Welcome to ALDOT
LEVEL OF EFFORT SAFETY PROGRAM FY 2020
HORIZONTAL CURVE ROADWAY SIGNING IMPROVEMENTS ON STATE ROUTES 5, 13, 14, 17, 18, 19, 33, 39, 44, 69, 74, 86, 96, 102, 107, 118, 124, 129, 142, 159, 171, 172, 187, 195, 233, 241, 243, 253, AND 269 IN THE FAYETTE AREA
HORIZONTAL CURVE ROADWAY SIGNING IMPROVEMENTS ON STATE ROUTES 5, 6, 7, 13, 14, 17, 22, 25, 28, 39, 60, 69, 116, 145, 155, 171, 175, 183, 191, 215, 216, 219, 382 IN THE TUSCALOOSA AREA
HORIZONTAL CURVE ROADWAY SIGNING IMPROVEMENTS ON STATE ROUTES 1,4,9,14,15,21,22,38,46,48,49,50,53,63,74,77,115,120,128,144,147,148,200,202,204,229,259,275,281, AND 301 IN THE ALEXANDER CITY AREA
HORIZONTAL CURVE ROADWAY SIGNING IMPROVEMENTS ON STATE ROUTES 3,4,5,7,23,25,34,38,53,67,70,74,75,76,79,119,132,139,144,145,149,150,151,155,160, 174,261,269,378 (IN THE BHAM AREA,BLOUNT,ST. CLAIR,SHELBY AND JEFFERSON COUNTIES)
RESURFACING AND 2 FT SAFETY WIDENING ON SR-181 FROM SR-42 (US-98) TO JUST SOUTH OF QUAIL CREEK DRIVE
INTERSECTION RELOCATION AND TRAFFIC SIGNAL INSTALLATION ON SR-16 (US-90) AT SR-59 IN LOXLEY
INTERSECTION RELOCATION AND TRAFFIC SIGNAL INSTALLATION ON SR-16 (US-90) AT SR-59 IN LOXLEY
RESURFACING ON SR-59 FROM E 29TH AVENUE TO CR-12. HSIP FUNDING FOR GUARDRAIL WITH STEEL BLOCKOUTS.
CONSTRUCT OFFSET LEFT TURN LANES ON FOLEY BEACH EXPRESS AT CR-12
INTERSECTION REALIGNMENT AND INSTALLATION OF TURN LANES AT CR-31 (OLD HIGHWAY 31) AND SR-3 (US-31)
GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 007678) ON CR-20 OVER JACKSON CREEK; SITE 2 - (BIN 007679) ON CR-20 OVER PAULS CREEK; SITE 3 - (BIN 005189) ON CR-20 OVER LINDSEY CREEK
RESURFACING AND 2 FT SAFETY WIDENING ON SR-223 FROM THE PIKE COUNTY LINE TO 0.57 MILE SOUTH OF CR-28
GUARDRAIL AND GUARDRAIL END ANCHORS AT (BIN 004838) ON CR-16 OVER PERSIMMON CREEK
WIDENING, LEVELING, RESURFACING AND TRAFFIC STRIPING ON CR-83 FROM 3.6 MILES SOUTH OF SR-50 NORTHWEST FOR .68 MILE - CCP 09-10-18
WIDENING, LEVELING, RESURFACING AND TRAFFIC STRIPING ON CR-83 FROM 3.6 MILES SOUTH OF SR-50 NORTHWEST FOR .68 MILE - CCP 09-10-18
RESURFACING, TRAFFIC STRIPING AND 2 FT SAFETY WIDENING ON SR-1 (US-431) FROM THE LEE COUNTY LINE (MP 146.463) TO 0.36 MILE NORTH OF SR-147 (MP 150.20)
WIDENING, LEVELING, RESURFACING AND TRAFFIC STRIPING ON CR-289 FROM 3750 FEET NORTH OF CR-216 NORTHWEST FOR 770 FEET
RESURFACING ON SR-9 IN CENTRE FROM THE INTERSECTION OF SR-68 TO THE SOUTH END OF THE BRIDGE OVER THE COOSA RIVER NEAR CEDAR BLUFF TO INCLUDE GUARDRAIL RESET (SAFETY REPLACEMENT OF STEEL BLOCK OUTS)
RESURFACING, 2 FT SAFETY WIDENING, AND SHOULDER SCORING ON SR-3 (US-31) PARALLEL TO THE CSX RAILROAD FROM THE THORSBY NORTH CITY LIMITS TO THE JEMISON NORTH CITY LIMITS
GUARDRAIL END ANCHORS AT (BIN 009583) ON CR-1 OVER CANE CREEK
RESURFACING, TRAFFIC STRIPING, AND 2 FT SAFETY WIDENING ON SR-77 FROM THE RANDOLPH COUNTY LINE (MP 25.208) TO SR-49 (MP 32.099)
PLANING, RESURFACING AND 2' SAFETY WIDENING OF SR-134 FROM SR-87 TO SR-88
