0.25 MILES EAST OF CR-747 IN BERLIN
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$137,700
Total Cost
$153,000
FY
2017
County
DALLAS
Status
A
Scope
FM
Project #
100065780 STPAA-HSIP 0022 ()
Project Description
SCRUB SEAL, MICRO-SURFACING PAVEMENT AND 2' SAFTEY WIDENING ON SR-22 FROM THE JUNCTION OF CR-63 TO THE CHILTON COUNTY LINE
URBAN AREA
Sponsor(s)
Federal Share
$433,329
Total Cost
$481,476
FY
2017
County
DALLAS
Status
A
Scope
FM
Project #
100065783 STPAA-HSIP 0014 ()
Project Description
RESURFACE AND 2' SAFTEY WIDENING ON SR-14 FROM THE JUNCTION OF SR-41 TO THE JUNCTION OF CR-21
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$350,165
Total Cost
$389,072
FY
2017
County
DALLAS
Status
A
Scope
PE
Project #
100066744 HSIP 0008 ()
Project Description
TRAFFIC SIGNAL SAFETY IMPROVEMENTS ON SR-8 FROM SR-219 (LANDLINE ROAD) TO SR-41 (TEN INTERSECTIONS) IN SELMA
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$90,000
Total Cost
$100,000
FY
2017
County
DEKALB
Status
C
Scope
CN
Project #
100058015 HSIP I059 ()
Project Description
INSTALL INTERSTATE MEDIAN SAFETY GUIDERAIL ON I-59 FROM SR-117 AT MP 231.40 TO THE GEORGIA STATE LINE AT MP 241.20
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$909,701
Total Cost
$1,010,971
FY
2017
County
DEKALB
Status
A
Scope
CN
Project #
100059869 HSIP I059 ()
Project Description
INSTALL INTERSTATE MEDIAN SAFETY GUIDERAIL AND REMOVE GUARDRAIL ON I-59 FROM 1 MILE SOUTH OF SR-211 (MP 187.00) TO SR-35 IN FORT PAYNE (MP 218.745)
URBAN AREA
GADSDEN
Sponsor(s)
  • ALDOT
Federal Share
$996,513
Total Cost
$1,107,237
FY
2017
County
DEKALB
Status
A
Scope
CN
Project #
100062606 HSIP I059 ()
Project Description
INSTALL INTERSTATE MEDIAN SAFETY GUIDERAIL AND REMOVE GUARDRAIL ON I-59 FROM SR-35 IN FORT PAYNE AT MP 218.745 TO SR-117 AT MP 231.400
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$1,507,724
Total Cost
$1,675,249
FY
2017
County
DEKALB
Status
A
Scope
PE
Project #
100065374 HSIP 0035 ()
Project Description
CORRIDOR STUDY SR-35 FROM JUST EAST OF I-59 (M.P. 23.924) TO BURT HILL DRIVE
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$45,450
Total Cost
$50,500
FY
2017
County
ETOWAH
Status
A
Scope
CN
Project #
100056197 IMF-HSIPF I759 ()
Project Description
RESURFACING I-759 FROM THE I-59 INTERCHANGE TO THE EAST END OF THE COOSA RIVER BRIDGE, TO INCLUDE SLOPE CORRECTION, ACCEL LANE EXTENSION, DECEL LANE INSTALLATION, GUARDRAIL REPLACEMENT AND GUIDERAIL INSTALLATION
URBAN AREA
GADSDEN
Sponsor(s)
  • ALDOT
Federal Share
$598,034
Total Cost
$664,483
FY
2017
County
FAYETTE
Status
A
Scope
FM
Project #
100066067 RECA-STPAA-HSIP 0171 ()
