Welcome to ALDOT
LEVEL OF EFFORT SAFETY PROGRAM FY 2024
RESURFACING, SCRUB SEAL, AND STEEL BLOCKOUT REPLACEMENT AREA WIDE (GROVE HILL): SR-10 (MP 0-7.62); SR-59 (MP 80.68-93.66); SR-17 (MP 84.38-91.38); SR-21 (MP 84.08-91.41); SR-41 (MP 74.09-80.61); SR-154 (MP 16.14-21.88)
SAFETY STUDIES, TRAFFIC COUNTS, AND OTHER ENGINEERING SERVICES AS NEEDED TO SUPPORT THE SOUTHEAST REGION SAFETY PROGRAM FY2024-FY2027
RESURFACING AND SAFETY IMPROVEMENTS (2' SAFETY WIDENING AND SCORING) ON CR-68 FROM CR-57 TO SR-3 (US-31)
RESURFACING, 2' SAFETY WIDENING, SIGNAL BACKPLATES, AND BRIDGE RAIL RETROFIT ON SR-287 FROM SR-59 TO I-65
LOW COST SAFETY IMPROVEMENTS ON FOLEY BEACH EXPRESS FROM CR-12 TO-CR-28
SHOULDER WIDENING, SUPERELEVATION CORRECTIONS AND RUMBLE STRIPS ON FOLEY BEACH EXPRESS FROM CR-12 TO SR-59 IN THE CITY OF FOLEY
WIDENING FOR CENTER TURN LANE ADDITION ON SR-3 (US-31) FROM OLD HWY 31 TO 0.265 MILES EAST OF COLEMAN LANE
RAILROAD CROSSING IMPROVEMENTS FOR THE INSTALLATION OF ADVANCED WARNING SIGNS, SIGNS, MARKINGS AND LEGENDS AT RANDOLPH AVENUE, DOT #733822L, GEORGIA SOUTHWESTERN RAILROAD, REF #1449
GAURDRAIL AND GUARDRAIL END ANCHORS AT SITE 1 - (BIN 007767) POPLAR SPRINGS ROAD OVER COWIKEE CREEK; SITE 2 - (BIN 015299) ON FIVE MILE ROAD OVER CHENEYHATCHEE CREEK
INSTALLATION OF GUARDRAIL AND GUARDRAIL END ANCHORS AT 4 SITES; SITE 1: GREY HILL ROAD (BIN 011622). SITE 2: HOPEWILL CHURCH ROAD (BIN 011416). SITE 3: PEACH ORCHARD ROAD (BIN 008044). SITE 4: 6 MILE RUN (TUCKER ROAD) (BIN 009648)
INSTALLATION GUARDRAIL AND GUARDRAIL END ANCHORS AT 2 SITES. SITE 1: ON CR-49 (BIN 005927). SITE 2: ON CR-115 (BIN 007123)
RAILROAD CROSSING IMPROVEMENTS FOR TWO MAST MOUNTED SIGNALS, TWO GATES, SIGNS MARKINGS, LEGENDS AT SOLOMON HILL ROAD (CR-28) AND CSX RAILROAD, DOT #351263G, CSXT RAILROAD, REF #1596
CENTERLINE SCORING ON SR-55 IN BUTLER COUNTY FROM THE CONECUH COUNTY LINE TO THE SOUTH END OF THE BRIDGE OVER THE CSX RAILROAD (BIN 019625)
RESURFACING, TRAFFIC STRIPING, SAFETY IMPROVEMENTS AND ACCESS MANAGEMENT ON SR-21 FROM .291 MILES NORTH OF SUMMERALL GATE ROAD (MP 258.370) TO GEORGE DOUTHIT DRIVE (MP 265.252)
RAILROAD CROSSING IMPROVEMENTS, INCLUDING REPLACING INCANDESCENT LIGHTS WITH LIGHT EMITTING DIODES (LEDS), SIGNS, MARKINGS, AND LEGENDS AT F STREET AND NORFOLK SOUTHERN RAILROAD, DOT #727086X, REF #1588.
RAILROAD CROSSING IMPROVEMENTS FOR THE INSTALLATION OF SIGNS, MARKINGS, LEGENDS, LIGHT EMITTING DIODES (LEDS) ON W 4TH STREET AT NS RAILROAD, DOT NO. 727088L REF. 1587.
RESURFACING, TRAFFIC STRIPE, GUARDRAIL ON SR-50 FROM AVE. A SE (MP 42.925) TO CR-208 (MP 51.923)
RAILROAD CROSSING IMPROVEMENTS FOR THE INSTALLATION OF TWO (2) STANDARD MAST MOUNTED SIGNALS WITH LIGHTS AND BELLS, TWO (2) GATES, AND UPDATE SIGNS, MARKINGS, AND LEGENDS ON GUY STREET AT DOT NO.352314T, CSXT RAILROAD, REF. NO 1565
RAILROAD CROSSING IMPROVEMENTS FOR THE INSTALLATION OF TWO (2) STANDARD MAST MOUNTED SIGNALS WITH LIGHTS AND BELLS, TWO (2) GATES, SIGNS, MARKINGS, LEGENDS ON BEN WELLS ROAD AT DOT NO. 352346Y, CSXT RAILROAD, REF NO 1566
RAILROAD CROSSING IMPROVEMENTS FOR THE INSTALLATION OF TWO (2) STANDARD MAST MOUNTED SIGNALS WITH LIGHTS AND BELLS, TWO (2) GATES, UPDATE STRIPING, MARKINGS, AND LEGENDS ON MAIN STREET AT DOT NO. 352349U, CSXT RAILROAD, REF NO. 1567
RAILROAD CROSSING IMPROVEMENTS FOR THE INSTALLATION OF TWO (2) STANDARD MAST MOUNTED SIGNALS WITH LIGHTS AND BELLS, TWO (2) GATES, UPDATE STOP BARS ON MAIN STREET AT DOT NO. 727438B, NS RAILROAD. REF. NO 1584
INSTALLATION OF GUARDRAIL AND GUARDRAIL END ANCHORS; SITE 1: KINCHEON ROAD FROM MARTIN LUTHER KING STREET TO .09 MILES WEST (MP 7.22). SITE 2: MARTIN LUTHER KING STREET FROM KINCHEON ROAD TO .18 MILES NORTH (MP 1.831)
RESURFACING AND SAFETY IMPROVEMENTS (2' SAFETY WIDENING, SCORING AND GUARDRAIL IMPROVEMENTS) ON CR-49 FROM CR-24 TO CLANTON CITY LIMITS
MODIFY THE VERTICAL ALIGNMENT ON SR-27 .34 MILES NORTH OF THE SHELLFIELD ROAD INTERSECTION
RESURFACING AND 2' SAFETY WIDENING ON SR-27 FROM GENEVA COUNTY LINE TO THE BEGINNING OF 4 LANE SECTION
REDUCED CONFLICT INTERSECTION (U-TURN) MODIFICATIONS AT SR-20 AND GARGIS LANE (CR-77)
REDUCED CONFLICT INTERSECTION (U-TURN) MODIFICATIONS AT SR-20 AND GARGIS LANE (CR-77)
INTERSECTION RE-ALIGNMENT AND MODIFICATIONS OF SR-3 (US-31) AND SR-12 (US-84) FROM MP 92.7 TO MP 93.1
MILL, RESURFACE, AND SAFETY INTERSECTION IMPROVEMENTS ON SR-55 FROM SR-12 IN RIVER FALLS TO .270 MILES NORTH OF RECREATION ROAD IN RED LEVEL (MP 38.081) THREE NOTCH RAILWAY
RAILROAD CROSSING IMPROVEMENTS FOR THE INSTALLATION OF SIGNS, MARKINGS, AND MEDIAN STRIPING ON CR-715 AT DOT NO. 352187U IN CULLMAN, CSX RAILROAD. REF. NO. 1561
RESURFACE, MILL, AND ADD 2' SAFETY WIDENING ON SR-51 FROM SR-53 (US-231) TO THE BARBOUR COUNTY LINE
MICRO MILL, ADD 2' SAFETY WIDENING, AND RESURFACE SR-123 FROM ROY PARKER ROAD TO INTERSECTION OF SR-51
ACCESS MANAGEMENT IN LEVEL PLAINS ALONG SR-12 (US-84) FROM CR-709 TO CR-1
ACCESS MANAGEMENT IN LEVEL PLAINS ALONG SR-12 (US-84) FROM CR-709 TO CR-1
INSTALLATION OF GUARDRAIL AND GUARDRAIL END ANCHORS AT 3 SITES. SITE 1 - (BIN 012726) ON CR-2 OVER CLAYBANK CREEK; SITE 2 - (BIN 012995) ON CR-19 OVER JUDY CREEK; SITE 3 - (BIN 008291) ON CR-19 OVER LITTLE JUDY CREEK
RR XING IMPRV FOR TWO(2) MAST MOUNTED SIGNALS, TWO(2) GATES, SIGNS, MARKINGS, LEGENDS, INSTALL 80' OF DELINEATORS ALONG THE CENTERLINE OF RR XINGS, RECONSTRUCT SIDEWALK ON EASTERN SIDE ON LAPSLEY STREET AT DOT#727617S IN SELMA, NS RAILROAD, REF#1594.
RAILROAD XING IMPRV FOR INSTALLING NEW MAST MOUNTED FLASHING LIGHTS, INCLUDE SIGNAL HEAD, INSTALL XING GATES, INSTALL 2 ADVANCE XING SIGNS, INSTALL RR MARKINGS, RAISED CONCRETE MEDIANS, RECONSTRUCT SIDEWALK AT BROAD ST, DOT#727614W, NS RR, REF#1597
OPERATIONAL IMPROVEMENTS ON SR-35 FROM SARAH DEWYER STREET TO PRESTWOOD DRIVE, INCLUDING INTERSECTION IMPROVEMENTS AT JORDAN ROAD / AIRPORT ROAD, AT THE I-59 RAMPS, AND AT BRIARWOOD AVENUE
ACCESS MANAGEMENT ALONG SR-6 (US-82) IN PRATTVILLE FROM BASS PRO BOULEVARD TO THE I-65 SB EXIT RAMP
RR XING IMPRV FOR THE INSTALLATION OF FLASHING LIGHTS ASSEMBLIES WITH WARNING BELLS, XING GATES, ADVANCE XING SIGN AND W14-3, PAVEMENT MARKINGS, EXTEND CENTERLINES, WIDEN THE ROADWAY ON PECAN GROVE RD. AT DOT NO. 353053Y, CSX RR. REF. NO. 1599
MICROSURFACE ON SR-14 FROM SR-63 TO SR-229 AND SIGN UPGRADE AT THE CR-155 (CHEROKEE TRAIL) INTERSECTION
RESURFACING AND SIGNAL BACKPLATES ON SR-21 FROM ALABAMA STATE LINE TO SUNSET DR
RESURFACING AND SIGNAL BACKPLATES ON SR-3 (US-31) FROM OLD HIGHWAY 31 (MP 64.774) TO THE SOUTH END OF THE BURNT CORN CREEK BRIDGE IN BREWTON
INTERSECTION IMPROVEMENTS (R-CUT) ON SR-25 (US-411) AT APPALACHIAN HIGHWAY NEAR TURKEY TOWN
MICRO-MILLING, SCRUB SEAL, RESURFACING AND 2' SAFETY WIDENING ON SR-74 (US-278) IN HOKES BLUFF FROM ALFORD BEND ROAD (MP 141.190) TO THE CALHOUN COUNTY LINE (MP 148.560)
ACCESS MANAGEMENT ON SR-1(US-431) FROM COX GAP ROAD TO THE MARSHALL COUNTY LINE.