UPGRADE RR CROSSING DEVICES ON MAIN ST. DOT NO. 731919B AND SADIE ROBERSON ST. DOT NO. 731921C, REF#1412(XVII-R) IN LEIGHTON TO INCLUDE MAST MOUNTED SIGNALS, GATES, BELLS, GCP'S, SIGNS, MARKINGS AND LEGENDS
RAILROAD GRADE CROSSING IMPROVEMENTS, MAST MOUNTED SIGNALS, BELLS, GATES, SIGNS, MARKINGS AND LEGENDS AT WEST 2ND STREET AND NORFOLK SOUTHERN RAILROAD IN TUSCUMBIA, DOT NO. 731950M
RESURFACING AND STEEL BLOCKOUT REPLACEMENT ON SR-3 (US-31) FROM SR-12 (US-84) TO THE CSX OVERPASS BRIDGE
INTERSECTION RE-ALIGNMENT AND MODIFICATIONS OF SR-3 (US-31) AND SR-12 (US-84) FROM MP 92.7 TO MP 93.1
RESURFACING AND 2 FT SAFETY WIDENING ON SR-52 FROM SR-9 (US-331) IN OPP TO HARVEST TIME ROAD
PAVEMENT PRESERVATION - WITH 2 FT SAFETY WIDENING ON SR-9 (US-331) FROM THE NORTH FLORALA CITY LIMIT TO RANDELL ROAD
ROUNDABOUT INSTALLATION AT THE INTERSECTION OF SR-55 AND SR-12 (US-84)
GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 007111) ON CR-93 OVER AN UNNAMED TRIBUTARY TO POND CREEK; SITE 2 - (BIN 007466) ON CR-93 OVER POND CREEK; SITE 3 - (BIN 011305) ON CR-93 OVER POND CREEK
GUARDRAIL AND GUARDRAIL END ANCHORS ON CR-32 OVER AN UNNAMED TRIBUTARY TO FIVE RUNS CREEK
RESURFACING, 2FT SAFETY WIDENING,CULVERT EXTENSIONS AND GUARDRAIL ON SR-97 FROM SR-9 (US-331) TO THE MONTGOMERY COUNTY LINE
INSTALL GUARDRAIL AND END ANCHORS AT (BIN 012976) CR-113 OVER JUDY CREEK, (BIN 010981) CR-60 OVER LITTLE JUDY CREEK, (BIN 003095) CR-54 OVER COTTON CREEK
REALIGNING OF SR-85, SIGNING UPGRADE, AND REMOVING OVERHEAD FLASHER AT SR-85 AND SR-167
GUARDRAIL AND GUARDRAIL END ANCHORS AT (BIN 004660) ON HARRISON AVENUE OVER BEECH CREEK
ROADWAY SIGNING IMPROVEMENTS ALONG THE CORRIDOR OF CR-89(DESOTO PARKWAY NE) FROM SR-35 TO THE ENTRANCE OF DESOTO STATE PARK
SAFETY IMPROVEMENTS (WIDENING FOR CHICANES, HIGH FRICTION SURFACE TREATMENT, PEDESTRIAN CROSSINGS, AND ROADWAY SIGNS) ALONG THE CORRIDOR OF DESOTO PARKWAY NE (CR-89) FROM THE SOUTH ENTRANCE OF DESOTO STATE PARK TO CR-165 IN THE CITY OF FORT PAYNE
INSTALLATION OF A ROUNDABOUT AT THE INTERSECTION OF REDLAND ROAD (CR-8) AND FIRETOWER/DOZIER ROAD (CR-59).
UPGRADE TRAFFIC SIGNALS ON SR-9 (US-231) FROM TODD ROAD TO SR-9 (CENTRAL PLANK ROAD)
RESURFACING ON SR-15 (US-29) FROM WILLIAM COOK ROAD TO THE COVINGTON COUNTY LINE. HSIP FUNDING FOR GUARDRAIL WITH STEEL BLOCKOUTS.
RESURFACING AND STEEL BLOCKOUT REPLACEMENT ON SR-41 FROM SR-3 TO NORTH OF BURNT CORN CREEK
RESURFACING AND 2 FT SAFETY WIDENING ON SR-171 FROM STOUGH ROAD AT MP 47.101 TO THE MARION COUNTY LINE AT MP 52.775
INSTALL RAILROAD CROSSING DEVICES ON BREWER LANE IN RUSSELLVILLE, DOT NO. 727132W, REF#1315 (XVI-R), TO INCLUDE STANDARD MAST MOUNTED SIGNALS, GATES, BELLS, GCP'S, SIGNS, MARKINGS AND LEGENDS
RAILROAD CROSSING IMPROVEMENTS, GATES, LIGHTS, BELLS, SIGNS, MARKINGS AND LEGENDS AT CR-42 (WALNUT GATE ROAD) AND NORFOLK SOUTHERN RAILROAD
STOP LINES AND RUMBLE STRIPS INSTALLATION FOR THE FOLLOWING SITES: SITE 1 - INTERSECTION OF CR-85 AND CR-44; SITE 2 - INTERSECTION OF CR-49 AND CR-28
GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 (BIN 003970) ON CR-17 OVER SAMSON BRANCH: SITE 2 (BIN 013483) ON CR-16 OVER JUSTICE MILL CREEK.