Project Description
RESURFACE AND 2 FT SAFETY WIDENING SR-171 FROM JUST NORTH OF THE INTERSECTION WITH SR-159 AT MP 34.501 TO MP 41.59 JUST NORTH OF THE JUNCTION WITH SR-102
URBAN AREA
Sponsor(s)
Federal Share
$59,194
Total Cost
$65,771
FY
2017
County
FAYETTE
Status
A
Scope
FM
Project #
100066069 STPAA-HSIP 0018 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-18 (US-43) FROM MP 42.10 (STA 104+60.13) AT THE BERRY "Y" (INTERSECTION SR-13) TO JUST WEST OF CR-125 AT MP 49.200 (STA 475+00.00)
URBAN AREA
Sponsor(s)
Federal Share
$503,016
Total Cost
$558,906
FY
2017
County
FAYETTE
Status
A
Scope
FM
Project #
100066723 STPAA-HSIP 0018 ()
Project Description
RESURFACE AND 2-FT SAFETY WIDENING ON SR-18 FROM LAMAR COUNTY LINE AT MP 19.530 TO WEST OF SR-107 AT MP 24.046
URBAN AREA
Sponsor(s)
Federal Share
$436,355
Total Cost
$484,839
FY
2017
County
GENEVA
Status
A
Scope
FM
Project #
100065944 STPAA-HSIP 0052 ()
Project Description
RESURFACING AND 2' SAFETY WIDENING ON SR-52 FROM EAST OF CR-69 TO WEST OF NORTH REX STREET IN SLOCOMB
URBAN AREA
Sponsor(s)
Federal Share
$307,563
Total Cost
$341,736
FY
2017
County
GENEVA
Status
C
Scope
FM
Project #
100066121 STPNU-HSIP 0052 ()
Project Description
RESURFACING AND 2' SAFTEY WIDENING OF SR-52 FROM GENEVA EAST CITY LIMITS TO INTERSECTION SR-167
URBAN AREA
Sponsor(s)
Federal Share
$390,886
Total Cost
$434,320
FY
2017
County
HALE
Status
A
Scope
FM
Project #
100065807 STPAA-HSIP 0014 ()
Project Description
RESURFACE AND 2FT SAFETY WIDENING ON SR-14 FROM GREENSBORO EAST CITY LIMITS TO THE PERRY COUNTY LINE
URBAN AREA
Sponsor(s)
Federal Share
$904,251
Total Cost
$1,004,724
FY
2017
County
HENRY
Status
A
Scope
FM
Project #
100065943 STPAA-HSIP 0027 ()
Project Description
RESURFACING AND 2' SAFETY WIDENING ON SR-27 FROM THE DALE COUNTY LINE TO SR- 1 (US-431)
URBAN AREA
Sponsor(s)
Federal Share
$532,569
Total Cost
$591,743
FY
2017
County
HOUSTON
Status
A
Scope
PE
Project #
100066842 HSIP NR17 ()
Project Description
INTERSECTION IMPROVEMENTS (ROUNDABOUT) AT CAMPBELLTON HIGHWAY (CR-203) AND TAYLOR ROAD (CR-64)
URBAN AREA
DOTHAN
Sponsor(s)
  • HOUSTON COUNTY
Federal Share
$90,000
Total Cost
$100,000
FY
2017
County
JEFFERSON
Status
C
Scope
CN
Project #
100054662 SRTS SR10 ()
Project Description
SIDEWALKS AT LEEDS MIDDLE SCHOOL IN THE CITY OF LEEDS , SAFE ROUTES TO SCHOOL FY 2009
URBAN AREA
BIRMINGHAM
Sponsor(s)
  • ALDOT
Federal Share
$59,878
Total Cost
$59,878
FY
2017
County
JEFFERSON
Status
C
Scope
CN
Project #
100054662 SRTS SR10 ()
Project Description
SIDEWALKS AT LEEDS MIDDLE SCHOOL IN THE CITY OF LEEDS , SAFE ROUTES TO SCHOOL FY 2009