RESURFACE, MILL, AND ADD 2' SAFETY WIDENING ON SR-52 FROM LINE STREET IN SAMSON TO SR-196 IN GENEVA
CONSTRUCTING A ROUNDABOUT AT SR-52, SR-153 AND CR-5
CONSTRUCTING A ROUNDABOUT AT SR-52, SR-153 AND CR-5
RESURFACE, PLANE, AND 2' SAFETY WIDENING ON SR-27 FROM SR-1 (US-431) TO SR-10 IN ABBEVILLE
RESURFACING, MILLING AND 2' SAFETY WIDENING ON SR-605 FROM FORTNER STREET TO SR-53 (US-231)
RR XING IMPRV, UPGRADE FLASHING LIGHTS TO EMITTING DIODES (LEDS), ADD TWO (2) GATES, UPDATE ADVANCED WARNING SIGNS, MARKINGS, AND LEGENDS AT HOUSTON ST. AND NS;REF. # 1447; DOT #731705J
RAILROAD CROSSING IMPROVEMENT FOR THE INSTALLATION OF SIGNS, MARKINGS, LEGENDS ON CEDAR HILL ROAD AT DOT NO. 731706R IN JACKSON, NORFOLK SOUTHERN RAILWAY, REF. NO. 1572
RAILROAD CROSSING IMPROVEMENTS FOR THE INSTALLATION OF TWO (2) STANDARD MAST MOUNT SIGNALS, TWO (2) GATES, AND SIGNS, MARKINGS, AND LEGENDS ON KYLE STREET AT DOT NO. 731702N IN JACKSON, NORFOLK SOUTHERN RAILWAY, REF. NO. 1571
INSTALLATION OF GUARDRAIL AND GUARDRAIL END ANCHORS AT 3 SITES. SITE 1: ON CR-48 OVER STRINGER CREEK (BIN 1117) , SITE 2: ON CR-30 OVER A TRIBUTARY TO NORTH SAUTY CREEK (BIN 5893) , SITE 3: ON CR-30 OVER A TRIBUTARY TO NORTH SAUTY CREEK (BIN 10024)
RR XING HAZARD ELIMINATION IMPROVEMENTS FOR THE INSTALLATION OF RAISED MEDIAN SEPARATORS WITH DELINEATORS AND STRIPING ON THE APPROACHES AT DOT NO 728006F ON 59TH STREET SOUTH IN BIRMINGHAM, NSRR REF NO 2208HE
RAILROAD CROSSING IMPROVEMENTS, INCLUDING SIGNS, MARKINGS, LEGENDS, AND UPDATE STOP BAR AT SHANNON OXMOOR ROAD (CR-95) AND CSX RAILROAD, DOT #352566U, REF #1563
RAILROAD CROSSING IMPROVEMENTS, INCLUDING REPLACING INCANDESCENT LIGHTS WITH LIGHT EMITTING DIODES (LEDS), UPDATING SIGNS, MARKINGS, AND LEGENDS AT 15TH STREET SOUTH AND NORFOLK SOUTHERN RAILROAD, DOT #725391B, NS, REF #1581
REPLACING INCANDESCENT LIGHTS WITH LIGHT EMITTING DIODES (LEDS), SIGNS, MARKINGS AND LEGENDS AT 32ND STREET AND NORFOLK SOUTHERN RAILROAD, DOT #725393P, NS, REF #1582
RAILROAD CROSSING IMPROVEMENTS, INCLUDING REPLACING INCANDESCENT LIGHTS WITH LIGHT EMITTING DIODES (LEDS), SIGNS, MARKINGS, AND LEGENDS AT 18TH STREET AND NORFOLK SOUTHERN RAILWAY, DOT #725398Y, REF #1583.
RR XING IMPRV FOR SIGNS, MARKING, LEGENDS, AND LIGHT EMITTING DIODES (LED) AND ADDITIONAL SIGNAL HEAD LIGHTS ON 50TH ST. SOUTH AT NS RAILROAD,.DOT CROSSING NO. 728012J REF NO. 1579.
RR XING IMPRV FOR THE INSTALLATION OF SIGNS, MARKING, LEGENDS, REPLACE INCANDESCENT LIGHTS WITH LIGHT EMITTING DIODES (LEDS) ON 17TH WAY SOUTHWEST AT NORFOLK SOUTHERN RAILROAD ,DOT NO.728034J, REF. NO.1580
SURFACE TREATMENT AND REPLACEMENT OF STEEL BLOCKOUTS ON SR-269 FROM THE BIRMINGHAM CITY LIMITS TO OLD MULGA LOOP ROAD
RESURFACING AND 2' SAFETY WIDENING ON SR-17 FROM OLD REFORM ROAD TO CR-9
RESURFACING AND 2' SAFETY WIDENING ON SR-18 FROM THE MISSISSIPPI STATE LINE TO 0.25 MILE EAST OF CR-31 (MP 4.417)
REDUCED CONFLICT INTERSECTION (U-TURN) MODIFICATIONS AT SR-13 (US-43) AND SR-64
INTERSECTION IMPROVEMENTS ON COLUMBUS PARKWAY AT 4TH, 6TH AND 7TH STREETS
RAILROAD CROSSING IMPROVEMENTS FOR REPLACE EXISTING INCANDESCENT LIGHTS WITH LIGHT EMITTING DIODES (LEDS); REPLACE MISSING SIGNAL HOOD, SIGNS, MARKINGS, AND LEGENDS AT WEBSTER ROAD (CR-53) AND CSXT RAILROAD , DOT #831203Y, CSXT RAILROAD, REF #1595
ACCESS MANAGEMENT ALONG SR-1 (US-431) FROM CR-249 TO CR-179
SAFETY IMPROVEMENTS (LANE WIDENING) ON CR-188 FROM THE MACON COUNTY LINE TO SR-14
INTERSECTION MODIFICATION ON EAST LIMESTONE ROAD (CR-109) AND CAPSHAW ROAD (CR-36) TO INSTALL A ROUNDABOUT
INTERSECTION MODIFICATION ON EAST LIMESTONE ROAD (CR-109) AND CAPSHAW ROAD (CR-36) TO INSTALL A ROUNDABOUT
RAILROAD CROSSING IMPROVEMENTS, UPDATE SIGNS, MARKINGS AND LEGENDS (STOP BAR) AT BETHEL ROAD AND CSX RAILROAD, REF #1555, DOT #352055J
RAILROAD CROSSING IMPROVEMENTS, INCLUDING TWO STANDARD MAST MOUNTED SIGNALS AND TWO BELLS, TWO GATES, SIGNS, MARKINGS AND LEGENDS (STOP BARS) AT THACH ROAD AND CSX RAILROAD, DOT #352056R, CSXT, REF #1556
RAILROAD CROSSING IMPROVEMENTS, SIGNS, MARKINGS, LEGENDS (STOP BAR) AT UPPER ELKTON ROAD AND CSX RAILROAD, DOT #352060F, CSXT, REF #1557
RAILROAD CROSSING IMPROVEMENTS FOR THE INSTALLATION OF TWO (2) GATES, GCP'S, SIGNS, MARKINGS, LEGENDS ON MCCLELLAN ST. AT DOT NO. 352068K, CSX RAILROAD. REF NO. 1558
ACCESS MANAGEMENT ALONG SR-2(US-72) FROM 0.25 MILES WEST OF SHIELDS ROAD TO 0.75 MILES EAST OF BROCK ROAD, INCLUDING SIGNAL MODIFICATIONS AT SHIELDS ROAD, AND "R-CUT" IMPROVEMENTS AT JORDAN RD, DUG HILL RD, AND BROCK RD.
RR XING IMPRV FOR INSTALLATION OF SIGNS,MARKINGS,LEGENDS,INSTALL TWO(2)GATES,AND REMOVE EXISTING MEDIAN FLASHING LIGHT SIGNALS;INSTALL(2)NEW MAST MOUNTED FLASHING LIGHT UNITS ON MOORES MILL ROAD NE AT DOT NO.731795K IN MADISON, NS RR, REF. NO 1574
RESURFACING AND STEEL BLOCKOUT REPLACEMENT ON SR-8 (US-80) FROM LEE AVE. TO THE HALE COUNTY LINE
RESURFACING AND 1' SAFETY WIDENING ON SR-187 FROM SR-17 (0.20) TO CR-29 (MP 4.278)
ADD LEFT TURN BYPASS LANES ON SR-17 (US-45) AT PINE STREET AND ARDEN ROAD IN MOBILE COUNTY AND ON SR-57 (US-45) AT CR-1 (MAIN STREET) IN WASHINGTON COUNTY
RESURFACING AND SIGNAL BACKPLATES ON SR-16 (US-90) FROM EAST ABUTMENT OF FOWL RIVER BRIDGE TO HALLS MILL CREEK BRIDGE
RESURFACING AND SIGNAL BACKPLATES ON SR-217 FROM SR-17 (US-45) TO LAKEVIEW RIDGE LANE
SAFETY IMPROVEMENTS (2' SAFETY WIDENING, RUMBLE STRIPS AND PAVEMENT MARKERS) ON BELLINGRATH ROAD FROM HALF MILE ROAD / LAURENDINE ROAD TO THE MOBILE CITY LIMITS
INSTALLATION OF ROUNDABOUTS AT THE SR-126/SR-8 (US-80) INTERSECTION AND AT THE SR-8 (US-80)/MARLER ROAD INTERSECTION
INTERSECTION MODIFICATIONS WITH SIGNAL UPGRADES ALONG SR-9 (US-231)FROM TWAIN CURVE TO LAGOON BUSINESS LOOP
RAILROAD CROSSING IMPROVEMENTS, SIGNS, MARKINGS AND LEGENDS AT CEDAR LAKE ROAD SOUTHEAST AND CSX RAILROAD, DOT #352098C, CSXT, REF #1559
RR XING IMPRV FOR THE INSTALLATION OF TWO(2) STANDARD MAST MOUNTED SIGNALS WITH TWO(2) GATES, TWO(2) BELLS, GRADE CROSSING PREDICTORS, SIGNS, MARKINGS, AND LEGENDS ON COLLEGE STREET AT DOT #352108F IN HARTSELLE, CSX RAILROAD REF. NO.1560.
ACCESS MANAGEMENT ON SR-10 (US-231) FROM SR-87 TO INDUSTRIAL PARK BLVD
RESURFACING AND 2' SAFETY WIDENING ON SR-223 FROM SR-15 (US-29) TO THE BULLOCK COUNTY LINE
SAFETY IMPROVEMENTS (SHOULDER WIDENING, FLATTEN SLOPES AND STRIPING) ON CR-7707 FROM CR-7718 TO CR-7708
ACCESS MANAGEMENT ON SR-10 (US-231) FROM SR-87 TO INDUSTRIAL PARK BLVD
RESURFACING, TRAFFIC STRIPING, GUARDRAIL, GUARDRAIL END ANCHORS, AND CROSS SLOPE CORRECTION ON SR-48 FROM 0.280 MILES WEST OF CR-531 (MP 24.961) TO THE GEORGIA STATE LINE (MP 34.321)
INTERSECTION IMPROVEMENTS AT SR-1 (US-431) AND SR-165 INCLUDING ADDITIONAL NORTHBOUND RIGHT TURN LANE, SOUTHBOUND LEFT TURN LANE, AND NORTHBOUND ACCELERATION LANE ALONG SR-1 (US-431) AND ADDITIONAL LEFT TURN LANE ALONG SR-165 TO SEALE ROAD
MODIFICATIONS AT THE SR-1(US-431)/SR-26 INTERSECTION INCLUDING OFFSET SB RIGHT TURN LANE AND ADDING A NB ACCELERATION LANE
RAILROAD CROSSING IMPROVEMENTS, INCLUDING TWO STANDARD MAST MOUNTED SIGNALS WITH LIGHTS AND BELLS, TWO GATES, UPDATE SIGNS, MARKINGS, AND LEGENDS AT CR-11 AND CSX RAILROAD, DOT #639533E, CSXT, REF #1564
INTERSECTION IMPROVEMENTS ON SR-34 AT CROPWELL DRIVE AND HARDWICK ROAD (CR-45), INCLUDING ROUNDABOUT CONSTRUCTION IN PELL CITY
STATEWIDE RAIL CROSSING TRAFFIC COUNT DATA COLLECTION AT RAIL CROSSING LOCATIONS
RAILROAD PRELIMINARY REVIEWS AND ASSESSMENTS PRIOR TO AUTHORIZATION FOR MAINTENANCE AND CONSTRUCTION PROJECTS FOR FY 2024 THRU FY 2027
STATEWIDE PILOT PROJECT FOR WRONG WAY ENTRY PREVENTION AT VARIOUS INTERSTATE LOCATIONS
RAILROAD CROSSING IMPROVEMENTS FOR THE INSTALLATION OF SIGNS ON 3RD STREET AT DOT NO. 726150R, NS RAILROAD. REF. NO. 1569.
GUARDRAIL AND GUARDRAIL END ANCHORS ON CR-2 AT 4 CULVERT SITES: SITE 1: OVER UNNAMED BR 300' E OF MCCOY RD; SITE 2: OVER UNNAMED BR 900' W OF HULL RD; SITE 3: OVER UNNAMED BR .60 MILES WEST OF I-20/59; SITE 4: OVER UNNAMED BR .26 MILES W OF W END CRT
RESURFACING, TRAFFIC STRIPE, GUARDRAIL, GUARDRAIL END ANCHORS, SAFETY CROSS SLOPE CORRECTION, AND INTERSECTION IMPROVEMENTS ON SR-34 FROM THE ST. CLAIR COUNTY LINE (MP 4.672) TO SR-77 (MP 13.125)
RAILROAD CROSSING IMPROVEMENTS, INCLUDING TWO STANDARD MAST MOUNTED SIGNALS WITH LIGHTS AND BELLS, TWO GATES, SIGNS, MARKINGS AND LEGENDS AT ROOSEVELT AVENUE AND CSX RAILROAD, DOT #639320U, CSXT, REF #1562
RAILROAD CROSSING IMPROVEMENTS: TWO STANDARD MAST MOUNT SIGNALS, ADD 2 BELLS, ADD SIGNAL LIGHTS FACING GENE E. STEWART BLVD,TWO GATES, SIGNS,MARKINGS,AND LEGENDS AT SYLACAUGA-FAYETTEVILLE RD AND EASTERN ALABAMA RAILROAD,DOT #353781J,REF #1575
RAILROAD CROSSING IMPROVEMENTS: TWO STANDARD MAST MOUNT SIGNALS, ADD 2 BELLS, ADD SIGNAL LIGHTS FACING GENE E. STEWART BLVD,TWO GATES, SIGNS,MARKINGS,AND LEGENDS AT SYLACAUGA-FAYETTEVILLE RD AND EASTERN ALABAMA RAILROAD,DOT #353781J,REF #1575
TWO STANDARD CANTILEVERED SIGNALS WITH LIGHT EMITTING DIODES (LEDS) AND BELLS, UPDATE SIGNS, MARKINGS, AND LEGENDS ON SYLACAUGA-FAYETTEVILLE ROAD AT DOT # 353783X IN TALLADEGA, EASTERN ALABAMA RAILROAD, REF #1576.