SAFETY SIGNING INSTALLATION FOR THE FOLLOWING SITES: SITE 1-INTERSECTION OF CR-85 AND CR-44 SITE 2-INTERSECTION OF CR-49 AND CR-28
INSTALLING RUMBLE STRIPS, UPGRADING SIGNING, AND REMOVAL OF OVERHEAD FLASHER ON SR-153 AT SR-52
RESURFACING, 2FT SAFETY WIDENING, AND EDGELINE SCORING ON SR-13 (US-43) FROM THE EUTAW CITY LIMITS TO SR-14 (INCLUDING THE BRIDGE OVER NORFOLK SOUTHERN RAILWAY)
RESURFACING, 2 FT SAFETY WIDENING, CENTERLINE AND EDGELINE SCORING ON SR-69 FROM 0.61 MILE SOUTH OF CR-32 TO SR-60
INTERSECTION IMPROVEMENTS (ROUNDABOUT) AT CAMPBELLTON HIGHWAY (CR-203) AND TAYLOR ROAD (CR-64)
INTERSECTION IMPROVEMENTS AND ACCESS MANAGEMENT WEST OF COWARTS ON SR-12 (US-84) FROM 150' WEST OF HEALTH SCIENCES BLVD TO 1470' EAST OF EDDINS RD INCLUDING WIDENING OF TURN LANE, ADDITION OF ACCELERATION LANE AND MEDIAN CROSSOVER PROTECTION
INSTALL NEW RAILROAD CROSSING DEVICES ON VENSON STREET IN THE TOWN WOODVILLE AT NORFOLK SOUTHERN RAILROAD, DOT NO. 731-754F, REF NO. 1319 (XVI-R), TO INCLUDE STANDARD MAST MOUNTED SIGNALS, GATES, BELLS, GCP'S, SIGNS, STRIPING, MARKINGS AND LEGENDS
INTERSECTION MODIFICATIONS AT THE INTERSECTION OF SR-2 (US-72) AND SR-79
GUARDRAIL END ANCHORS AT (BIN 000988) ON SNODGRASS ROAD OVER DRY CREEK
RESURFACING, PLANING, STRIPING, LEVELING, PATCHING AND 2FT SAFETY WIDENING ON SR-75 FROM A JOINT 116FT SOUTH OF FOX HILL DR. TO 240FT SOUTH OF INNSBROOKE PARKWAY
RESURFACING, PLANING, STRIPING, LEVELING, PATCHING AND 2FT SAFETY WIDENING ON SR-3(US-31) FROM .2 MILE NORTH OF FINLEY BLVD TO A JOINT AT 52ND AVE NORTH
RESURFACING AND 2 FT SAFETY WIDENING ON SR-17 FROM THE PICKENS COUNTY LINE AT MP 220.970 TO THE MILLPORT CITY LIMITS AT MP 227.000
GUARDRAIL AND GUARDRAIL END ANCHORS; CR-49 #2(4248) #3(4249)YELLOW CREEK (RELIEF),#4(4250)YELLOW CREEK; CR-41 #7(4746) MILL CREEK, #8(4747)TRIBUTARY TO LUXAPALLILA CREEK; #9 CR-21(6869)CUT BANK CREEK; CR-15 #10(6871)DRY CREEK
ROUNDABOUT AT THE INTERSECTION OF SR-147 (NORTH COLLEGE STREET) AND CR-72 (FARMVILLE ROAD)
ROUNDABOUT AT THE INTERSECTION OF SR-147 (NORTH COLLEGE STREET) AND CR-72 (FARMVILLE ROAD)
ROUNDABOUT AT THE INTERSECTION OF WIRE ROAD AND COX ROAD IN THE CITY OF AUBURN
RESURFACING AND 2 FT SAFETY WIDENING ON SR-8 (US-80) FROM THE MACON COUNTY LINE TO THE RUSSELL COUNTY LINE
RESURFACING AND 2 FT SAFETY WIDENING ON SR-8 (US-80) FROM THE MACON COUNTY LINE TO THE RUSSELL COUNTY LINE
MODIFYING VERTICAL CURVE, ADDING ACCELERATION LANES, AND IMPROVING MEDIAN ON SR-38 (US-280) AT SR-147
MODIFYING VERTICAL CURVE, ADDING ACCELERATION LANES, ADDING TRAFFIC SIGNAL, AND IMPROVING MEDIAN ON SR-38 (US-280) AT SR-147
GUARDRAIL AND GUARDRAIL END ANCHORS AT (4430) CR-379 MILL CR; (4750) CR-148 PHELPS CR; (10292) CR-188 LOBLOCKEE CR; (3310) CR-175 TRIB TO LITTLE UCHEE CR; (4416) CR-183 WACOOCHEE CR; (3645) CR-126 BRUSH CR; (5051) CR-29 COSSEY BR
INTERSECTION MODIFICATION ON EAST LIMESTONE ROAD (CR-109) AND CAPSHAW ROAD (CR-36) TO INSTALL A ROUNDABOUT
WIDENING, LEVELING, AND RESURFACING ON CR-65(EASTER FERRY ROAD) FROM 0.03 MILES NORTH OF SULPHUR CREEK BRIDGE FOR 826 FEET
RESURFACING AND 2 FT SAFETY WIDENING ON SR-97 FROM SR-3 (US-31) TO I-65
RESURFACING ON SR-2 (US-72) IN GURLEY FROM 0.39 MILE EAST OF THE FLINT RIVER TO 0.41 MILE EAST OF PARNELL CIRCLE IN WOODVILLE, TO INCLUDE GUARDRAIL RESET (SAFETY REPLACEMENT OF STEEL BLOCK OUTS)
GUARDRAIL AND GUARDRAIL END ANCHORS AT (BIN 001861) ON PULASKI PIKE (CR-17) OVER LIMESTONE CREEK
RESTRICTED CROSSING U-TURN INTERSECTION ON SR-8 (US-80) AND SR-25
RESURFACING AND GUARDRAIL RESET FOR STEEL BLOCK-OUTS ON SR-13 (US-43) FROM SR-8 (US-80) TO THE NORTH END OF THE BLACK WARRIOR RIVER BRIDGE