URBAN AREA
BIRMINGHAM
Sponsor(s)
  • ALDOT
Federal Share
$69,006
Total Cost
$69,006
FY
2017
County
JEFFERSON
Status
C
Scope
CN
Project #
100054662 SRTS SR10 ()
Project Description
SIDEWALKS AT LEEDS MIDDLE SCHOOL IN THE CITY OF LEEDS , SAFE ROUTES TO SCHOOL FY 2009
URBAN AREA
BIRMINGHAM
Sponsor(s)
  • ALDOT
Federal Share
$225
Total Cost
$225
FY
2017
County
JEFFERSON
Status
A
Scope
CN
Project #
100063235 HSIP I020 ()
Project Description
MEDIAN CROSSOVER PROTECTION, GUARDRAIL AND GUARDRAIL END ANCHORS ON I-20 FROM 0.448 M WEST OF OPORTO-MADRID BOULEVARD TO WEST OF SR-4 (US-78) MP 131.720 TO MP 139.500
URBAN AREA
BIRMINGHAM
Sponsor(s)
  • ALDOT
Federal Share
$594,481
Total Cost
$660,534
FY
2017
County
JEFFERSON
Status
A
Scope
CN
Project #
100063236 HSIP I059 ()
Project Description
I-59 INTERSTATE MEDIAN CROSSOVER PROTECTION, BRIDGE RAIL RETROFIT, GUARDRAIL AND GUARDRAIL END ANCHORS FROM SR-7 (US-11, 1ST AVENUE NORTH) TO CR-10 (CHALKVILLE MOUNTAIN ROAD)
URBAN AREA
BIRMINGHAM
Sponsor(s)
  • ALDOT
Federal Share
$1,876,332
Total Cost
$2,084,814
FY
2017
County
JEFFERSON
Status
A
Scope
CN
Project #
100063238 IM-HSIP I459 ()
Project Description
I-459 INTERSTATE MEDIAN CROSSOVER PROTECTION, GUARDRAIL AND GUARDRAIL END ANCHORS FROM CHAPEL LANE TO SR-38 (US-280)
URBAN AREA
BIRMINGHAM
Sponsor(s)
  • ALDOT
Federal Share
$203,674
Total Cost
$226,304
FY
2017
County
LAMAR
Status
A
Scope
FM
Project #
100066072 STPAA-HSIP 0018 ()
Project Description
RESURFACE AND 2'SAFETY WIDENING SR-18 FROM LAMAR CR-49 AT MP 16.304 TO THE FAYETTE COUNTY LINE AT MP 19.528
URBAN AREA
Sponsor(s)
Federal Share
$165,327
Total Cost
$183,697
FY
2017
County
LEE
Status
A
Scope
PE
Project #
100065527 HSIP I085 ()
Project Description
SAFETY IMPROVEMENTS ON I-85 AT EXIT 58 AND EXIT 60
URBAN AREA
AUBURN-OPELIKA
Sponsor(s)
  • ALDOT
Federal Share
$108,000
Total Cost
$120,000
FY
2017
County
LEE
Status
A
Scope
FM
Project #
100065777 NH-HSIP 0001 ()
Project Description
RESURFACE AND 2' SAFTEY WIDENING ON SR-1 (US-431) FROM COLUMBUS PARKWAY TO THE CHAMBERS COUNTY LINE
URBAN AREA
AUBURN-OPELIKA
Sponsor(s)
  • ALDOT
Federal Share
$432,498
Total Cost
$480,553
FY
2017
County
LEE
Status
A
Scope
FM
Project #
100065784 STPAA-HSIP 0015 ()
Project Description
RESURFACE AND 2' SAFTEY WIDENING ON SR-15 (US-29) FROM JUST WEST OF I-85 TO THE CHAMBERS COUNTY LINE
URBAN AREA
AUBURN-OPELIKA
Sponsor(s)
  • TBD
Federal Share
$353,002
Total Cost
$392,224
FY
2017
County
MADISON
Status
A
Scope
FM
Project #
100065825 STPAA-HSIP 0002 ()
Project Description