TWO STANDARD CANTILEVERED SIGNALS WITH LIGHT EMITTING DIODES (LEDS) AND BELLS, UPDATE SIGNS, MARKINGS, AND LEGENDS ON SYLACAUGA-FAYETTEVILLE ROAD AT DOT # 353783X IN TALLADEGA, EASTERN ALABAMA RAILROAD, REF #1576.
RAILROAD CROSSING IMPROVEMENTS FOR SIGNS, MARKINGS, AND LEGENDS AT MCKINLEY STREET AND NORFOLK SOUTHERN RAILROAD, DOT #925304X, NS RAILROAD, REF #1589
RESURFACING, TRAFFIC STRIPING, 2 FT SAFETY WIDENING, GUARDRAIL, GUARDRAIL END ANCHORS, AND BRIDGE GUARDRAIL RETROFIT ON SR-49 FROM CR-57 (MP 39.727) TO SR-22 (MP 47.391)
INSTALLATION OF GUARDRAIL AND GUARDRAIL END ANCHORS AT SITE 1: 8TH AVENUE FROM HILLABEE STREET TO 3RD STREET. SITE 2: HILLABEE STREET FROM TALLAPOOSA STREET OVERPASS TO COLEY STREET
RESURFACING AND SAFETY IMPROVEMENTS (2' SAFETY WIDENING AND SCORING) ON CR-34 FROM RIDGE ROAD TO SR-49
SAFETY IMPROVEMENT INSTALLATION OF NEW LIGHTING AT I-59/I-20 ON-RAMPS AND OFF-RAMPS AT EXIT 79 (SR-7/US-11 INTERSECTION)
RAILROAD CROSSING IMPROVEMENTS FOR THE INSTALLATION OF TWO (2) MAST MOUNTED SIGNALS WITH LIGHTS AND BELLS, TWO (2) GATES, SIGNS, MARKINGS, AND LEGENDS ON HARPER ROAD, ABS RAILROAD, DOT NO. 306323U REF NO. 1568
RAILROAD CROSSING IMPROVEMENTS FOR THE INSTALLATION OF TWO (2) SIGNS AND REPLACE TWO (2) SIGNS ON HAGLER COALING ROAD AT DOT NO. 725428N, NS RAILROAD. REF. NO. 1570
RESURFACING AND 2' SAFETY WIDENING ON SR-216 FROM SR-215 TO LOCK 17 ROAD
RESURFACING, 2' SAFETY WIDENING, AND CULVERT EXTENSION ON SR-162 FROM .25 MILE WEST OF DIXON CREEK TO SR-28
LEVEL OF EFFORT FOR TRANSPORTATION ALTERNATIVES PROGRAM FY 2024
SIDEWALK IMPROVEMENTS ALONG SOUTH WASHINGTON STREET, NORTH TAYLOR STREET AND PINE STREET IN THE TOWN OF AUTAUGAVILLE
SIDEWALK IMPROVEMENTS ALONG OLD RIDGE ROAD IN THE CITY OF PRATTVILLE
CORRECTING ADA DEFICIENCIES IN PEDESTRIAN PATHS AND SIDEWALKS IN THE DOWNTOWN CITY OF PRATTVILLE
STREETSCAPE IMROVEMENTS ON SOUTH COURT ST FROM TICHNOR AVE TO W 4TH STREET IN PRATTVILLE
STREETSCAPE IMROVEMENTS ON SOUTH COURT ST FROM TICHNOR AVE TO W 4TH STREET IN PRATTVILLE
SIDEWALKS ON SR-180 (CANAL ROAD) AND COMMERCIAL AVENUE FROM SPINNAKER WAY TO GULF BAY ROAD
SIDEWALKS ALONG EAST SILVERHILL AVENUE, BUCK ROAD, WILTERS STREET, COLLEGE AVENUE AND OLD SPANISH TRAIL
SIDEWALK ON JIMMY FAULKNER DRIVE FROM TANAGER LANE TO THE MIDDLE SCHOOL IN THE CITY OF SPANISH FORT
SIDEWALKS ON BLUE ISLAND AVENUE AND FAIRWOOD BOULEVARD IN THE CITY OF FAIRHOPE
SIDEWALK IMPROVEMENTS ALONG NE 7TH ST. FROM EAST SHRIVER AVE. TO TOWN LIMITS, ALONG WEST WASINGTON AVE. FROM NW 4TH ST. TO NW 1ST ST. AND ALONG NW 4TH ST. FROM WEST SHRIVER AVE. TO WEST JACKSON AVE. IN THE TOWN OF SUMMERDALE
SIDEWALK IMPROVEMENTS ALONG E 1ST STREET FROM E 16TH AVENUE TO E 19TH AVENUE IN THE CITY OF GULF SHORES
MULTI-USE TRAIL ALONG THE NORTH SIDE OF SWANN BRIDGE ROAD THAT WILL EXTEND APPROXIMATELY 1,700 FT. W AND INCLUDE A CUL-DE-SAC, GRAVEL PARKING LOT AND PEDESTRIAN BRIDGE IN BLOUNT COUNTY
MULTI-USE TRAIL ALONG THE NORTH SIDE OF SWANN BRIDGE ROAD THAT WILL EXTEND APPROXIMATELY 1,700 FT. W AND INCLUDE A CUL-DE-SAC, GRAVEL PARKING LOT AND PEDESTRIAN BRIDGE IN BLOUNT COUNTY
MIKE TUCKER PARK TRAILHEAD IMPROVEMENTS AT THE CHIEF LADIGA TRAIL IN THE CITY OF ANNISTON
PEDESTRIAN BRIDGE OVER GOOSE POND CREEK AT OLLIE PARK EAST OF SR-3 (US-31 / 7TH STREET NORTH) IN THE CITY OF CLANTON
PEDESTRIAN BRIDGE OVER GOOSE POND CREEK AT OLLIE PARK EAST OF SR-3 (US-31 / 7TH STREET NORTH) IN THE CITY OF CLANTON
ADA SIDEWALKS ALONG MAYTON DRIVE, CARL E. NEWSOME AND COLLEGE AVENUE IN THE CITY OF JACKSON
ADA SIDEWALKS ALONG MAYTON DRIVE, CARL E. NEWSOME AND COLLEGE AVENUE IN THE CITY OF JACKSON
SIDEWALK ALONG DALEVILLE AVENUE IN ENTERPRISE
SIDEWALK ALONG DALEVILLE AVENUE IN ENTERPRISE
SIDEWALK ON CLAXTON AVE. FROM TROY RD. TO DAVIS ST., CONNECTING TO EXISTING SIDEWALKS ON W. COLLIER ST., BUFORD ST. AND COURT AVE. WITH SIDEWALK REPLACEMENT IN THE CITY OF ELBA
SIDEWALK ON CLAXTON AVE. FROM TROY RD. TO DAVIS ST., CONNECTING TO EXISTING SIDEWALKS ON W. COLLIER ST., BUFORD ST. AND COURT AVE. WITH SIDEWALK REPLACEMENT IN THE CITY OF ELBA
DOWNTOWN SIDEWALK IMPROVEMENTS ALONG 9TH STREET/JOSH TURNER DRIVE FROM 5TH AVENUE TO BEGONIA STREET IN THE CITY OF FLORALA
SIDEWALKS ALONG CALVERT ROAD AND HATHCOCK ROAD IN THE TOWN OF GOOD HOPE
SIDEWALK IMPROVEMENTS ALONG BENNETT STREET, HOWELL STREET, WILEY AVENUE, 3RD STREET AND BROOKLINE IN THE CITY OF MIDLAND CITY
SIDEWALK IMPROVEMENTS ALONG CR-59, ALONG KIMBERLY ST., ALONG HALIE DR., ALONG COTTON DR., ALONG 2ND ST. AND MISCELLANEOUS SIDEWALK REPAIRS TO MEET ADA COMPLIANCE ALONG CR-59 AND KELLY AVENUE IN THE CITY OF MIDLAND CITY
STREETSCAPE IMPROVEMENTS ALONG ALABAMA AVENUE FROM BROAD STREET TO GREEN STREET - PHASE I IN THE CITY OF SELMA
STREETSCAPE IMPROVEMENTS ALONG ALABAMA AVENUE FROM BROAD STREET TO GREEN STREET - PHASE I IN THE CITY OF SELMA
SIDEWALKS AND ADA CURB RAMPS ALONG BOTH SIDES OF GAULT AVENUE (SR-35/US-11) FROM THIRD STREET TO EIGHTH STREET NORTH
SIDEWALK ALONG SR 227 FROM GERALDINE HIGH SCHOOL TO SR 75 IN THE TOWN OF GERALDINE
SIDEWALK IMPROVEMENTS ALONG PARADES WAY, GREEN ROAD AND MARTIN ROAD IN POARCH BAND OF CREEK INDIAN RESERVATION
SIDEWALK IMPROVEMENTS ALONG BELLEVILLE AVE. FROM TIGER DR. TO THE YMCA AND FROM N. ST. TO PEAVY ST., ALONG PEAVY ST. FROM BELLEVILLE AVE. TO ESCAMBIA AVE., AND ALONG ESCAMBIA AVE. FROM N. ST. TO ROTCH BLVD. IN THE CITY OF BREWTON
SIDEWALK IMPROVEMENTS ALONG KINZIE LANE IN THE CITY OF RAINBOW CITY
ADA COMPLIANT PEDESTRIAN BRIDGE OVER LITTLE COVE CREEK THAT WILL CONNECT HOLLINGSWORTH PARK TO WILSON PARK IN THE CITY OF GLENCOE
DOWNTOWN STREETSCAPE IMPROVEMENTS ALONG CHESTNUT STREET FROM 7TH STREET TO 6TH STREET AND ALONG 6TH STREET FROM CHESTNUT STREET TO BROAD STREET - PHASE II IN THE CITY OF GADSDEN
DOWNTOWN STREETSCAPE IMPROVEMENTS ALONG CHESTNUT STREET FROM 7TH STREET TO 6TH STREET AND ALONG 6TH STREET FROM CHESTNUT STREET TO BROAD STREET - PHASE II IN THE CITY OF GADSDEN
SIDEWALK, CURB RAMPS AND CROSSWALKS ALONG THE SOUTH SIDE OF SCHOOL DRIVE FROM DAY STAR LANE TO SR-77 AND ALONG THE WEST SIDE OF SR-77 FROM SCHOOL DRIVE TO GLENN AVENUE IN THE CITY OF SOUTHSIDE
DOWNTOWN SIDEWALK IMPROVEMENTS ALONG 1ST AVENUE SW, 1ST STREET SE AND 1ST AVENUE SE IN THE CITY OF FAYETTE
SIDEWALK IMPROVEMENTS ALONG NORTH SIDE OF ALABAMA AVENUE, EAST SIDE OF 9TH STREET, SOUTH SIDE OF BROADWAY AVENUE AND EAST SIDE OF JIM B. THOMAS AVENUE IN THE CITY OF BRIDGEPORT
SIDEWALK ALONG THE EAST SIDE OF SOUTH HOUSTON STREET FROM CALDWELL PARK TO THE SCOTTSBORO RECREATION-COMMUNITY CENTER IN THE CITY OF SCOTTSBORO
SIDEWALK ALONG THE EAST SIDE OF SOUTH HOUSTON STREET FROM CALDWELL PARK TO THE SCOTTSBORO RECREATION-COMMUNITY CENTER IN THE CITY OF SCOTTSBORO
DOWNTOWN STREETSCAPE IMPROVEMENTS ALONG SR-4 (US-78 / PARKWAY DRIVE) AND SR-25 (US-411 / 9TH STREET) IN LEEDS
SIDEWALKS AND ADA IMPROVMEMENTS ON SUNHILL ROAD FROM CENTER POINT COMMUNITY CENTER TO 5TH PLACE; AND ON 5TH PLACE FROM CENTER POINT COMMUNITY TO ERWIN INTERMEDIATE SCHOOL
SIDEWALK ALONG MONTCLAIR ROAD IN THE CITY OF MOUNTAIN BROOK
TRAIL ALONG CENTRAL AVENUE /GRIFFIN CREEK FROM 28TH AVENUE SOUTH TO 27TH AVENUE SOUTH IN THE CITY OF HOMEWOOD
SIDEWALK IMPROVEMENTS ALONG SR-17 NORTH, SR-18 WEST, BUTLER CIRCLE AND 5TH STREET SW IN THE CITY OF VERNON
SHARED USE PATH ALONG HELTON DRIVE AND SHARED USE MARKINGS ALONG BRADSHAW DRIVE IN FLORENCE
SIDEWALK ALONG CR-63 (LOCK SIX ROAD) IN THE TOWN OF KILLEN
ADA SIDEWALK IMPROVEMENTS ALONG MAIN STREET - PHASE I IN THE TOWN OF WATERLOO
STREETSCAPE IMPROVEMENTS ALONG UPPER FORT HAMPTON ROAD AND HIGH SCHOOL ROAD IN THE TOWN OF ELKMONT
SIDEWALK IMPROVEMENTS ON PRATT AVENUE IN THE CITY OF HUNTSVILLE
SIDEWALKS ALONG MILLER BRANCH FROM WALL TRIANA HIGHWAY TO BEADLE LANE, THEN ALONG BEADLE LANE TO SWANCOTT ROAD; MILLER BRANCH GREENWAY PHASE 1 IN THE CITY OF HUNTSVILLE