RESURFACING AND GUARDRAIL STEEL BLOCKOUT REPLACEMENT ON I-22 FROM EXIT 22 (MP 22.600) TO EXIT 30 (MP 29.950)
RESURFACING AND GUARDRAIL (STEEL BLOCKOUTS) ON SR-13 FROM THE WINSTON COUNTY LINE AT MP 271.312 TO BEAR CREEK AT MP 276.074 PARALLEL TO THE NORFOLK SOUTHERN RAILWAY COMPANY
GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 015452) ON CR-56 OVER HURRICANE CREEK; SITE 2 - (BIN 006076) ON CR-47 OVER EAST BRANCH; SITE 3 - (BIN 012641) ON CR-85 OVER FLATT CREEK
RESURFACING, CENTERLINE AND SHOULDER SCORING, AND 2 FT SAFETY WIDENING ON SR-241 FROM SR-172 AT MP 11.548 TO THE FRANKLIN COUNTY LINE AT MP 13.503
RAILROAD CROSSING IMPROVEMENTS, MARKINGS, LIGHTS, BELLS, LEGENDS, GATES, SIGNS AND SIGNALS ON FERRY AVENUE AT NORFOLK SOUTHERN RAILROAD DOT# 727825T AND ALABAMA AND GULF COAST RAILWAY DOT# 665312V IN SARALAND
ROUNDABOUT INSTALLATION AT CANAL STREET AND BROAD STREET
RAILROAD CROSSING IMPROVEMENTS, GATES AND SIGNALS ON BAYOU AVENUE EAST IN SATSUMA AT NORFOLK SOUTHERN RAILROAD, JUST EAST OF SR-13 (US-43), AAR/DOT NO. 727820J
INSTALL WRONG-WAY ENTRY COUNTERMEASURES, SIGNS AND CONCRETE CURBS AT I-65 AND EDGEMONT AVENUE
INSTALLING INTERSECTION CONFLICT WARNING SYSTEM AT THE INTERSECTION OF SR-8 (US-80) AND WARES FERRY ROAD
INSTALLING INTERSECTION CONFLICT WARNING SYSTEM AT THE INTERSECTION OF SR-8 (US-80) AND WARES FERRY ROAD
WIDENING AND TRAFFIC STRIPE ON HULACO ROAD (CR-1297) FROM SR-67 TO THE MARSHALL COUNTY LINE (SITE 1); LEVELING AND RESURFACING ON BOWLES BRIDGE ROAD (CR-1193) FROM 0.6 MILES EAST OF ANTIQUE LANE FOR 849 FEET (SITE 2)
RESURFACE, 1.5 FT SAFETY WIDENING, CENTER AND EDGELINE SCORING ON SR-17 FROM MP 210.425 JUST NORTH OF 8TH AVENUE TO MP 215.700 SOUTH OF BEAVER CREEK ROAD
RESURFACING, 2 FT SAFETY WIDENING, AND CENTER AND SHOULDER SCORING ON SR-17 FROM BEAVER CREEK ROAD AT MP 215.700 TO THE LAMAR COUNTY LINE AT MP 220.970
RESURFACING AND 2' SAFETY WIDENING ON SR-15 (US-29) FROM SR-93 IN BANKS TO THE BULLOCK COUNTY LINE
FEASIBILITY STUDY FOR ROUNDABOUT AT INTERSECTION OF SR-167 AND SR-87 IN SPRINGHILL
GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 010958) ON CR-2209 OVER DOUBLE BRANCH CREEK; SITE 2 - (BIN 009776) ON CR-2253 OVER WARRICK CREEK; SITE - 3 (BIN 008382) ON CR-3319 OVER MIMS CREEK
INSTALLING TRAFFIC CONTROL DEVICES AND GUARDRAIL ON CR-2238 FROM CR-2243 TO CR-2290 (SITE 1); INSTALLING TRAFFIC CONTROL DEVICES ON CR-6600 FROM SR-223 TO CR-6602 (SITE 2)
INSTALL GUARDRAIL AND END ANCHORS (BIN 011235) ON CR-37 OVER KNOKES CRK; (BIN 007726) ON CR-46 OVER WEDOWEE CRK; (BIN 005976) ON CR-67 OVER WEDOWEE CRK; (BIN 008712) ON CR-15 OVER THE TALLAPOOSA RIVER; AND (BIN 010074) ON CR-5 OVER WESOBULGA CRK
RESURFACING AND 2 FT SAFETY WIDENING ON SR-165 FROM THE BARBOUR COUNTY LINE TO .29 MILE SOUTH OF SR-208
ADDING LEFT TURN LANE ON SR-165 AT CR-24
INSTALL RAILROAD CROSSING DEVICES ON PILGREEN DRIVE IN CALERA, DOT NO. 727 400E, REF#1323 (XVI-R), TO INCLUDE STANDARD MAST MOUNTED SIGNAL, GATE, BELL, GCP'S, SIGNS
RESURFACING, PLANING, STRIPING, LEVELING AND PATCHING, AND 2' SAFETY WIDENING ON SR-25 FROM THE BIBB COUNTY LINE TO CR-73 IN MONTEVALLO
GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 008027) ON VALLEY ROAD OVER TROUT CREEK; SITE 2 - (BIN 005607) ON PLEASANT VALLEY ROAD OVER FISHING CREEK; AND SITE 3 - (BIN 008435) ON ACMAR ROAD OVER LITTLE BLACK CREEK
DEVELOPMENT OF USRAP (PHASE VI); COVERING THE STATE
LOCAL ROAD SAFETY PLAN DEVELOPMENT PHASE I
LOCAL ROAD SAFETY PLANS (LRSP) FOR ALABAMA COUNTIES PHASE II
STATEWIDE PE FOR RAIL SAFETY-HWY PROGRAM FY 2021 AND FY 2022. THIS PROJECT IS ONLY FOR ALDOT PERSONNEL SALARY AND LIMITED RAILROAD PE WORK FOR SAFETY PROJECTS OR SECTION 130 PROJECTS