RESURFACING AND 2 FT SAFETY WIDENING ON SR-2 (US-72) FROM THE INTERSECTION OF SR-1 (US-231/431- MEMORIAL PARKWAY) TO THE INTERSECTION OF I-565
URBAN AREA
HUNTSVILLE
Sponsor(s)
  • TBD
Federal Share
$225,000
Total Cost
$250,000
FY
2017
County
MARENGO
Status
A
Scope
FM
Project #
100065250 STPAA-HSIP 0069 ()
Project Description
2 FT SAFETY WIDENING AND RESURFACING ON SR-69 FROM SR-10 TO SOUTH OF SR-114
URBAN AREA
Sponsor(s)
Federal Share
$626,711
Total Cost
$696,346
FY
2017
County
MARENGO
Status
A
Scope
FM
Project #
100065554 STPAA-HSIP 0025 ()
Project Description
2 FT SAFETY WIDENING AND RESURFACING ON SR-25 FROM 1.2 MILE NORTH OF CR-32 TO SOUTH OF THE RAIL ROAD TRACKS IN THOMASTON
URBAN AREA
Sponsor(s)
Federal Share
$717,066
Total Cost
$796,740
FY
2017
County
MOBILE
Status
A
Scope
PE
Project #
100057687 HSIP I065 ()
Project Description
INSTALL INTERSTATE MEDIAN CABLE BARRIER ON I-65 FROM MP 13.0 (SR-158) TO MP 16.9 (NORTH OF CR-41) IN MOBILE COUNTY
URBAN AREA
MOBILE
Sponsor(s)
  • ALDOT
Federal Share
$45,000
Total Cost
$50,000
FY
2017
County
MONROE
Status
C
Scope
FM
Project #
100065566 STPAA-HSIP 0021 ()
Project Description
2 FT SAFETY WIDENING AND RESURFACING SR-21 FROM 0.08 MILES SOUTH OF OVERPASS BRIDGE IN TUNNEL SPRINGS TO 0.67 MILES SOUTH OF SR-265
URBAN AREA
Sponsor(s)
Federal Share
$386,835
Total Cost
$429,934
FY
2017
County
MONROE
Status
A
Scope
FM
Project #
100065961 STPAA-HSIP 0047 ()
Project Description
2 FT SAFETY WIDENING AND RESURFACING ON SR-47 FROM 0.364 MILE NORTH OF SR-83 TO SR-10
URBAN AREA
Sponsor(s)
Federal Share
$553,119
Total Cost
$614,576
FY
2017
County
MONROE
Status
A
Scope
FM
Project #
100065967 STPAA-HSIP 0265 ()
Project Description
2 FT SAFETY WIDENING AND RESURFACING ON SR-265 FROM SR-21 TO WILCOX COUNTY LINE
URBAN AREA
Sponsor(s)
Federal Share
$428,075
Total Cost
$475,639
FY
2017
County
MONTGOMERY
Status
A
Scope
PE
Project #
100057716 HSIP I085 ()
Project Description
GUIDE RAIL ON I-85 FROM EAST OF SR-271 TO THE MACON COUNTY LINE
URBAN AREA
MONTGOMERY
Sponsor(s)
  • TBD
Federal Share
$27,919
Total Cost
$31,021
FY
2017
County
MONTGOMERY
Status
A
Scope
PE
Project #
100057716 HSIP I085 ()
Project Description
GUIDE RAIL ON I-85 FROM EAST OF SR-271 TO THE MACON COUNTY LINE
URBAN AREA
MONTGOMERY
Sponsor(s)
  • TBD
Federal Share
$45,121
Total Cost
$50,135
FY
2017
County
MONTGOMERY
Status
A
Scope
CN
Project #
100057717 HSIP I085 ()
Project Description
GUIDE RAIL ON I-85 FROM EAST OF SR-271 TO THE MACON COUNTY LINE
URBAN AREA
MONTGOMERY
Sponsor(s)
  • TBD
Federal Share
$712,036
Total Cost
$791,151
FY
2017
County
MONTGOMERY
Status
C
Scope
SP
Project #
100067349 HSIP I085 ()
Project Description