RAILROAD BRANCH GREENWAY MULTI-USE TRAIL ALONG AN ABANDONED RAILROAD CORRIDOR FROM THE FLINT RIVER TO SMOKEY HILLS COURT IN MADISON COUNTY
SIDEWALKS ALONG MILLER BRANCH FROM WALL TRIANA HIGHWAY TO BEADLE LANE, THEN ALONG BEADLE LANE TO SWANCOTT ROAD; MILLER BRANCH GREENWAY PHASE 1 IN THE CITY OF HUNTSVILLE
DOWNTOWN STREETSCAPE IMPROVEMENTS ALONG E. WASHINGTON STREET, N. MAIN AVENUE AND W. WASHINGTON STREET IN THE CITY OF DEMOPOLIS
DOWNTOWN STREETSCAPE IMPROVEMENTS ALONG E. WASHINGTON STREET, N. MAIN AVENUE AND W. WASHINGTON STREET IN THE CITY OF DEMOPOLIS
SIDEWALKS ALONG SR-44 FROM THE CHEVRON (MP 5.606) CONNECTING TO THE SIDEWALK ALONG THE HOLIDAY INN ENTRY ROAD AND SIDEWALK EXTENSIONS NEAR THE HOLIDAY INN IN THE CITY OF GUIN
DOWNTOWN STREETSCAPE IMPROVEMENTS ALONG SR-69 (NORTH MAIN STREET) FROM FIRST AVENUE NORTHEAST TO 4TH AVENUE NORTHEAST- PHASE II IN ARAB
SIDEWALKS ON DAUPHIN ISLAND PARKWAY BETWEEN THE I-10 INTERCHANGE AND OLD MILITARY ROAD IN MOBILE
SIDEWALKS ALONG EASTERLING STREET FROM W CLARK AVENUE TO GARRISON AVENUE, ON GARRISON AVENUE FROM EASTERLING STREET TO MAGEE STREET, AND ON MAGEE STREET FROM GARRISON AVENUE TO W CLARK AVENUE
IMPROVEMENTS TO THE TAYLOR HARPER HIKING AND BIKING TRAIL ALONG THE SOUTH SIDE OF BIENVILLE BOULEVARD
80 ADA COMPLIANT CURB RAMPS LOCATED TROUGHOUT CHESTERFIELD PLACE, BROWNING PLACE, SUMMERLAKE, HUNTER'S PARK, WOODBERRYFOREST, AUGUSTA PLACE, CHARLANDA ESTATES, BRADSHIRE AND BRADBURY UNIT ONE
78 ADA CURB RAMPS LOCATED TROUGHOUT PECAN POINTE, BROOKLYNS WAY, TORRINGTON PLACE, RAPHAEL COURT, STONE HEDGE, IRONGATE, RACHAEL PLACE AND CARRINGTON PLACE
SIDEWALKS ALONG SABANA STREET, TAVARES DRIVE, AZTEC STREET AND SAN CARLOS DRIVE
THREE MILE CREEK TRAIL EXTENSION STARTING AT THE JAPANESE GARDENS PARKING LOT ON ZEIGLER BOULEVARD AND TRAVEL EAST TO END AT THE FIRST RAILROAD TRAIN TRESTLE BRIDGE IN THE CITY OF MOBILE
SIDEWALK IMPROVEMENTS ALONG NORTH 3RD STREET, WEST STATE STREET, NORTH 4TH STREET AND WEST LEBARON AVENUE IN THE CITY OF CITRONELLE
SIDEWALK IMPROVEMENTS ALONG NORTH 3RD STREET, WEST STATE STREET, NORTH 4TH STREET AND WEST LEBARON AVENUE IN THE CITY OF CITRONELLE
ADA SIDEWALK IMPROVEMENTS ALONG VAUGHN DRIVE W, VAUGHN DRIVE S, CREEK CIRCLE, GLIBERT DRIVE W, JEANETTE DRIVE, AND POWERS ROAD; FY 2024
CITY OF MOBILE - ADA COMPLIANT CURB RAMPS IN DOWNTOWN MOBILE
CITY OF MOBILE - ADA COMPLIANT CURB RAMPS IN DOWNTOWN MOBILE
SIDEWALK IMPROVEMENTS ALONG SR-42 (US-98/MOFFETT ROAD) FROM MCCRARY ROAD TO KENSINGTON PLACE - CITY OF SEMMES
SIDEWALK IMPROVEMENTS ALONG SR-42 (US-98/MOFFETT ROAD) FROM MCCRARY ROAD TO KENSINGTON PLACE - CITY OF SEMMES
SIDEWALK IMPROVEMENTS ALONG SR-13 (US-43/ N.CRAFT HWAY) AT JEFFERSON STREET AND SUTHERLAND DRIVE, AND JACKSON STREET IN THE CITY OF CHICKASAW.
SIDEWALK IMPROVEMENTS ALONG SR-13 (US-43/ N.CRAFT HWAY) AT JEFFERSON STREET AND SUTHERLAND DRIVE, AND JACKSON STREET IN THE CITY OF CHICKASAW.
SIDEWALK IMPROVEMENTS ALONG BECK STREET,BUSH AVENUE,LULA STREET,CROOK STREET,GLENWOOD STREET,CAROLE STREET AND MARENGO STREET IN THE CITY OF MONROEVILLE
SIDEWALK IMPROVEMENTS ALONG DYESS BLVD FROM SR-136 TO BROWN STREET AND EXCEL/FRISCO HWY FROM SHADY ACRES PL (TRAILER CT) TO GRIFFIN ST. IN THE TOWN OF EXCEL
ELTON N. DEAN SR PARK OFF ROAD TRAIL IMPROVEMENTS/MULTI-USE TRAIL PHASE I
ELTON N DEAN SR PARK OFF-ROAD TRAIL IMPROVEMENT/MULTI-USE TRAIL PHASE II
ELTON N. DEAN SR PARK OFF ROAD IMPROVEMENTS/MULTI-USE TRAIL PHASE 1
ELTON N. DEAN SR PARK OFF ROAD TRAIL IMOROVEMENT/MULTI-USE TRAIL PHASE II
DOWNTOWN SIDEWALK IMPROVEMENTS ALONG 3RD AVENUE NW IN THE CITY OF ALICEVILLE
SIDEWALKS ALONG EAST ACADEMY STREET FROM ALPHONSA BYRD DRIVE (N. BRUNDIDGE STREET) TO ELM STREET IN THE CITY OF TROY
SIDEWALK IMPROVEMENTS AT THOMPSON MIDDLE SCHOOL TO THOMPSON HIGH SCHOOL
SIDEWALKS AND ADA CURB RAMPS ALONG ALABAMA STREET FROM ODENVILLE MIDDLE SCHOOL TO ODENVILLE CITY PARK IN THE CITY OF ODENVILLE
DOWNTOWN STREETSCAPE IMPROVEMENTS - PHASE I IN THE CITY OF ASHVILLE
SIDEWALK IMPROVEMENTS ALONG E SOUTH STREET, W LAFAYETTE STREET, AND E LAFAYETTE STREET IN THE CITY OF DADEVILLE
SIDEWALK ALONG CULVER RD. FROM WESTLEE DR TO JOE MALLISHAM PKWY., ALONG JOE MALLISHAM PKWY FROM CULVER RD TO FOSTERS FERRY RD, AND ALONG FOSTERS FERRY RD FROM JOE MALLISHAM PKWY TO AN EXISTING MULTI-USE - PHASE II IN TUSCALOOSA COUNTY
SIDEWALKS ALONG TINGLE TANGLE ROAD FROM THE VANCE MUNICIPAL PARK TO WALLACE CHAPEL ROAD/WIRE ROAD IN THE CITY OF VANCE
DOWNTOWN STREETSCAPE IMPROVEMENTS ALONG 19TH STREET AND SR-69 - PHASE VI IN THE CITY OF JASPER
DOWNTOWN STREETSCAPE IMPROVEMENTS ALONG 19TH STREET AND SR-69 - PHASE VI IN THE CITY OF JASPER
SIDEWALKS ALONG SUMITON CUTOFF RD. FROM THE SUMITON WALKING TRAIL AND JOYCE ST. TO 1ST ST., ALONG 1ST ST. FROM FROM SUMITON CUTOFF RD. TO THE SUMITON ELEM. SCH., ALONG OLD CAMP RD. FROM SUMITON CUTOFF RD. TO MAIN ST. IN THE CITY OF SUMITON
LEVEL OF EFFORT INTERSTATE RESURFACING FY 2024
PAVEMENT PRESERVATION ON I-65 FROM THE SR-3 (US-31) OVERPASS TO 1 MILE SOUTH OF CR-61
RESURFACING I-10 FROM 0.5 MILE WEST OF SR-181 TO SR-59 INCLUDING RAMPS
RESURFACING I-10 FROM EAST OF CR-64 (WILCOX ROAD) TO FLORIDA STATE LINE
RESURFACING I-10 FROM EAST OF CR-64 (WILCOX ROAD) TO FLORIDA STATE LINE
PIPE REHABILITATION AT LOCATIONS ALONG I-65 IN BUTLER AND LOWDNES COUNTIES
PIPE REHABILITATION AT LOCATIONS ALONG I-65 IN BUTLER AND LOWDNES COUNTIES
CONSTRUCT SOLDIER PILE WALL, SHOULDER REPAIR AND GUARDRAIL REPLACEMENT ON I-65 SOUTHBOUND (MP 87.4)
CONSTRUCT SOLDIER PILE WALL, SHOULDER REPAIR AND GUARDRAIL REPLACEMENT ON I-65 SOUTHBOUND (MP 87.4)
PIPE REHABILITATION AND DRAINAGE STRUCTURE CORRECTION ALONG I-65 FROM THE BLOUNT COUNTY LINE TO THE MORGAN COUNTY LINE - PHASE 2
PIPE REHABILITATION AND DRAINAGE STRUCTURE CORRECTION ALONG I-65 FROM THE BLOUNT COUNTY LINE TO SR-69 INTERCHANGE (EXIT 299) - PHASE 2
PIPE REHABILITATION AND DRAINAGE STRUCTURE CORRECTION ALONG I-65 FROM SR-69 INTERCHANGE (EXIT 299) TO SR-157 INTERCHANGE (EXIT 310) - PHASE 2
PIPE REHABILITATION AND DRAINAGE STRUCTURE CORRECTION ALONG I-65 FROM SR-157 INTERCHANGE (EXIT 310) TO THE MORGAN COUNTY LINE - PHASE 2
RESURFACING ON I-65 FROM HURRICANE CREEK (MP 315.665) TO 0.62 MILES SOUTH OF SR-36 (MP 326.850)
RECONSTRUCTION OF THE NORTHBOUND ROADWAY OF I-59 FROM 0.75 MILES NORTH OF THE SR-68 INTERCHANGE (MP 205.600) TO 0.73 MILES SOUTH OF THE SR-35 INTERCHANGE (MP 217.85)
PAVEMENT PRESERVATION ON I-65 FROM THE END OF THE BRIDGES OVER SR-14 TO THE SR-3 (US-31) OVERPASS
RECONSTRUCTION ON I-59 SOUTHBOUND FROM 0.39 MILE SOUTH OF CR-276 (STEPHENS GAP ROAD) TO APPROXIMATELY 0.5 MILES SOUTH OF SR-68 (MP 204.500)
CONCRETE PAVEMENT STRIPING AND REPLACE RAISED PAVEMENT MARKERS ON I-59 FROM 0.60 MILES SOUTH OF ATTALLA NORTH CITY LIMITS TO 0.30 MILES SOUTH OF THE BRIDGE OVER CR-276 (STEPHENS GAP ROAD) (MP 184.00 TO MP 194.345)
CONCRETE PAVEMENT STRIPING AND REPLACE RAISED PAVEMENT MARKERS ON I-59 FROM 0.60 MILES SOUTH OF ATTALLA NORTH CITY LIMITS TO 0.30 MILES SOUTH OF THE BRIDGE OVER CR-276 (STEPHENS GAP ROAD) (MP 184.00 TO MP 194.345)
RESURFACING I-59 FROM THE ST. CLAIR COUNTY LINE TO SR-77
REHABILITATE I-59 FROM .25 MILES SOUTH OF SR-77 TO .78 MILES NORTH OF SR-74 (US-278)
REHABILITATE I-59 FROM .25 MILES SOUTH OF SR-77 TO .78 MILES NORTH OF SR-74 (US-278)
RESURFACING ON I-59 FROM SR-14 (MP 41.000) TO CR-211 (MP 46.989)
RESURFACING ON I-59 FROM THE SUMTER COUNTY LINE TO .7 MILE NE OF CR-20
RESURFACING I-59 FROM CR-211 TO THE TUSCALOOSA COUNTY LINE
RESURFACING ON I-59 FROM .7 MILE NE OF CR-20 (MP 33.400) TO SR-14 (MP 41.00)
RESURFACING ON I-59 FROM .7 MILE NE OF CR-20 (MP 33.400) TO SR-14 (MP 41.00)
SIGN REHABILITATION ALONG I-59 FROM SUMTER COUNTY LINE TO JEFFERSON COUNTY LINE AND ALONG I-359 FROM SR-7/US-11(SKYLAND BOULEVARD) TO 12TH STREET
INTERCHANGE LIGHTING ON I-459 AT CR-18 (EXIT #1) AND CR-52 (EXIT #6) (PRIORITY #29)