RR GRADE CROSSING CLOSURE INCENTIVE PAYMENTS FOR FY 2021 AND FY 2022
SIGN INVENTORY AND ASSESSMENT FOR UNSIGNALIZED AND SIGNALIZED INTERSECTIONS AT STATE AND US ROUTES IN SUMTER COUNTY
INSTALLING TRAFFIC CONTROL DEVICES AT THE CR-34/CR-83 INTERSECTION
GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 009148) ON CR-12 OVER SUCARNOOCHEE RIVER; SITE 2 - (BIN 006243) ON CR-10 OVER CHAPEL CREEK; SITE 3 - (BIN 003815) ON CR-12 OVER TEOC CREEK
GUARDRAIL AND GUARDRAIL END ANCHORS AT SITES 1 AND 2 - ON CR-190 (BIN 010422) OVER FANNING BRANCH AND (BIN 008897) OVER HUDSON BRANCH; SITE 3 - (BIN 002871) ON CR-280 OVER CLEAR CREEK; SITE 4 - (BIN 005364) ON CR-382 OVER FAYNE CREEK
RESURFACING, TRAFFIC STRIPE, AND 2 FT SAFETY WIDENING ON SR-50 FROM SR-38 (US-280) (MP 523.108) TO THE CHAMBERS COUNTY LINE (MP 528.520)
GUARDRAIL FOR ROADWAY SAFETY ASSESSMENT SITES ON SR-7 AND SR-171 IN TUSCALOOSA COUNTY
RESURFACING, 2 FT SAFETY WIDENING, AND SCORING ON SR-6 (US-82) FROM GREENWOOD CIRCLE TO DUNCANVILLE MIDDLE SCHOOL ROAD
RESURFACING, 2 FT SAFETY WIDENING AND SHOULDER SCORING ON SR-6 FROM 1.00 MILE EAST OF MIDWAY DRIVE TO THE BIBB COUNTY LINE
RESURFACING AND 2 FOOT SAFETY WIDENING ON SR-265 FROM THE MONROE COUNTY LINE TO 0.97 MILE NORTH OF CR-51
LEVEL OF EFFORT FOR TRANSPORTATION ALTERNATIVES PROGRAM FY 2020
SIDEWALKS ALONG NORTH DOBSON AVENUE FROM PHILLIPS STREET TO BOYKIN STREET
SIDEWALKS ALONG BROWN ST FROM ROOSEVELT AVE TO GIRARD AVE, ALONG ELLEDGE LANE FROM 6TH ST TO HUSTON DR, ALONG WEBSTER ST FROM WEBSTER CIR TO EAST AVALON AVE AND ALONG EDWARDS AVE / BROOKFORD ST FROM FIRESTONE AVE TO EAST AVALON AVE
BICYCLE AND PEDESTRIAN TRAIL EXTENDING IN THE NORTHEAST QUADRANT OF WHIPPORWILL PARK IN THE CITY OF SHEFFIELD
SIDEWALKS ALONG SR-52 FROM 6TH AVENUE TO 4TH AVENUE
STREETSCAPE IMPROVEMENTS ALONG BROAD STREET FROM JORDAN AVENUE TO WICKER ROAD AND ON WICKER ROAD FROM BROAD STREET TO THE DEAD END.
7TH AVENUE SOUTH STREETSCAPE AND IMPROVEMENTS PROJECT LOCATED ON 7TH AVENUE SOUTH AND OTHER VARIOUS STREETS IN THE CITY OF BIRMINGHAM.
7TH AVENUE SOUTH STREETSCAPE AND IMPROVEMENTS PROJECT LOCATED ON 7TH AVENUE SOUTH AND OTHER VARIOUS STREETS IN THE CITY OF BIRMINGHAM.
STREETSCAPES ALONG LEE STREET BETWEEN WHEELER STREET AND THE ROGERSVILLE PUBLIC LIBRARY AND ADA CURB RAMPS ALONG WHEELER STREET BETWEEN SR-2 (US-72) AND LEE STREET
SIDEWALK ALONG BYLER ROAD FROM SOMMERVILLE AVENUE TO SR-157
STREETSCAPE IMPROVEMENTS ON N 8TH STREET FROM N RAILROAD AVENUE TO 1ST AVENUE, AND ON 1ST AVENUE FROM N 8TH STREET TO N 7TH STREET
A - GREENWAY STARTING AT JOHNSON ROAD SW AND RUNNING NORTH ALONG PINHOOK CREEK AND TURNING WEST ALONG MERRIMAC BRANCH WITH A PEDESTRIAN BRIDGE AT THE MIDPOINT OF THE WATERS EDGE
OLD SHELL ROAD SIDEWALK IMPROVEMENTS IN THE CITY OF MOBILE
ADD SIDEWALK ALONG OLD SHELL ROAD FROM MYRTLEWOOD LANE TO WEST I-65 SERVICE ROAD NORTH IN MOBILE
ADD SIDEWALKS ALONG WHISTLER STREET FROM NORTH SHELTON BEACH ROAD TO NORTH PRICE AVENUE IN PRICHARD
SIDEWALKS ALONG THE NORTH SIDE OF OLD SHELL ROAD FROM THE WEST SIDE OF PARKWAY DRIVE TO UNIVERSITY BOULEVARD IN MOBILE
SIDEWALKS ON BEECH STREET, 14TH AVENUE, 7TH STREET SE, 8TH STREET SE, 19TH AVENUE SE, AND 16TH AVENUE
A MULTI-USE PATH ALONG ELM STREET FROM COLLEGE DRIVE TO SOUTH GEORGE WALLACE DRIVE
STREETSCAPE IMPROVEMENTS FROM DOWNTOWN WILSONVILLE TO NEW COMMERCIAL DEVELOPMENT ON SR-25
STATE SUPPORT SERVICES FOR ENVIRONMENTAL DOCUMENT REVIEW FOR VARIOUS PROPOSED AND ONGOING TRANSPORTATION ALTERNATIVE PROJECTS FY 2020 - FY 2021