ROAD SAFETY ASSESSMENT FOR I-85 FROM MP 16.000 TO MP 26.000
URBAN AREA
MONTGOMERY
Sponsor(s)
  • TBD
Federal Share
$50,656
Total Cost
$56,284
FY
2017
County
PICKENS
Status
A
Scope
FM
Project #
100064502 STPAA-HSIP 0017 ()
Project Description
RESURFACING AND 2FT SAFETY WIDENING ON SR-17 FROM N OF MCCAA BOTTOM ROAD AT MP 185.890 TO S OF MURPHY AVENUE AT MP 190.830
URBAN AREA
Sponsor(s)
Federal Share
$237,938
Total Cost
$264,376
FY
2017
County
PICKENS
Status
C
Scope
FM
Project #
100066065 STPAA-HSIP 0159 ()
Project Description
RESURFACE SR-159 FROM MP 12.900 AT RAYMOND ROBERTSON ROAD TO FAYETTE COUNTY LINE AT MP 17.378
URBAN AREA
Sponsor(s)
Federal Share
$524,375
Total Cost
$582,639
FY
2017
County
RANDOLPH
Status
A
Scope
FM
Project #
100062400 NH-HSIP 0001 ()
Project Description
RESURFACE, STRIPE, AND 2' SAFETY WIDENING SR-1 (US-431) FROM NORTH OF WEDOWEE MP 195.573 TO CR-29 MP 203.849
URBAN AREA
Sponsor(s)
Federal Share
$558,437
Total Cost
$620,486
FY
2017
County
ST. CLAIR
Status
A
Scope
PE
Project #
100066388 STPAA-HSIP 0034 ()
Project Description
INTERSECTION IMPROVEMENTS ON SR-34 AT CROPWELL DRIVE AND HARDWICK ROAD (CR-45), INCLUDING ROUNDABOUT CONSTRUCTION IN PELL CITY
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$56,250
Total Cost
$62,500
FY
2017
County
STATEWIDE
Status
C
Scope
SP
Project #
100064722 STPAA NR16 ()
Project Description
ALDOT AND ALEA OVERTIME ENFORCEMENT EFFORTS FY 2017 AND FY 2018
URBAN AREA
Sponsor(s)
Federal Share
$640,000
Total Cost
$800,000
FY
2017
County
STATEWIDE
Status
A
Scope
SP
Project #
100065884 HSIP NR17 ()
Project Description
WRONG-WAY DRIVING CRASHES PREDICTIVE MODELS AND COUNTERMEASURES EVALUATION FY-2017 AND FY2018
URBAN AREA
Sponsor(s)
Federal Share
$68,828
Total Cost
$76,475
FY
2017
County
STATEWIDE
Status
A
Scope
SP
Project #
100066489 HSIP NR17 ()
Project Description
STATE SAFETY PERFORMANCE TARGET SETTING AND COORDINATION
URBAN AREA
Sponsor(s)
Federal Share
$91,314
Total Cost
$101,460
FY
2017
County
STATEWIDE
Status
A
Scope
SP
Project #
100066658 HSIP NR17 ()
Project Description
ALABAMA STRATEGIC HIGHWAY SAFETY PLAN, 3RD EDITION FY 2017-2018
URBAN AREA
Sponsor(s)
Federal Share
$270,764
Total Cost
$300,849
FY
2017
County
STATEWIDE
Status
A
Scope
SP
Project #
100066671 HSIP NR17 ()
Project Description
DEVELOPMENT OF USRAP (PHASE IV); COVERING THE STATE
URBAN AREA
Sponsor(s)
Federal Share
$335,971
Total Cost
$373,301
FY
2017
County
STATEWIDE
Status
A
Scope
SP
Project #
100066696 RHCH RR17 ()
Project Description
EVALUATE 25 AT-GRADE RAILROAD CROSSING LOCATIONS TO DEVELOP SAFETY IMPROVEMENTS FOR THE PHASE XVII PROGRAM DOCUMENT.