CONCRETE PAVEMENT RECONSTRUCTION ON I-459 FROM LORNA ROAD (MP14.794) TO WEST OF LITTLE SHADES CREEK (MP 15.892)
PAVEMENT REHAB AND GUARDRAIL SAFETY IMPROVEMENTS ON I-65 NB: FROM DANIEL PAYNE DRIVE TO NORTH OF 47TH AVENUE OVERPASS(MP 265.200) SB:FROM DANIEL PAYNE DRIVE TO SOUTH OF WALKER CHAPEL ROAD(MP 266.906)
CONCRETE PAVEMENT REHAB AND RESURFACING ON I-65 FROM 16TH STREET NORTH OVERPASS TO DANIEL PAYNE DRIVE
CONCRETE PAVEMENT REHAB AND RESURFACING ON I-65 FROM 16TH STREET NORTH OVERPASS TO DANIEL PAYNE DRIVE
CONCRETE PAVEMENT REHABILITATION ON I-59 FROM THE NORTH END OF BINS 10495 AND 10496, OVER VANDERBILT ROAD TO THE NORTH END OF BINS 11094 AND 11095, OVER AVIATION AVENUE, INCLUDING WORK AT THE I-20 INTERCHANGE. (CSX RAILROAD)
PAVEMENT PRESERVATION ON I-22 FROM COALBURG ROAD TO THE I-65 INTERCHANGE
SIGN REPLACEMENT ON I-459 FROM I-59/20 (EXIT 0) TO I-59 (EXIT 33)
SIGN REPLACEMENT ON I-459 FROM I-59/20 (EXIT 0) TO I-59 (EXIT 33)
SIGN REPLACEMENT ON I-22 FROM THE WALKER COUNTY LINE (EXIT 81) TO I-65 INTERCHANGE
RESURFACING ON I-85 FROM JUST SOUTH OF EXIT 57 (MP 56.72) TO NORTH OF EXIT 64 (MP 65.271)
RESURFACING ON I-65 FROM 0.6 MILES SOUTH OF SR-36 (MP 326.850) TO 1.1 MILES SOUTH OF INTERSTATE 565 (MP 338.900)
SIGN REPLACEMENT ON I-65 FROM THE TENNESSEE RIVER TO THE STATE LINE
ADDITIONAL LANES AND RESURFACING ON I-565 FROM WEST OF COUNTY LINE ROAD TO EAST OF WALL TRIANA HIGHWAY
PAVEMENT PRESERVATION ON I-85 FROM HALL STREET TO .3 MILES EAST OF ANN STREET
PAVEMENT PRESERVATION ON I-85 FROM HALL STREET TO .3 MILES EAST OF ANN STREET
SIGN REPLACEMENT ON I-65 FROM THE CULLMAN COUNTY LINE TO THE TENNESSEE RIVER
BRIDGE WIDEN ON I-65 CSX RR AND BUXAHATCHEE CK, SOUTH OF EXIT 228 BIN# 006832 AND #006833
RESURFACING ON I-59 FROM GREENE COUNTY LINE TO SR-300
RESURFACING ON I-59 FROM GREENE COUNTY LINE TO SR-300
RESURFACING ON I-59 FROM SR-300 (EXIT 62) TO JOE MALLISHAM PARKWAY (EXIT 68)
SIGN REHABILITATION ALONG I-59 FROM SUMTER COUNTY LINE TO JEFFERSON COUNTY LINE AND ALONG I-359 FROM SR-7/US-11(SKYLAND BOULEVARD) TO 12TH STREET
LEVEL OF EFFORT NON-INTERSTATE RESURFACING (FM) FY 2024
RESURFACING, SCRUB SEAL, AND STEEL BLOCKOUT REPLACEMENT AREA WIDE (GROVE HILL): SR-10 (MP 0-7.62); SR-59 (MP 80.68-93.66); SR-17 (MP 84.38-91.38); SR-21 (MP 84.08-91.41); SR-41 (MP 74.09-80.61); SR-154 (MP 16.14-21.88)
RESURFACING, 2' SAFETY WIDENING, SIGNAL BACKPLATES, AND BRIDGE RAIL RETROFIT ON SR-287 FROM SR-59 TO I-65
RESURFACING AND BRIDGE RAIL RETROFIT ON SR-42 (US-98) FROM 0.460 MILE SOUTH OF CR-32 TO CR-11 IN BARNWELL
RESURFACING AND MILLING ON SR-10 FROM CR-41 (BLUE SPRINGS TOWN LIMIT) TO .63 MILES WEST OF CR-25 (MP 212.34)
MICRO-SURFACING ON SR-25 FROM HALE COUNTY LINE TO SR-5
SCRUB SEAL AND MICRO-SURFACING ON SR-6 (US-82) FROM SR-25 TO SR-382 AND SR-6 (US-82)/SR-25 RAMPS
RESURFACING SR-53 (US-231) FROM LITTLETON ROAD TO HOPEWELL ROAD
MICRO SURFACE ON SR-110 FROM .4 MILE EAST OF CR-7 TO SR-6 (US-82)
RESURFACE SR-185 FROM SR-3 (US-31) TO THE SOUTH END OF THE BRIDGE OVER THE CSX RAILROAD (BIN 017971)
RESURFACING, TRAFFIC STRIPING, SAFETY IMPROVEMENTS AND ACCESS MANAGEMENT ON SR-21 FROM .291 MILES NORTH OF SUMMERALL GATE ROAD (MP 258.370) TO GEORGE DOUTHIT DRIVE (MP 265.252)
RESURFACING, TRAFFIC STRIPE, GUARDRAIL ON SR-50 FROM AVE. A SE (MP 42.925) TO CR-208 (MP 51.923)
RESURFACING, TRAFFIC STRIPE, GUARDRAIL, GUARDRAIL END ANCHORS, BRIDGE GUARDRAIL RETROFIT ON SR-50 FROM SR-1(US-431) (MP 40.881) TO AVE A SE (MP 42.925)
MICRO-MILLING AND RESURFACING ON SR-35 IN GAYLESVILLE FROM SR-273 (MP 11.200) TO THE DEKALB COUNTY LINE (MP 14.200)
MICRO-MILLING AND RESURFACING ON SR-68 FROM SR-35 (MP 46.050) TO 1.20 MILES EAST OF SR-35 (MP 47.250)
RESURFACING ON SR-12 (US-84) FROM MISSISSIPPI STATE LINE TO SR-17
RESURFACING ON SR-12 (US-84) FROM 0.34 MILE WEST OF CR-22 TO SR-295
RESURFACING ON SR-178 FROM SR-13 (US-43) TO CR-27 (WEST MAIN STREET)
RESURFACING AND 2' SAFETY WIDENING ON SR-27 FROM GENEVA COUNTY LINE TO THE BEGINNING OF 4 LANE SECTION
RESURFACING , MICRO-MILLING AND BRIDGE GUARDRAIL RETROFIT ON SR-87 FROM PEA CREEK NORTH OF ELBA TO THE PIKE COUNTY LINE
RESURFACING ON SR-2 (US-72/WOODWARD AVE.) FROM SR-20 TO SR-184
RESURFACING ON SR-41 FROM I-65 TO SR-12 (US-84)
RESURFACING ON SR-83 FROM THE CONECUH COUNTY LINE TO SR-47
RESURFACING AND TRAFFIC STRIPING ON SR-21(US-231) 0.560 MILES SOUTH OF SR-22 (MP 188.304) TO CR-59 (MP 191.620)
RESURFACING AND MILLING ON SR-55 FROM 0.270 MILES NORTH OF RECREATION ROAD TO THE BUTLER COUNTY LINE THREE NOTCH RAILWAY
MILL, RESURFACE, AND SAFETY INTERSECTION IMPROVEMENTS ON SR-55 FROM SR-12 IN RIVER FALLS TO .270 MILES NORTH OF RECREATION ROAD IN RED LEVEL (MP 38.081) THREE NOTCH RAILWAY
RESURFACING SR-15 (US-29) FROM SR-12 (US-84) TO JUST NORTH OF MAX BARTON ROAD IN ANDALUSIA
PLANING AND RESURFACING ON SR-69 FROM I-65 (MP 239.26) TO SR-3 (US-31) (MP 242.90)
RESURFACE, MILL, AND ADD 2' SAFETY WIDENING ON SR-51 FROM SR-53 (US-231) TO THE BARBOUR COUNTY LINE
RESURFACING AND MILLING AND BRIDGE GUARDRAIL RETROFIT ON SR-27 FROM 0.32 MILE WEST OF OZARK CITY LIMITS TO HENRY COUNTY LINE
MILL AND RESURFACING SR-134 FROM CR-67 TO THE HENRY COUNTY LINE
MICRO MILL, ADD 2' SAFETY WIDENING, AND RESURFACE SR-123 FROM ROY PARKER ROAD TO INTERSECTION OF SR-51
PLANING AND RESURFACING ON SR-41 FROM THE WILCOX COUNTY LINE TO SR-89.
PLANING AND RESURFACING ON SR-7 (US-11) FROM THE ETOWAH COUNTY LINE (MP 208.240) TO LYKES LANE (MP 215.350)
RESURFACE SR-143 FROM COOSADA ROAD TO SR-14 IN MILLBROOK
MICROSURFACE ON SR-14 FROM SR-63 TO SR-229 AND SIGN UPGRADE AT THE CR-155 (CHEROKEE TRAIL) INTERSECTION
RESURFACING AND SIGNAL BACKPLATES ON SR-21 FROM ALABAMA STATE LINE TO SUNSET DR
RESURFACING AND SIGNAL BACKPLATES ON SR-3 (US-31) FROM OLD HIGHWAY 31 (MP 64.774) TO THE SOUTH END OF THE BURNT CORN CREEK BRIDGE IN BREWTON
MICRO-MILLING, SCRUB SEAL, RESURFACING AND 2' SAFETY WIDENING ON SR-74 (US-278) IN HOKES BLUFF FROM ALFORD BEND ROAD (MP 141.190) TO THE CALHOUN COUNTY LINE (MP 148.560)
MICRO-SURFACING AND SCRUB SEAL ON SR-159 FROM THE PICKENS COUNTY LINE AT MP 17.378 TO SR-171 AT MP 29.626
RESURFACING ON SR-13 (US-43) FROM CR-36 TO UNDERWOOD ROAD
RESURFACE, MILL, AND ADD 2' SAFETY WIDENING ON SR-52 FROM LINE STREET IN SAMSON TO SR-196 IN GENEVA
RESURFACING, SCRUB SEAL, MICROSURFACING, AND GUARDRAIL RESET ON SR-60 FROM SR-14 TO SR-69
RESURFACE, PLANE, AND 2' SAFETY WIDENING ON SR-27 FROM SR-1 (US-431) TO SR-10 IN ABBEVILLE
RESURFACING, MILLING AND 2' SAFETY WIDENING ON SR-605 FROM FORTNER STREET TO SR-53 (US-231)
PLANING, SCRUB SEAL AND RESURFACING ON SR-71 IN SECTION FROM SR-35 (MP 0.000) TO CR-378 (MP 7.305)
PLANING, MICRO-MILLING AND RESURFACING ON SR-2 (US-72) IN FACKLER FROM CR-42 (MP 149.080) TO THE EAST BRIDGE END AT CROW CREEK IN STEVENSON (MP 154.890)
CONCRETE REPAIR AND RESURFACING ON SR-38 (US-280) FROM ROSEDALE DRIVE TO SR-149 AND RESURFACING FROM COLONNADE DRIVE TO THE CAHABA RIVER BRIDGE
SURFACE TREATMENT AND REPLACEMENT OF STEEL BLOCKOUTS ON SR-269 FROM THE BIRMINGHAM CITY LIMITS TO OLD MULGA LOOP ROAD
MICRO-SURFACING ON SR-7 (US-11) FROM SR-75 TO I-459
RESURFACING ON SR-7 (US-11) FROM I-459 TO WATTERSON PARKWAY
RESURFACING AND 2' SAFETY WIDENING ON SR-17 FROM OLD REFORM ROAD TO CR-9
RESURFACING AND 2' SAFETY WIDENING ON SR-18 FROM THE MISSISSIPPI STATE LINE TO 0.25 MILE EAST OF CR-31 (MP 4.417)
RESURFACING ON SR-20 FROM THE NATCHEZ TRACE PARKWAY TO CR-222
RESURFACING ON SR-20 (US-72) FROM COLBERT COUNTY LINE TO CR-585
RESURFACING ON SR-24 FROM CR-317 TO THE MORGAN CO. LINE
RESURFACING ON SR-147 FROM I-85 TO EAST UNIVERSITY DRIVE IN AUBURN
RESURFACING ON SR-147 FROM SOUTH COLLEGE STREET TO NORTH COLLEGE STREET IN AUBURN
RESURFACE ON SR-251 FROM SR-3 (US-31) TO 0.26 MILES NORTH OF EAST LIMESTONE ROAD
RESURFACING ON SR-2 (US-72) FROM SHAW RD. TO YORK LN.