STREETSCAPE IMPROVEMENTS ALONG SR-21 FROM 5TH STREET TO 6TH STREET, ALSO IMPROVEMENTS ALONG 2ND STREET, CALHOUN STREET AND 3RD STREET
STREETSCAPE AND ADA IMPROVEMENTS TO THE PARKING AREA BETWEEN NORTON AVENUE AND SR-21, 3RD STREET AND 1ST STREET
SIDEWALK ON CYPRESS CREEK AVENUE FROM THE CYPRESS CREEK APARTMENTS TO THE REGAL POINTE APARTMENTS
STREETSCAPE IMPROVEMENTS ON MAIN AVENUE FROM 4TH STREET TO 1ST STREET - PHASE I
LEVEL OF EFFORT COUNTY ALLOCATED FUNDS FY 2020
GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 007678) ON CR-20 OVER JACKSON CREEK; SITE 2 - (BIN 007679) ON CR-20 OVER PAULS CREEK; SITE 3 - (BIN 005189) ON CR-20 OVER LINDSEY CREEK
FULL DEPTH RECLAMATION, RESURFACING, AND STRIPING ON CR-51 FROM PERRY COUNTY LINE NORTH TO SR-219
BRIDGE REPLACEMENT ON CR-22 (DEANS FERRY ROAD) OVER CSX RAILROAD BIN 012072 - BCP 05-163-17
BRIDGE SCOUR COUNTERMEASURES AND GUARDRAIL INSTALLATION ON CR-165 AT BIN 005642 OVER WILLIAMS CREEK (SITE 1) AND AT BIN 005643 OVER OLD TOWN CREEK (SITE 2) - BCP 06-02-18
GUARDRAIL AND GUARDRAIL END ANCHORS AT (BIN 004838) ON CR-16 OVER PERSIMMON CREEK
BRIDGE REPLACEMENT AND APPROACHES (BIN 010008) ON BALLPLAY ROAD OVER MILL CREEK - CCP 08-96-17
WIDENING, RESURFACING, AND TRAFFIC SIGNALIZATION AT CR-208 (PHILLIPS ROAD) AND CR-299 (CUSSETA ROAD) INTERSECTION
PATCHING AND TRAFFIC STRIPING ON CR-51 FROM CR-44 TO CR-42 - CCP 11-587-19
RESURFACING ON CR-9 FROM BONNER TOWN ROAD TO MELVIN CUTOFF ROAD - CCP 12-02-19
GUARDRAIL END ANCHORS AT (BIN 009583) ON CR-1 OVER CANE CREEK
BRIDGE REPLACEMENT (BIN # 9400) AND APPROACHES ON CR-50 OVER MUSCADINE CREEK - CCP 15-30-12
WIDENING AND RESURFACING ON CR-10 FROM CR-25 TO CR-51 - CCP 15-55-18
WIDENING AND RESURFACING ON CR-89 FROM FOREST ROAD TO THE GENEVA COUNTY LINE - CCP 20-379-19
WIDENING AND RESURFACING ON CR-85 FROM CR-38 (POTTER ROAD) TO SR-9(US-331) - CCP 20-378-19
RESURFACING ON CR-1141 FROM CR-1147 TO CR-1246 - CCP 22-67-21
RESURFACING ON CR-21 FROM SR-123 TO THE OZARK CITY LIMITS (SITE 1); RESURFACING ON CR-82 FROM THE COFFEE COUNTY LINE TO SR-53(US-231) (SITE 2); WIDENING AND RESURFACING ON CR-33 FROM CR-20 TO CR-54 (SITE 3)
INSTALLATION OF A ROUNDABOUT AT THE INTERSECTION OF REDLAND ROAD (CR-8) AND FIRETOWER/DOZIER ROAD (CR-59).
RESURFACING AND TRAFFIC STRIPE ON FOXWOOD ROAD FROM THE AUTAUGA COUNTY LINE TO DEATSVILLE HIGHWAY - ECP 26-11-19
RESURFACE DEATSVILLE HIGHWAY FROM THE MILLBROOK CITY LIMITS TO ALPHA LANE - ECP 26-10-19
RESURFACING ON SARDIS ROAD FROM SR-1 (US-431) TO THE DEKALB COUNTY LINE - ECP 28-02-20
RESURFACING ON CR-60 FROM BADGETT ROAD TO CR-56, CR-56 FROM CR-60 TO CR-77, AND CR-77 FROM CR-56 TO THE COLBERT COUNTY LINE o FCP 30-19-01
RESURFACING ON CR-4 FROM CR-53 TO CR-61 - GCP 31-04-19
RESURFACING ON CR-53 FROM THE FLORIDA LINE TO CR-4 - GCP 31-05-19
RESURFACING, TRAFFIC STRIPING AND INSTALLING PAVEMENT MARKERS ON CR-60 FROM CR-191 TO THE TUSCALOOSA COUNTY LINE
WIDEN AND RESURFACE CR-44 FROM SR-69 TO CR-50 - HCP 33-03-18
RESURFACING ON CR-55 FROM SR-134 TO CR-26
FULL DEPTH RECLAMATION, RESURFACING, AND TRAFFIC STRIPING ON CR-188 FROM SR-14 TO SOUGAHATCHEE CREEK
RESURFACING ON SHAW ROAD FROM .913 MILE NORTH OF NUCLEAR PLANT ROAD TO SR-2 (US-72) - LCP 42-168-17
RESURFACING AND TRAFFIC STRIPE ON CR-37 FROM SR-97 TO SR-8 (US-80) - LCP 43-06-18
BRIDGE REPLACEMENT ON CR-44 OVER DRY CREEK BIN # 13020
RESURFACE MARTLING GAP ROAD FROM GILLILAND ROAD TO MARTLING ROAD
PLANING AND RESURFACING ON CR-39 FROM SR-12 (US-84) TO THE ALABAMA RIVER CELLULOSE, LLC ENTRANCE (GATE 4) - MCP 50-10-18
RESURFACING ON CR-28 (MERIWETHER TRAIL) FROM SR-94 TO THE PIKE COUNTY LINE - MCP 51-04-18
BRIDGE REPLACEMENT OF CR-52 BIN # 3267 OVER BUCK CREEK (AASHTO)