URBAN AREA
Sponsor(s)
Federal Share
$90,000
Total Cost
$100,000
FY
2017
County
STATEWIDE
Status
A
Scope
SP
Project #
100066790 HSIP NR17 ()
Project Description
SAFETY TECHNICAL ASSISTANCE FOR COUNTIES AND CITIES (STACC) PROGRAM
URBAN AREA
Sponsor(s)
Federal Share
$78,692
Total Cost
$87,436
FY
2017
County
STATEWIDE
Status
A
Scope
SP
Project #
100066790 HSIP NR17 ()
Project Description
SAFETY TECHNICAL ASSISTANCE FOR COUNTIES AND CITIES (STACC) PROGRAM
URBAN AREA
Sponsor(s)
Federal Share
$281,308
Total Cost
$312,564
FY
2017
County
SUMTER
Status
A
Scope
CN
Project #
100061880 ACAA61880 ATRP ()
Project Description
LIGHTING IMPROVEMENTS ALONG I-20/59 AT SR-28 (EXIT 17)
URBAN AREA
Sponsor(s)
Federal Share
$189,909
Total Cost
$237,387
FY
2017
County
SUMTER
Status
A
Scope
FM
Project #
100064305 STPAA-HSIP 0116 ()
Project Description
PLANING, PATCHING, LEVELING, RESURFACING, AND 2 FT SAFETY WIDENING ON SR-116 FROM SR-17 TO SR-39
URBAN AREA
Sponsor(s)
Federal Share
$910,254
Total Cost
$1,011,393
FY
2017
County
SUMTER
Status
A
Scope
FM
Project #
100065809 STPAA-HSIP 0028 ()
Project Description
RESURFACING AND 2FT SAFETY WIDENING ON SR-28 FROM SR-17 (MP 0.000) TO SR-7 (MP 7.666)
URBAN AREA
Sponsor(s)
Federal Share
$650,759
Total Cost
$723,065
FY
2017
County
TALLADEGA
Status
A
Scope
FM
Project #
100064212 NH-HSIP 0021 ()
Project Description
RESURFACE AND 2' SAFETY WIDENING ON SR-21 FROM SR-275 SOUTH MP 227.953 TO SR-275 NORTH MP 234.713
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$232,053
Total Cost
$257,837
FY
2017
County
TALLAPOOSA
Status
A
Scope
FM
Project #
100065898 STPAA-HSIP 0049 ()
Project Description
RESURFACE, STRIPE AND 2' SAFTEY WIDENING SR-49 FROM NORTH END OF BRIDGE OVER SOUGAHATCHEE CREEK (MP 14.676) TO NORTH OF SR-50 (MP 20.700)
URBAN AREA
Sponsor(s)
Federal Share
$352,471
Total Cost
$391,635
FY
2017
County
WALKER
Status
A
Scope
FM
Project #
100066070 STPAA-HSIP 0124 ()
Project Description
RESURFACE AND 2 FT SAFETY WIDENING SR-124 FROM MP 0.000 AT SR-118 (US-78) TO MP 10.896 AT THE INTERSECTION WITH SR-69
URBAN AREA
Sponsor(s)
Federal Share
$38,009
Total Cost
$42,232
FY
2017
County
WALKER
Status
A
Scope
FM
Project #
100066070 STPAA-HSIP 0124 ()
Project Description
RESURFACE AND 2 FT SAFETY WIDENING SR-124 FROM MP 0.000 AT SR-118 (US-78) TO MP 10.896 AT THE INTERSECTION WITH SR-69
URBAN AREA
Sponsor(s)
Federal Share
$1,112
Total Cost
$1,236
FY
2017
County
WILCOX
Status
A
Scope
FM
Project #
100065962 STPAA-HSIP 0021 ()
Project Description
2 FT SAFETY WIDENING (PARTIAL) AND RESURFACING ON SR-21 EAST OF CR-59 TO 1.1 MILES EAST OF WOLF CREEK BRIDGE
URBAN AREA
Sponsor(s)
Federal Share
$101,721
Total Cost
$113,023
FY
2017
County
WINSTON
Status
C
Scope
CN
Project #
100053315 NH 0074 ()
Project Description
BRIDGE RAIL RETROFIT SR-74 (US-278) OVER SIPSEY RIVER BIN # 007095
URBAN AREA
Sponsor(s)
Federal Share
$139,518
Total Cost