RESURFACING ON SR-251 FROM 0.26 MI NORTH OF EAST LIMESTONE ROAD TO SR-53
RESURFACE AND BRIDGE GUARDRAIL RETROFIT ON SR-8 (US-80) FROM SR-97 IN LOWNDESBORO TO THE PINTLALA CREEK BRIDGE
MICROSURFACE ON SR-15 (US-29) FROM SR-186 TO THE LEE COUNTY LINE
RESURFACE ON SR-186 FROM I-85 TO SR-8 (US-80)
RESURFACING ON SR-1 (US-231 / US-431) IN HAZEL GREEN FROM WALKER LANE (MP 346.760) TO THE TENNESSEE STATE LINE (MP 352.970)
RESURFACING ON SR-28 FROM SR-66 TO 0.43 MILE WEST OF SR-5
RESURFACING AND STEEL BLOCKOUT REPLACEMENT ON SR-8 (US-80) FROM LEE AVE. TO THE HALE COUNTY LINE
RESURFACING ON SR-66 FROM SR-28 TO THE DALLAS COUNTY LINE
RESURFACING AND 1' SAFETY WIDENING ON SR-187 FROM SR-17 (0.20) TO CR-29 (MP 4.278)
RESURFACING, GUARDRAIL REPLACEMENT, AND GUARDRAIL END ANCHOR REPLACEMENT ON SR-233 FROM SR-129 (MP 0.00) TO SR-74 (US-278) (MP 14.561)
PLANING AND RESURFACING ON SR-69 FROM HOLBROOK DRIVE (MP 272.70) TO NUEL ROAD (MP 277.70)
MICRO-MILLING, SCRUB SEAL AND RESURFACING ON SR-179 FROM SR-74 (US-278) (MP 0.000) TO SR-168 (MP 10.430)
MICRO-MILLING AND RESURFACING ON SR-75 FROM SR-1 (US-431) (MP 58.80) TO GARY ROAD (MP 62.99)
RESURFACING AND SIGNAL BACKPLATES ON SR-193 FROM LAURENDINE ROAD TO JUST NORTH OF CSX RAILROAD
RESURFACING AND SIGNAL BACKPLATES ON SR-16 (US-90) FROM EAST ABUTMENT OF FOWL RIVER BRIDGE TO HALLS MILL CREEK BRIDGE
RESURFACING AND SIGNAL BACKPLATES ON SR-217 FROM SR-17 (US-45) TO LAKEVIEW RIDGE LANE
RESURFACING ON SR-9 FROM I-85 TO SR-21 (US-231)
RESURFACING ON SR-9 (US-331) FROM .5 MILE SOUTH OF CR-24 TO .4 MILE SOUTH OF CR-61
RESURFACING ON SR-20 (ALT US-72) FROM 12TH AVE. TO 0.5 MI WEST OF SR-3 (US-31) AT THE NORFOLK SOUTHERN RAILROAD
RESURFACING ON SR-67 FROM 0.61 MILES SOUTH OF CRAWFORD RD. TO 0.38 MILES SOUTH OF PINES RD.
RESURFACING ON SR-6 (US-82) FROM 1 MILE EAST OF THE REFORM CITY LIMITS (MP 16.810) TO 4TH AVENUE SOUTHEAST
PLANE AND RESURFACE SR-15 (US-29) FROM JUST NORTH OF THE SR-53 (US-231) OVERPASS TO NEEDMORE ROAD IN TROY
RESURFACING AND 2' SAFETY WIDENING ON SR-223 FROM SR-15 (US-29) TO THE BULLOCK COUNTY LINE
RESURFACING, TRAFFIC STRIPING, GUARDRAIL, GUARDRAIL END ANCHORS, AND CROSS SLOPE CORRECTION ON SR-48 FROM 0.280 MILES WEST OF CR-531 (MP 24.961) TO THE GEORGIA STATE LINE (MP 34.321)
MICROSURFACE ON SR-1 (US-431) FROM OLD SEALE HIGHWAY (MP 95.619) TO MAGNOLIA GREENE HIGHWAY (MP 101.378)
RESURFACING SR-3 (US-31) FROM 7TH AVENUE IN CALERA TO THE SOUTHERN BRIDGE END OF THE I-65 OVERPASS (EXIT 231)
RESURFACING SR-3 (US-31) FROM THE SOUTHERN BRIDGE END OF I-65 OVERPASS (EXIT 231) TO FULTON LAKE ROAD IN ALABASTER
RESURFACING ON SR-3 (US-31) FROM FULTON LAKE ROAD IN ALABASTER TO THE I-65 OVERPASS (EXIT 238)
SURFACE TREATMENT ON SR-76 FROM SR-25 TO SR-38(US-280)
RESURFACING ON SR-53 (US-231) FROM 12TH AVE N TO SR-25 (US-411)
SURFACE TREATMENT ON SR-25(US-411) FROM THE JEFFERSON COUNTY LINE TO CHURCH STREET
RESURFACING, PLANING, G-TREATMENT, AND WEARING SURFACE ON SR-8 (US-80) FROM SR-17 TO 0.75 MILE WEST OF PINE STREET NORTHEAST AND SR-17/SR-8 RAMPS
RESURFACING, TRAFFIC STRIPE, GUARDRAIL, GUARDRAIL END ANCHORS, SAFETY CROSS SLOPE CORRECTION, AND INTERSECTION IMPROVEMENTS ON SR-34 FROM THE ST. CLAIR COUNTY LINE (MP 4.672) TO SR-77 (MP 13.125)
RESURFACING AND TRAFFIC STRIPING ON SR-38 (US-280) FROM COOSA STREET (MP 43.000) TO COOSA COUNTY LINE (MP 47.394)
RESURFACING, TRAFFIC STRIPING, 2 FT SAFETY WIDENING, GUARDRAIL, GUARDRAIL END ANCHORS, AND BRIDGE GUARDRAIL RETROFIT ON SR-49 FROM CR-57 (MP 39.727) TO SR-22 (MP 47.391)
RESURFACING ON SR-13 (US-43) FROM 0.27 MILE SOUTH OF NORTHSIDE ROAD TO FAYETTE COUNTY LINE
RESURFACING AND 2' SAFETY WIDENING ON SR-216 FROM SR-215 TO LOCK 17 ROAD
RESURFACING ON SR-69 FROM SR-5 TO THE NORTH END OF BLACKWATER CREEK BRIDGE (MP 213.011)
RESURFACING, 2' SAFETY WIDENING, AND CULVERT EXTENSION ON SR-162 FROM .25 MILE WEST OF DIXON CREEK TO SR-28
LEVEL OF EFFORT SECTION 5311 RTAP AND NON-URBANIZED AREA (APPORTIONMENTS FY 2021)
SECTION 5311 TRANSIT AUTAUGA CO COMM OPERATING (FY 2024)
SECTION 5311 TRANSIT AUTAUGA CO COMM ADMIN (FY 2024)
SECTION 5311 TRANSIT AUTAUGA CO COMM CAPITAL PREVENTIVE MAINT (FY 2024)
SECTION 5311 ARP TRANSIT BALDWIN CO COMM OPERATING (FY 2024)
SECTION 5311 TRANSIT BALDWIN CO COMM OPERATING (FY 2024)
SECTION 5311 TRANSIT BALDWIN CO COMM ADMIN (FY 2024)
SECTION 5311 TRANSIT BALDWIN CO COMM CAPITAL PREVENTIVE MAINT (FY 2024)
SECTION 5311 TRANSIT CITY OF EUFAULA OPERATING (FY 2024)
SECTION 5311 TRANSIT CITY OF EUFAULA ADMIN (FY 2024)
SECTION 5311 TRANSIT CITY OF EUFAULA CAPITAL PREVENTIVE MAINT (FY 2024)
SECTION 5311 BLOUNT CO COMM OPERATING (FY 2024)
SECTION 5311 APPA BLOUNT CO COMM ADMIN (FY 2024)
SECTION 5311 BLOUNT CO COMM CAPITAL PREVENTIVE MAINT (FY 2024)
SECTION 5311 ARP TRANSIT E AL REG PLAN AND DEV COMM OPERATING (FY 2024)
SECTION 5311 TRANSIT E AL REG PLAN AND DEV COMM OPERATING (FY 2024)
SECTION 5311 TRANSIT E AL REG PLAN AND DEV COMM ADMIN (FY 2024)
SECTION 5311 TRANSIT E AL REG PLAN AND DEV COMM CAPITAL PREVENTIVE MAINT (FY 2024)
SECTION 5311 TRANSIT CHILTON CO COMM OPERATING (FY 2024)
SECTION 5311 TRANSIT CHILTON CO COMM ADMIN (FY 2024)
SECTION 5311 TRANSIT CHILTON CO COMM CAPITAL PREVENTIVE MAINT (FY 2024)
SECTION 5311 TRANSIT CHILTON CO COMM CAPITAL MOBILITY MANAGEMENT (FY 2024)
SECTION 5311 TRANSIT NW AL COUNCIL OF LOCAL GOV OPERATING (FY 2024)
SECTION 5311 TRANSIT NW AL COUNCIL OF LOCAL GOV ADMIN (FY 2024)
SECTION 5311 TRANSIT NW AL COUNCIL OF LOCAL GOV CAPITAL PREVENTIVE MAINT (FY 2024)
SECTION 5311 TRANSIT NW AL COUNCIL OF LOCAL GOV CAPITAL MOBILITY MANAGEMENT (FY 2024)
SECTION 5311 TRANSIT ALABAMA TOMBIGBEE REGIONAL COMM OPERATING (FY 2024)
SECTION 5311 TRANSIT ALABAMA TOMBIGBEE REGIONAL COMM ADMIN (FY 2024)
SECTION 5311 TRANSIT ALABAMA TOMBIGBEE REGIONAL COMM CAPITAL PREVENTIVE MAINT (FY 2024)
SECTION 5311 TRANSIT ALABAMA TOMBIGBEE REGIONAL COMM CAPITAL SERVICE TRUCK (FY 2024)
SECTION 5311 TRANSIT COVINGTON CO COMM OPERATING (FY 2024)
SECTION 5311 TRANSIT COVINGTON CO COMM ADMIN (FY 2024)
SECTION 5311 TRANSIT COVINGTON CO COMM PREVENTIVE MAINT (FY 2024)
SECTION 5311 TRANSIT COVINGTON CO COMM CAPITAL SUPPORT EQUIP (FY 2024)
SECTION 5311 TRANSIT CULLMAN CO COMM OPERATING (FY 2024)
SECTION 5311 TRANSIT CULLMAN CO COMM ADMIN (FY 2024)
SECTION 5311 TRANSIT CULLMAN CO COMM CAPITAL PREVENTIVE MAINT (FY 2024)
SECTION 5311 TRANSIT DEKALB CO COMM OPERATING (FY 2024)
SECTION 5311 TRANSIT DEKALB CO COMM ADMIN (FY 2024)
SECTION 5311 TRANSIT DEKALB CO COMM CAPITAL PREVENTIVE MAINT (FY 2024)
SECTION 5311 TRANSIT DEKALB CO COMM CAPITAL MOBILITY MANAGEMENT (FY 2024)
SECTION 5311 TRANSIT ESCAMBIA CO COMM OPERATING (FY 2024)
SECTION 5311 TRANSIT ESCAMBIA CO COMM ADMIN (FY 2024)
SECTION 5311 TRANSIT ESCAMBIA CO COMM CAPITAL PREVENTIVE MAINT (FY 2024)
SECTION 5311 TRANSIT ETOWAH CO COMM OPERATING (FY 2024)
SECTION 5311 TRANSIT ETOWAH CO COMM ADMIN (FY 2024)
SECTION 5311 TRANSIT ETOWAH CO COMM CAPITAL PREVENTIVE MAINT (FY 2024)
SECTION 5311 TRANSIT ETOWAH CO COMM CAPITAL MOBILITY MANAGEMENT (FY 2024)
SECTION 5311 TRANSIT ETOWAH CO COMM CAPITAL SUPPORT EQUIP (FY 2024)
SECTION 5311 TRANSIT CITY OF FAYETTE ADMIN (FY 2024)
SECTION 5311 TRANSIT CITY OF FAYETTE CAPITAL SUPPORT EQUIP (FY 2024)
SECTION 5311 TRANSIT WEST AL HEALTH SERVICES, INC. OPERATING (FY 2024)
SECTION 5311 TRANSIT WEST AL HEALTH SERVICES, INC. ADMIN (FY 2024)
SECTION 5311 TRANSIT WEST AL HEALTH SERVICES, INC. CAPITAL PREVENTIVE MAINT (FY 2024)
SECTION 5311 TRANSIT SE AL REG PLAN AND DEV OPERATING (FY 2024)
SECTION 5311 TRANSIT SE AL REG PLAN AND DEV ADMIN (FY 2024)
SECTION 5311 TRANSIT SE AL REG PLAN AND DEV CAPITAL PREVENTIVE MAINT (FY 2024)
SECTION 5311 TRANSIT JACKSON CO COMM OPERATING (FY 2024)
SECTION 5311 TRANSIT JACKSON CO COMM ADMIN (FY 2024)
SECTION 5311 TRANSIT JACKSON CO COMM CAPITAL PREVENTIVE MAINT (FY 2024)
SECTION 5311 TRANSIT BIRMINGHAM REGIONAL PARATRANSIT OPERATING (FY 2024)
SECTION 5311 TRANSIT BIRMINGHAM REGIONAL PARATRANSIT ADMIN (FY 2024)
SECTION 5311 TRANSIT BIRMINGHAM REGIONAL PARATRANSIT CAPITAL PREVENTIVE MAINT (FY 2024)
SECTION 5311 TRANSIT LAWRENCE CO COMM OPERATING (FY 2024)
SECTION 5311 TRANSIT LAWRENCE CO COMM ADMIN (FY 2024)
SECTION 5311 TRANSIT LAWRENCE CO COMM CAPITAL PREVENTIVE MAINT (FY 2024)
SECTION 5311 TRANSIT LAWRENCE CO COMM CAPITAL SUPPORT EQUIP (FY 2024)
SECTION 5311 TRANSIT LEE-RUSSELL COG OPERATING (FY 2024)
SECTION 5311 TRANSIT LEE-RUSSELL COG ADMIN (FY 2024)
SECTION 5311 TRANSIT LEE-RUSSELL COG CAPITAL PREVENTIVE MAINT (FY 2024)
SECTION 5311 TRANSIT LEE-RUSSELL COG CAPITAL MOBILITY MANAGEMENT (FY 2024)
SECTION 5311 TRANSIT LEE-RUSSELL COG CAPITAL SUPPORT EQUIP (FY 2024)
SECTION 5311 TRANSIT MACON CO COMM OPERATING (FY 2024)
SECTION 5311 TRANSIT MACON CO COMM ADMIN (FY 2024)