BRIDGE REPLACEMENT (BIN 015617) AND APPROACHES ON CR-24 OVER SPRING CREEK - SCP 59-810-12U
GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 008027) ON VALLEY ROAD OVER TROUT CREEK; SITE 2 - (BIN 005607) ON PLEASANT VALLEY ROAD OVER FISHING CREEK; AND SITE 3 - (BIN 008435) ON ACMAR ROAD OVER LITTLE BLACK CREEK
GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 008027) ON VALLEY ROAD OVER TROUT CREEK; SITE 2 - (BIN 005607) ON PLEASANT VALLEY ROAD OVER FISHING CREEK; AND SITE 3 - (BIN 008435) ON ACMAR ROAD OVER LITTLE BLACK CREEK
RESURFACING AND TRAFFIC STRIPE ON CR-27 (FALL CITY ROAD) FROM SR-195 TO THE WINSTON COUNTY LINE - WCP 64-01-18
WIDENING, RESURFACING, CULVERT EXTENSIONS, AND TRAFFIC STRIPE ON COUNTY ROAD 11 (NAUVOO ROAD) FROM 9TH AVENUE NORTHWEST TO KEETON FARM ROAD
WIDENING, RESURFACING, AND STRIPING ON CR-22 FROM SR-221 TO SR-10 - WCP 66-10-16
LEVEL OF EFFORT INTERSTATE RESURFACING FY 2020
PAVEMENT PRESERVATION ON I-65 FROM 1 MILE SOUTH OF LOWNDES COUNTY LINE TO 0.630 MILE SOUTH OF SR-97
PAVEMENT PRESERVATION ON I-65 FROM CR-41 TO 1 MILE SOUTH OF THE LOWNDES COUNTY LINE
RESURFACING (OGFC) ON I-20 FROM SR-21 (EXIT 185) (MP 185.822) TO CLEBURNE COUNTY LINE (MP 193.823)
I-65 BRIDGE RAISING AT BIN 006787 (CR-59), BIN 006788 (CR-24), BIN 006093 (CR-32), BIN 006793 (CR-51), BIN 007152 (SR-145), BIN 006794 (CR-43), BIN 006795 (CR-48) FROM THE AUTAUGA COUNTY LINE TO THE SHELBY COUNTY LINE
RESURFACING (OGFC) ON I-20 FROM THE CALHOUN COUNTY LINE (MP 193.823) TO SR-9 (EXIT 199) (MP 199.850)
RESURFACING AND TRAFFIC STRIPING ON I-20 FROM SR-9 (EXIT 199) (MP 199.850) TO SR-46 (EXIT 205) (MP 205.054)
RESURFACING ON I-20 FROM SR-9 (EXIT 199) (MP 199.835) TO SR-46 (EXIT 205) (MP 205.054)
RESURFACING (OGFC) ON I-20 FROM SR-46 (MP 204.891) TO CR-49 (MP 210.750)
BRIDGE RAISING (BIN 006461) OVER I-65 (EXIT 83) AT CR-6 OVERPASS
BRIDGE RAISING (BIN 006461) OVER I-65 (EXIT 83) AT CR-6 OVERPASS
RECONSTRUCTION OF THE NORTHBOUND ROADWAY ON I-59 FROM SOUTH OF SR-35 (MP 217.850) TO NORTH OF SR-7 (MP 225.350)
I-59/I-20 PARTIAL LIGHTING OF THE SR-14 INTERCHANGE (EXIT 40) IN EUTAW
PAVEMENT REHABILITATION ON I-20 FROM EXIT 140 TO THE ST. CLAIR COUNTY LINE
CONCRETE PAVEMENT PRESERVATION ON I-459 FROM SR-3 (US-31) TO LORNA ROAD (MP 13.866 TO MP 14.794) AND FROM A JOINT SOUTH OF SHADES CREEK TO THE PAVING JOINT SOUTH OF US-280 (MP 15.892 TO MP 19.821)
PAVEMENT REHABILITATION ON I-22 FROM THE WALKER COUNTY LINE TO COALBURG ROAD
CONCRETE REHABILITATION, SHOULDER RECONSTRUCTION, BRIDGE RAIL RETROFIT, AND RAMP IMPROVEMENTS ON I-59 FROM JUST SOUTH OF CR-10 TO JUST PAST THE ST. CLAIR COUNTY LINE
PAVEMENT PRESERVATION ON I-59 FROM THE PAVEMENT JOINT SOUTH OF ALABAMA ADVENTURE PKWY (EXIT 110) TO PAVEMENT JOINT SOUTH OF THE BRIDGES OVER FAIRFIELD BLVD (BINS 12318 AND 12319)
PAVEMENT REHAB AND GUARDRAIL SAFETY IMPROVEMENTS ON I-65. NB: FROM NORTH OF 47TH AVE OVERPASS (MP 265.200) TO SOUTH OF MT. OLIVE RD (MP 271.500). SB: FROM SOUTH OF WALKER CHAPEL RD (MP 266.906) TO SOUTH OF MT. OLIVE RD (MP 271.500)
PAVEMENT PRESERVATION ON I-85 FROM THE MACON COUNTY LINE TO .42 MILE WEST OF SR-15
RESURFACING ON I-65 FROM 0.2 MILE NORTH OF SR-2 (US-72) TO 1 MILE SOUTH OF CSXT OVERPASS INCLUDING BRIDGE RAISING ON BLACK ROAD AND WALES STREET
RESURFACING AND WIDENING ON I-565 FROM 0.545 MILE WEST OF I-65 TO 1.62 MILES EAST OF GREENBRIER ROAD
RESURFACING AND WIDENING ON I-565 FROM 1.62 MILES EAST OF GREENBRIER RD TO 0.25 MILE WEST OF COUNTY LINE ROAD
PAVEMENT PRESERVATION ON I-85 FROM THE MONTGOMERY COUNTY LINE TO SR-138
PAVEMENT PRESERVATION ON I-85 FROM 1.15 MILE NORTH OF CR-36 TO THE LEE COUNTY LINE