$174,667
FY
2017
County
WINSTON
Status
A
Scope
FM
Project #
100066071 NH-HSIP 0074 ()
Project Description
RESURFACE AND SCORE EXISTING SHOULDERS ON SR-74(US-278) FROM MP 34.832 JUST EAST OF CR-20 TO JUST WEST OF CHILCOAT ROAD AT MP 40.464
URBAN AREA
Sponsor(s)
Federal Share
$7,193
Total Cost
$7,992
FY
2017
County
STATEWIDE
Status
P
Scope
SP
Project #
100046344 TAP LVOE ()
Project Description
LEVEL OF EFFORT FOR TRANSPORTATION ALTERNATIVES PROGRAM FY 2017
URBAN AREA
Sponsor(s)
LVOE Budget
$15,279,000
FY
2017
County
AUTAUGA
Status
A
Scope
CN
Project #
100064605 TAPMN TA15 ()
Project Description
MAPLE STREET SIDEWALK-HISTORIC DISTRICT IMPROVEMENTS FROM THE INTERSECTION OF SELMA HIGHWAY TO INTERSECTION WITH BRIDGE STREET IN THE CITY OF PRATTVILLE
URBAN AREA
MONTGOMERY
Sponsor(s)
  • CITY OF WETUMPKA
Federal Share
$199,732
Total Cost
$249,665
FY
2017
County
AUTAUGA
Status
A
Scope
CN
Project #
100065851 TAPMN TA16 ()
Project Description
DOWNTOWN PEDESTRIAN PATH IMPROVEMENTS IN THE CITY OF PRATTVILLE ON PRATT ST FROM EAST MAIN STREET TO WATER STREET
URBAN AREA
MONTGOMERY
Sponsor(s)
  • TBD
Federal Share
$178,744
Total Cost
$223,430
FY
2017
County
BALDWIN
Status
C
Scope
CN
Project #
100064552 TAPAA TA15 ()
Project Description
NEIGHBORHOOD CONNECTIVITY SIDEWALK LOCATED ON LAUDER LANE, BAY LA LAUNCH AVENUE, GULF BAY ROAD, OAK RIDGE DRIVE AND SR-161 IN THE CITY OF ORANGE BEACH
URBAN AREA
LILLIAN(PENSACOLA)
Sponsor(s)
  • CITY OF ORANGE BEACH
Federal Share
$400,000
Total Cost
$500,016
FY
2017
County
BALDWIN
Status
A
Scope
CN
Project #
100064555 TAPNU TA15 ()
Project Description
SIDEWALKS ON THE WEST SIDE OF CR-13 FROM WHISPERING PINES ROAD/PLEASANT ROAD TO CHAMPIONS WAY/LAWSON ROAD-1.5 MILES IN THE CITY OF DAPHNE.
URBAN AREA
EASTERN SHORE
Sponsor(s)
  • CITY OF DAPHNE
Federal Share
$399,966
Total Cost
$499,958
FY
2017
County
CALHOUN
Status
A
Scope
CN
Project #
100062597 TAPOA TA14 ()
Project Description
SIDEWALK REHABILITATION AND ADA CURB CUTS ON MAIN STREET, SNOW STREET AND CHOCCOLOCCO STREET IN OXFORD
URBAN AREA
ANNISTON
Sponsor(s)
  • CITY OF OXFORD
Federal Share
$399,740
Total Cost
$499,675
FY
2017
County
CHAMBERS
Status
A
Scope
CN
Project #
100065524 TAPOA TA16 ()
Project Description
LANETT DOWNTOWN TRIANGLE STREETSCAPE LOCATED ON NORTH LANIER AVENUE AND FIRST STREET IN THE CITY OF LANETT.
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$27,705
Total Cost
$34,631
FY
2017
County
CHAMBERS
Status
A
Scope
CN
Project #
100065524 TAPOA TA16 ()
Project Description
LANETT DOWNTOWN TRIANGLE STREETSCAPE LOCATED ON NORTH LANIER AVENUE AND FIRST STREET IN THE CITY OF LANETT.
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$201,687
Total Cost
$252,109
FY
2017
County
COLBERT
Status
A
Scope
CN
Project #
100064525 TAPOA TA15 ()
Project Description
SIDEWALKS ALONG SHEFFIELD AVENUE SIXTH STREET AND ELLEDGE LANE IN THE CITY OF MUSCLE SHOALS.