SECTION 5311 TRANSIT MACON CO COMM CAPITAL PREVENTIVE MAINT (FY 2024)
SECTION 5311 TRANSIT MACON CO COMM CAPITAL MOBILITY MANAGEMENT (FY 2024)
SECTION 5311 TRANSIT MADISON CO COMM OPERATING (FY 2024)
SECTION 5311 TRANSIT MADISON CO COMM ADMIN (FY 2024)
SECTION 5311 TRANSIT MADISON CO COMM CAPITAL PREVENTIVE MAINT (FY 2024)
SECTION 5311 TRANSIT CITY OF GUNTERSVILLE OPERATING (FY 2024)
SECTION 5311 TRANSIT CITY OF GUNTERSVILLE ADMIN (FY 2024)
SECTION 5311 TRANSIT CITY OF GUNTERSVILLE CAPITAL PREVENTIVE MAINT (FY 2024)
SECTION 5311 TRANSIT H.E.L.P., INC. OPERATING (FY 2024)
SECTION 5311 TRANSIT H.E.L.P., INC. ADMIN (FY 2024)
SECTION 5311 TRANSIT H.E.L.P., INC. CAPITAL PREVENT MAINT (FY 2024)
SECTION 5311 TRANSIT H.E.L.P., INC. CAPITAL MOBILITY MANAGEMENT (FY 2024)
SECTION 5311 TRANSIT H.E.L.P., INC. CAPITAL SUPPORT EQUIP (FY 2024)
SECTION 5311 TRANSIT CITY OF TROY OPERATING (FY 2024)
SECTION 5311 TRANSIT CITY OF TROY ADMIN (FY 2024)
SECTION 5311 TRANSIT ST. CLAIR CO COMM OPERATING (FY 2024)
SECTION 5311 TRANSIT ST. CLAIR CO COMM ADMIN (FY 2024)
SECTION 5311 TRANSIT ST. CLAIR CO COMM CAPITAL PREVENTIVE MAINT (FY 2024)
SECTION 5311 TRANSIT TROY UNIVERSITY - OFFICE OF PUBLIC TRANSPORTATION (STATE ADMIN) FY 2024
SECTION 5311 TRANSIT TROY UNIVERSITY - RTAP FY 2024
SECTION 5311(F) TRANSIT WEST ALABAMA HEALTH SERVICE (INTERCITY OPERATING) FY2024
SECTION 5311(F) TRANSIT WEST ALABAMA HEALTH SERVICE (INTERCITY CAPITAL SUPPORT EQUIP) FY2024
SECTION 5311(F) TRANSIT WEST ALABAMA HEALTH SERVICE CAPITAL (INTERCITY SERVICE VEHICLE) FY2024
SECTION 5311F TRANSIT GREYHOUND LINES, INC. (INTERCITY OPERATING) FY 2024
SECTION 5311F TRANSIT GREYHOUND LINES, INC. (INTERCITY CAPITAL BUS) FY 2024
SECTION 5311F TRANSIT LOVING CARE GROUP TRANSPORTATION (INTERCITY OPERATING) FY 2024
SECTION 5311F TRANSIT LOVING CARE GROUP TRANSPORTATION (INTERCITY CAPITAL SUPPORT EQUIP) FY 2024
SECTION 5311 TRANSIT CROWN CONSULTING GROUP - TMS (STATE ADMIN FY 24-26)
SECTION 5311 TRANSIT ARISE, INC. OPERATING (FY 2024)
SECTION 5311 TRANSIT ARISE, INC. ADMIN (FY 2024)
SECTION 5311 TRANSIT ARISE, INC. CAPITAL PREVENTIVE MAINT (FY 2024)
SECTION 5311 TRANSIT ARISE, INC. CAPITAL MOBILITY MANAGEMENT (FY 2024)
SECTION 5311 TRANSIT ARISE, INC. CAPITAL SUPPORT EQUIP (FY 2024)
SECTION 5311 TRANSIT WALKER CO COMM OPERATING (FY 2024)
SECTION 5311 TRANSIT WALKER CO COMM ADMIN (FY 2024)
SECTION 5311 TRANSIT WALKER CO COMM CAPITAL PREVENTIVE MAINT (FY 2024)
SECTION 5311 TRANSIT ARC OF SW ALABAMA OPERATING (FY 2024)
SECTION 5311 TRANSIT ARC OF SW ALABAMA ADMIN (FY 2024)
SECTION 5311 TRANSIT ARC OF SW ALABAMA CAPITAL PREVENTIVE MAINT (FY 2024)
SECTION 5311 TRANSIT WASHINGTON CO COMM ADMIN (FY 2024)
SECTION 5311 TRANSIT WASHINGTON CO COMM CAPITAL PREVENTIVE MAINT (FY 2024)
LEVEL OF EFFORT SECTION 5310 RURAL AND SMALL URBAN APPORTIONMENTS - FY 2023
SECTION 5310 TRANSIT WELLS OF HOPE MINISTRIES (RURAL) CAPITAL PURCHASED TRANS - FY24
SECTION 5310 TRANSIT GREATER ETOWAH 310 BOARD (URBAN) CAPITAL PURCHASED TRANS - FY24
SECTION 5310 TRANSIT STERLING CO, INC (URBAN) CAPITAL PREVENTATIVE MAINT - FY24
SECTION 5310 TRANSIT KID ONE TRANSPORT SYSTEM (RURAL) CAPITAL PREVENTATIVE MAINT - FY24
SECTION 5310 TRANSIT GLENWOOD, INC (RURAL) CAPITAL PREVENTATIVE MAINT - FY24
SECTION 5310 TRANSIT LEE-RUSSELL COUNCIL OF LOCAL GOVERNMENTS (URBAN) CAPITAL PURCHASED TRANS - FY24 SPLIT W/ 2021-015 (100078314)
SECTION 5310 TRANSIT LEE-RUSSELL COUNCIL OF LOCAL GOVERNMENTS (URBAN) CAPITAL PURCHASED TRANS - FY24 SPLIT W/ 2016-013 (100078313)
SECTION 5310 TRANSIT WEST AL MENTAL HEALTH (RURAL) CAPITAL PURCHASED TRANS - FY24
SECTION 5310 TRANSIT WEST AL MENTAL HEALTH (RURAL) CAPITAL PREVENTATIVE MAINT - FY24
SECTION 5310 TRANSIT CITY OF GUNTERSVILLE (RURAL) CAPITAL PURCHASED TRANS - FY24
ACQUISITION OF ONE 14-PASSENGER BUS AND ONE ADA COMPLIANT MINI-VAN FOR THE INDEPENDENT LIVING CENTER (5310 FUNDS)
AQCUISITION OF FOUR ADA COMPLIANT 14-PASSENGER BUSES FOR ALTAPOINTE (5310 FUNDS)
ACQUISITION OF ONE SMALL ADA COMPLIANT BUS FOR VIA HEALTH, FITNESS AND ENRICHMENT CENTER (5310 FUNDS)
CITY OF SATSUMA OPERATING FUNDS (5310 FUNDS)
SARPC - PROGRAM ADMINISTRATION
SARPC FTA 5310 ADMINISTRATION
SECTION 5310 TRANSIT ALTAPOINTE HEALTH SYSTEMS (RURAL) CAPITAL ROLLING STOCK (5 MV) FY-23
SECTION 5310 TRANSIT MONTGOMERY CANCER WELLNESS (RURAL) CAPITAL PURCHASED TRANS - FY24
SECTION 5310 TRANSIT FOCUS ON SENIOR CITIZENS OF TUSCALOOSA CAPITAL ROLLING STOCK (1 MV/2 HRV/H1) FY-2023
SECTION 5310 TRANSIT ARTS 'N AUTISM (URBAN) CAPITAL PURCHASED TRANS - (FY 2024)
SECTION 5310 TRANSIT ARTS 'N AUTISM (URBAN) CAPITAL PREVENTATIVE MAINT - (FY 2024)
SECTION 5310 TRANSIT NW AL MENTAL HEALTH (RURAL) CAPITAL PREVENTATIVE MAINT - FY24
LEVEL OF EFFORT SECTION 5339 BUS AND BUS FACILITIES (STATEWIDE-31 AND SMALL URBAN-BF APPORTIONMENTS FY 2021) ROLLING STOCK
LEVEL OF EFFORT SECTION 5339 BUS AND BUS FACILITIES (STATEWIDE-31 AND SMALL URBAN-BF APPORTIONMENTS FY 2022) ROLLING STOCK
SECTION 5339 TRANSIT NW AL COUNCIL OF LOCAL GOV CAPITAL SUPPORT EQUIP (SERVICE TRUCK) FY 2024
SECTION 5339 TUSCALOOSA TRANSIT CAPITAL APPORTIONMENT FY 2023
LEVEL OF EFFORT RECREATIONAL TRAILS FOR FY 2024
LEVEL OF EFFORT ELECTRIC VEHICLE PROGRAM FY 2024
LEVEL OF EFFORT-SECTION 5307 TRANSIT- BIRMINGHAM (APPORTIONMENT FY 2022)
LEVEL OF EFFORT-SECTION 5307 TRANSIT-PHENIX CITY (APPORTIONMENT FY 2022)
LEVEL OF EFFORT-SECTION 5307 TRANSIT-HUNTSVILLE (APPORTIONMENT FY 2022)
LEVEL OF EFFORT-SECTION 5307 TRANSIT-MOBILE(APPORTIONMENT FY 2022)
LEVEL OF EFFORT-SECTION 5307 TRANSIT-MONTGOMERY(APPORTIONMENT FY 2022)
LEVEL OF EFFORT-SECTION 5307 TRANSIT-LILLIAN (APPORTIONMENT FY 2022)
LEVEL OF EFFORT-SECTION 5307-ANNISTON (APPORTIONMENT FY 2022)
LEVEL OF EFFORT-SECTION 5307-AUBURN (APPORTIONMENT FY 22)
LEVEL OF EFFORT-SECTION 5307-DECATUR-(APPORTIONMENT FY 2022)
LEVEL OF EFFORT-SECTION 5307-DAPHNE-FAIRHOPE-(APPORTIONMENT FY 2022)
SECTION 5307 TRANSIT - SPANISH FORT TRANSIT HUB
SECTION 5307 TRANSIT - DAPHNE TRANSIT STOP
SECTION 5307 TRANSIT - OPERATING ASSISTANCE FY 2020
LEVEL OF EFFORT-SECTION 5307-DOTHAN(APPORTIONMENT FY 2022)
SECTION 5307 SEARPDC WIREGRASS TRANSIT OPERATING ASSISTANCE ARP FY 2023
LEVEL OF EFFORT-SECTION 5307-FLORENCE(APPORTIONMENT FY 2022)
LEVEL OF EFFORT-SECTION 5339- BIRMINGHAM (FTA APPORTIONMENT FY 22)
LEVEL OF EFFORT-SECTION 5339-HUNTSVILLE (APPORTIONMENT FY 22)
LEVEL OF EFFORT-SECTION 5339-MOBILE(APPORTIONMENT FY 2022)
CITY OF MOBILE FY21 FTA5339(B) BUS AND BUS FACILITIES
LEVEL OF EFFORT-SECTION 5339-MONTGOMERY(APPORTIONMENT FY 2022)
LEVEL OF EFFORT--SECTION 5339- PHENIX CITY (APPORTIONMENT FY 22)
LEVEL OF EFFORT-SECTION 5339-EASTERN SHORE(LILLIAN)-APPORTIONMENT FY 2022
LEVEL OF EFFORT-SECTION 5310-BIRMINGHAM(APPORTIONMENT FY 22)
LEVEL OF EFFORT 5310 PROGRAM- PURCHASE ALTERNATIVE FUEL BUS (FY-2022 APPORTIONMENT)
LEVEL OF EFFORT 5310 PROGRAM-OPERATING EXPENSES (FY-2022 APPORTIONMENT)
LEVEL OF EFFORT 5310 PROGRAM - CLASTRAN OPERATING EXPENSES (FY 2023 APPORTIONMENT)
LEVEL OF EFFORT - SECTION 5310 HUNTSVILLE (URBAN) APPORTIONMENT FY-2023
LEVEL OF EFFORT - SECTION 5310 CITY OF HUNTSVILLE (URBAN APPORTIONMENT FY-2022)
LEVEL OF EFFORT-SECTION 5310-MOBILE (APPORTIONMENT FY 2022)
SECTION 5310 CAPITAL APPORTIONMENT YEAR 2023 PROGRAM OF PROJECTS
LEVEL OF EFFORT-SECTION 5310-MONTGOMERY (APPORTIONMENT FY 2022)
LEVEL OF EFFORT-SECTION 5310-PHENIX CITY (APPORTIONMENT FY 2022)
LEVEL OF EFFORT-SECTION 5310-EASTERN SHORE(PENSACOLA) (APPORTIONMENT FY 2022)
LEVEL OF EFFORT SAFETY PROGRAM FY 2025
ACCESS MANAGEMENT ALONG SR-3 (US-31) FROM MURFEE DRIVE TO CR-75 (MCQUEEN SMITH ROAD) AND INSTALLATION OF GREEN-T SIGNAL AT THE INTERSECTION OF SR-3 (US-31) AND CR-75 (MCQUEEN SMITH ROAD)
INTERSECTION IMPROVEMENTS (R-CUT) AT CR-64 AND BALDWIN BEACH EXPRESS
MODIFY THE VERTICAL ALIGNMENT ON SR-27 .34 MILES NORTH OF THE SHELLFIELD ROAD INTERSECTION
REDUCED CONFLICT INTERSECTION (U-TURN) MODIFICATIONS AT SR-20 AND GARGIS LANE (CR-77)
REDUCED CONFLICT INTERSECTION (U-TURN) MODIFICATIONS AT SR-20 AND GARGIS LANE (CR-77)
REDUCED CONFLICT INTERSECTION (U-TURN) MODIFICATIONS AT SR-20 AND GARGIS LANE (CR-77)
ACCESS MANAGEMENT IN LEVEL PLAINS ALONG SR-12 (US-84) FROM CR-709 TO CR-1
RESURFACING AND 2' SAFETY WIDENING ON SR-41 FROM SR-89 TO CR-85
RESURFACING AND 2' SAFETY WIDENING ON SR-41 FROM CR-85 TO SR-8 (US-80)
ACCESS MANAGEMENT ALONG SR-9 (US-231) FROM CHARLES AVENUE TO MAIN STREET
INSTALLATION OF SIGNALIZED CONTINUOUS GREEN-T INTERSECTION AT SR-14 AND CR-59 (FIRETOWER ROAD)
INSTALLATION OF SIGNALIZED CONTINUOUS GREEN-T INTERSECTION AT SR-14 AND CR-59 (FIRETOWER ROAD)
INSTALLATION OF SIGNALIZED CONTINUOUS GREEN-T INTERSECTION AT SR-14 AND CR-59 (FIRETOWER ROAD)
ACCESS MANAGEMENT ON SR-1(US-431) FROM COX GAP ROAD TO THE MARSHALL COUNTY LINE.