ADDITIONAL LANES AND RESURFACING ON I-565 FROM WEST OF COUNTY LINE ROAD TO EAST OF WALL TRIANA HIGHWAY
RESURFACING AND TRAFFIC STRIPING ON I-565 FROM .26 MILE EAST OF THE TRIANA BOULEVARD OVERPASS (MP 18.332) TO .45 MILE EAST OF THE SR-2 (US-72) OVERPASS (MP 22.305)
RESURFACING AND TRAFFIC STRIPING ON I-565 FROM 0.28 MILES EAST OF INTERGRAPH WAY (MP 10.100) TO 0.26 MILES EAST OF THE TRIANA BOULEVARD OVERPASS (MP 18.332)
RESURFACING AND GUARDRAIL STEEL BLOCKOUT REPLACEMENT ON I-22 FROM EXIT 22 (MP 22.600) TO EXIT 30 (MP 29.950)
RESURFACING AND GUARDRAIL STEEL BLOCKOUT REPLACEMENT ON I-22 FROM EXIT 22 (MP 22.600) TO EXIT 30 (MP 29.950)
RESURFACING ON I-22 FROM THE SR-233 OVERPASS (MP 34.46) TO THE WALKER COUNTY LINE (MP 38.47)
RESURFACING ON I-10 FROM .28 MILE WEST OF CAROL PLANTATION ROAD TO 1.36 MILES EAST OF SR-193
RESURFACING ON I-10 FROM .28 MILE WEST OF CAROL PLANTATION ROAD TO 1.36 MILES EAST OF SR-193
RESURFACING ON I-65 FROM 0.56 MILE NORTH OF SR-158 TO 0.41 MILE NORTH OF SR-13(US-43)
RESURFACING ON I-10 FROM 1.36 MILES EAST OF SR-193 TO THE WALLACE TUNNEL
RESURFACING ON I-65 FROM I-10 TO MAIN STREET
RESURFACE WALLACE TUNNEL AND APPROACHES ON I-10
RESURFACE I-65 FROM NORTH OF FAIRVIEW AVENUE TO THE ALABAMA RIVER BRIDGE
PAVEMENT PRESERVATION ON I-65 FROM THE NORTH END OF THE ALABAMA RIVER BRIDGE TO THE ELMORE COUNTY LINE
PLANING, OVERLAY, AND STRIPING ON I-65 FROM THE CR-52 OVERPASS TO THE SOUTH END OF THE CAHABA RIVER BRIDGE
PLANING, OVERLAY, AND STRIPING ON I-65 FROM THE CR-52 OVERPASS TO THE SOUTH END OF THE CAHABA RIVER BRIDGE
PAVEMENT REHABILITATION ON I-20 FROM THE JEFFERSON COUNTY LINE TO 0.87 MILE EAST OF KELLY CREEK ROAD
PRIORITIZING INTERSTATE MAINTENANCE PROJECTS FY-20 AND FY-21
RESURFACING ON I-22 FROM .8 MILE EAST OF THE CR-61 OVERPASS TO THE JEFFERSON COUNTY LINE
LEVEL OF EFFORT NON-INTERSTATE RESURFACING (FM) FY 2020
RESURFACING AND BRIDGE GUARDRAIL RETROFIT ON SR-3 (US-31) FROM I-65 TO THE CHILTON COUNTY LINE
RESURFACING AND 2 FT SAFETY WIDENING ON SR-181 FROM SR-42 (US-98) TO JUST SOUTH OF QUAIL CREEK DRIVE
RESURFACING ON SR-59 FROM E 29TH AVENUE TO CR-12. HSIP FUNDING FOR GUARDRAIL WITH STEEL BLOCKOUTS.
RESURFACING ON SR-3 (US-31) FROM CROSBY ROAD TO THE ESCAMBIA COUNTY LINE
MILLING AND RESURFACING ON SR-10 FROM .48 MILE EAST OF SR-51 TO EAST INTERSECTION OF CR-41 AND SR-10.
RESURFACING AND 2 FT SAFETY WIDENING ON SR-223 FROM THE PIKE COUNTY LINE TO 0.57 MILE SOUTH OF CR-28
CAPE SEALING ON SR-263 FROM SR-185 TO SR-21
ACCESS MANAGEMENT, RESURFACING, TRAFFIC STRIPE, GUARDRAIL, AND BRIDGE RAIL RETROFIT ON SR-1 (US-431) FROM THE END OF SR-1 (US-431) BYPASS (MP 233.238) TO 0.116 MILE NORTH OF SR-144 (MP 240.491)
RESURFACING, TRAFFIC STRIPING AND 2 FT SAFETY WIDENING ON SR-1 (US-431) FROM THE LEE COUNTY LINE (MP 146.463) TO 0.36 MILE NORTH OF SR-147 (MP 150.20)
RESURFACING AND TRAFFIC STRIPE ON SR-147 FROM THE LEE COUNTY LINE (MP 12.826) TO THE INTERSECTION OF SR-1 (US-431) (MP 17.001)
RESURFACING ON SR-9 IN CENTRE FROM THE INTERSECTION OF SR-68 TO THE SOUTH END OF THE BRIDGE OVER THE COOSA RIVER NEAR CEDAR BLUFF TO INCLUDE GUARDRAIL RESET (SAFETY REPLACEMENT OF STEEL BLOCK OUTS)
RESURFACING ON SR-9 IN CENTRE FROM THE INTERSECTION OF SR-68 TO THE SOUTH END OF THE BRIDGE OVER THE COOSA RIVER NEAR CEDAR BLUFF TO INCLUDE GUARDRAIL RESET (SAFETY REPLACEMENT OF STEEL BLOCK OUTS)
RESURFACING, 2 FT SAFETY WIDENING, AND SHOULDER SCORING ON SR-3 (US-31) PARALLEL TO THE CSX RAILROAD FROM THE THORSBY NORTH CITY LIMITS TO THE JEMISON NORTH CITY LIMITS
RESURFACING ON SR-10 FROM CR-45 TO 0.47 MILE WEST OF THE BUTLER TOWN LIMITS