URBAN AREA
SHOALS
Sponsor(s)
  • MUSCLE SHOALS
Federal Share
$240,570
Total Cost
$300,713
FY
2017
County
COLBERT
Status
C
Scope
CN
Project #
100065539 TAPOA TA16 ()
Project Description
VEGETATION MANAGEMENT PROJECT ON ALL COLBERT COUNTY ROADS INSIDE THE COLBERT COUNTY MAINTENANCE PROGRAM.
URBAN AREA
SHOALS
Sponsor(s)
  • COLBERT COUNTY
Federal Share
$51,168
Total Cost
$63,960
FY
2017
County
COVINGTON
Status
A
Scope
CN
Project #
100063181 TAPNU TA14 ()
Project Description
FIFTH AVENUE SIDEWALK IMPROVEMENTS - PHASE IV 5TH AVENUE SR-55 FROM 6TH STREET TO 7TH STREET IN THE CITY OF FLORALA.
URBAN AREA
Sponsor(s)
Federal Share
$301,118
Total Cost
$376,397
FY
2017
County
COVINGTON
Status
A
Scope
CN
Project #
100064540 TAPAA TA15 ()
Project Description
SIDEWALK IMPROVEMENTS LOCATED ON LINDSEY BRIDGE ROAD, SR-15/STANLEY AVENUE AND INTO THE CITY PARK IN THE CITY OF ANDALUSIA.
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$394,218
Total Cost
$492,773
FY
2017
County
ELMORE
Status
A
Scope
CN
Project #
100062517 TAPMN TA14 ()
Project Description
PEDESTRIAN WALKWAY-COOTERS POND PARK AT THE ALABAMA RIVER IN PRATTVILLE.
URBAN AREA
MONTGOMERY
Sponsor(s)
  • CITY OF PRATTVILLE
Federal Share
$194,688
Total Cost
$243,360
FY
2017
County
ESCAMBIA
Status
A
Scope
CN
Project #
100064547 TAPAA TA15 ()
Project Description
PEDESTRIAN IMPROVEMENTS ON OLD CASTLEBERRY ROAD DOGWOOD RECREATION CENTER TO BREWTON MIDDLE SCHOOL.
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$341,297
Total Cost
$426,621
FY
2017
County
ESCAMBIA
Status
A
Scope
CN
Project #
100065564 TAPNU TA16 ()
Project Description
SIDEWALK IMPROVEMENTS ON RINGOLD STREET, COLLEGE STREET AND JACKSON STREET IN THE TOWN OF FLOMATON.
URBAN AREA
Sponsor(s)
Federal Share
$187,110
Total Cost
$233,888
FY
2017
County
FAYETTE
Status
A
Scope
CN
Project #
100064559 TAPNU TA15 ()
Project Description
DOWNTOWN SIDEWALK IMPROVEMENT ALONG TEMPLE AVE. IN THE DOWNTOWN BUSINESS DISTRICT ALONG THE WEST SIDE OF TEMPLE AVE. BEGINNING AT 2ND ST. NE AND ENDING AT 5TH ST. NW IN THE CITY OF FAYETE.
URBAN AREA
Sponsor(s)
Federal Share
$409,152
Total Cost
$511,440
FY
2017
County
FRANKLIN
Status
A
Scope
CN
Project #
100064523 TAPAA TA15 ()
Project Description
DOWNTOWN SIDEWALK IMPROVEMENTS LOCATED ALONG BOTH SIDES OF FRANKLIN STREET AND LAWRENCE STREET FROM WASHINTON AVENUE TO COFFEE AVENUE IN DOWNTOWN RUSSELLVILLE.
URBAN AREA
Sponsor(s)
  • TBD
Federal Share
$392,593
Total Cost
$490,741
FY
2017
County
GENEVA
Status
A
Scope
CN
Project #
100063176 TAPAA TA14 ()
Project Description
SIDEWALKS ALONG SR-52 ROEHLIG STREET, 6TH AVENUE, FULTON STREET AND LILY STREET IN THE CITY OF HARTFORD.
URBAN AREA
Sponsor(s)
Federal Share