ACCESS MANAGEMENT ALONG SR-210 (ROSS CLARK CIRLCE) FROM KELLY DRIVE TO MEDICAL PARK BOULEVARD
INTERSECTION IMPROVEMENTS ON COLUMBUS PARKWAY AT 4TH, 6TH AND 7TH STREETS
SAFETY IMPROVEMENTS (REDUCED CONFLICT INTERSECTION (RCI) / R-CUT) ON SR-53 AT BURWELL ROAD
RESURFACING AND HIGH SURFACE TREATMENT ON SR-1 (US-431) FROM THE NORTH END OF THE TENNESSEE RIVER BRIDGE (MP 298.10) TO CATHEDRAL CAVERNS HIGHWAY (MP 304.84)
MODIFICATIONS AT THE SR-1(US-431)/SR-26 INTERSECTION INCLUDING OFFSET SB RIGHT TURN LANE AND ADDING A NB ACCELERATION LANE
MODIFICATIONS AT THE SR-1(US-431)/SR-26 INTERSECTION INCLUDING OFFSET SB RIGHT TURN LANE AND ADDING A NB ACCELERATION LANE
INTERSECTION IMPROVEMENTS ON SR-34 AT CROPWELL DRIVE AND HARDWICK ROAD (CR-45), INCLUDING ROUNDABOUT CONSTRUCTION IN PELL CITY
INTERSECTION IMPROVEMENTS ON SR-34 AT CROPWELL DRIVE AND HARDWICK ROAD (CR-45), INCLUDING ROUNDABOUT CONSTRUCTION IN PELL CITY
RESURFACING, 2' SAFETY WIDENING, SCORING AND ADA CURB RAMPS ON SR-28 FROM SR-7 (US-11) TO CR-21
RESURFACING AND PLANING ON SR-7 (US-11) FROM SR-6 (US-82) TO PLEASANT HILL DRIVE AND MODIFYING LEFT TURN LANE OFFSET AT HARGROVE ROAD, PALISADES DRIVE AND CYPRESS CREEK AVENUE INTERSECTIONS
LEVEL OF EFFORT FOR TRANSPORTATION ALTERNATIVES PROGRAM FY 2025
CORRECTING ADA DEFICIENCIES IN PEDESTRIAN PATHS AND SIDEWALKS IN THE DOWNTOWN CITY OF PRATTVILLE
SIDEWALK IMPROVEMENTS ALONG NE 7TH ST. FROM EAST SHRIVER AVE. TO TOWN LIMITS, ALONG WEST WASINGTON AVE. FROM NW 4TH ST. TO NW 1ST ST. AND ALONG NW 4TH ST. FROM WEST SHRIVER AVE. TO WEST JACKSON AVE. IN THE TOWN OF SUMMERDALE
SIDEWALK IMPROVEMENTS ALONG E 1ST STREET FROM E 16TH AVENUE TO E 19TH AVENUE IN THE CITY OF GULF SHORES
PEDESTRIAN BRIDGE ON THE EASTERN SHORE TRAIL OVER POINT CLEAR CREEK IN BALDWIN COUNTY COMMISSION
SIDEWALK ALONG GEORGE DOUTHIT DRIVE, SW AND JAMES HOPKINS ROAD, SW IN THE CITY OF JACKSONVILLE
MIKE TUCKER PARK TRAILHEAD IMPROVEMENTS AT THE CHIEF LADIGA TRAIL IN THE CITY OF ANNISTON
SIDEWALK ALONG CULVER RD. FROM WESTLEE DR TO JOE MALLISHAM PKWY., ALONG JOE MALLISHAM PKWY FROM CULVER RD TO FOSTERS FERRY RD, AND ALONG FOSTERS FERRY RD FROM JOE MALLISHAM PKWY TO AN EXISTING MULTI-USE - PHASE II IN TUSCALOOSA COUNTY
ADA SIDEWALKS ALONG MAYTON DRIVE, CARL E. NEWSOME AND COLLEGE AVENUE IN THE CITY OF JACKSON
SIDEWALK ON CLAXTON AVE. FROM TROY RD. TO DAVIS ST., CONNECTING TO EXISTING SIDEWALKS ON W. COLLIER ST., BUFORD ST. AND COURT AVE. WITH SIDEWALK REPLACEMENT IN THE CITY OF ELBA
DOWNTOWN STREETSCAPE IMPROVEMENTS ALONG MAIN STREET IN THE TOWN OF LEIGHTON
SIDEWALK ALONG BROWN ST. FROM BARRINGTON CT. TO EAST 6TH ST. AND ALONG WEBSTER ST. FROM THE EXISTING SIDEWALK N OF AVALON AVE. TO THE EXISTING SIDEWALK AT THE AIRPORT SPORTS COMPLEX IN THE CITY OF MUSCLE SHOALS
DOWNTOWN SIDEWALK IMPROVEMENTS ALONG 9TH STREET/JOSH TURNER DRIVE FROM 5TH AVENUE TO BEGONIA STREET IN THE CITY OF FLORALA
SIDEWALK IMPROVEMENTS ON 3RD AVENUE FROM 3RD ST. TO EAST THREE NOTCH ST. IN THE CITY OF ANDALUSIA
SIDEWALKS ALONG CALVERT ROAD AND HATHCOCK ROAD IN THE TOWN OF GOOD HOPE
DOWNTOWN STREETSCAPE IMPROVEMENTS ON 4TH AVE. SW FROM 3RD. ST. SW TO 4TH ST. SW AND ON 4TH ST. SW FROM 4TH AVE. SW TO 5TH AVE. SW IN THE CITY OF CULLMAN
SIDEWALK IMPROVEMENTS ALONG CR-59, ALONG KIMBERLY ST., ALONG HALIE DR., ALONG COTTON DR., ALONG 2ND ST. AND MISCELLANEOUS SIDEWALK REPAIRS TO MEET ADA COMPLIANCE ALONG CR-59 AND KELLY AVENUE IN THE CITY OF MIDLAND CITY
RIVERFRONT BOARDWALK-PHASE I LOCATED ALONG THE ALABAMA RIVER ON AN ELEVATED BANK RUNNING PARALLEL TO WATER AVENUE IN THE CITY OF SELMA.
RIVERFRONT BOARDWALK-PHASE II CITY OF SELMA
STREETSCAPE IMPROVEMENTS ALONG ALABAMA AVENUE FROM BROAD STREET TO GREEN STREET - PHASE I IN THE CITY OF SELMA
SIDEWALK IMPROVEMENTS ALONG SR-40 AND SR-75 IN THE CITY OF HENAGAR
SIDEWALKS ON SR-117 FROM DEMPSEY AVENUE TO MOON LAKE LIBRARY
SIDEWALK ALONG SR 227 FROM GERALDINE HIGH SCHOOL TO SR 75 IN THE TOWN OF GERALDINE
SIDEWALK IMPROVEMENTS ALONG WILLIAMSON STREET FROM W.S. NEAL ELEMENTARY AND W.S. MIDDLE SCHOOL TO R.T. JOHNSON RECREATIONAL FACILITIES AND SUMMERCHASE APARTMENTS IN EAST BREWTON
SIDEWALK IMPROVEMENTS ALONG BELLEVILLE AVE. FROM TIGER DR. TO THE YMCA AND FROM N. ST. TO PEAVY ST., ALONG PEAVY ST. FROM BELLEVILLE AVE. TO ESCAMBIA AVE., AND ALONG ESCAMBIA AVE. FROM N. ST. TO ROTCH BLVD. IN THE CITY OF BREWTON
ADA COMPLIANT PEDESTRIAN BRIDGE OVER LITTLE COVE CREEK THAT WILL CONNECT HOLLINGSWORTH PARK TO WILSON PARK IN THE CITY OF GLENCOE
DOWNTOWN STREETSCAPE IMPROVEMENTS ALONG CHESTNUT STREET FROM 7TH STREET TO 6TH STREET AND ALONG 6TH STREET FROM CHESTNUT STREET TO BROAD STREET - PHASE II IN THE CITY OF GADSDEN
SIDEWALK, CURB RAMPS AND CROSSWALKS ALONG THE SOUTH SIDE OF SCHOOL DRIVE FROM DAY STAR LANE TO SR-77 AND ALONG THE WEST SIDE OF SR-77 FROM SCHOOL DRIVE TO GLENN AVENUE IN THE CITY OF SOUTHSIDE
SIDEWALK ALONG THE EAST SIDE OF SOUTH HOUSTON STREET FROM CALDWELL PARK TO THE SCOTTSBORO RECREATION-COMMUNITY CENTER IN THE CITY OF SCOTTSBORO
TWO-WAY SEPARATED CYCLE TRACK ON 15TH AVENUE NORTH FROM SR-3 (US-31/CARRAWAY BLVD) TO 28TH STREET NORTH IN THE CITY OF BIRMINGHAM
SIDEWALK IMPROVEMENTS ALONG SR-17 NORTH, SR-18 WEST, BUTLER CIRCLE AND 5TH STREET SW IN THE CITY OF VERNON
ADA SIDEWALK IMPROVEMENTS ALONG MAIN STREET - PHASE I IN THE TOWN OF WATERLOO
SIDEWALK ALONG THE WESTERN SIDE OF SR-3 (US-31) FROM SR-99 (ELM ST.) TO JUNIPER CIRCLE WITH A PEDESTRIAN BRIDGE OVER SWAN CREEK IN THE CITY OF ATHENS - PHASE III
MULTI-USE PATH ALONG WALKER ST. FROM THE MUNICIPAL PARK TO GURLEY PIKE, ALONG GURLEY PIKE FROM WALKER ST. TO SR-2 (US-72), ALONG SR-2 (US-72) FROM GURLEY PIKE TO THE UNITED STATES POST OFFICE
DOWNTOWN STREETSCAPE IMPROVEMENTS ALONG E. WASHINGTON STREET, N. MAIN AVENUE AND W. WASHINGTON STREET IN THE CITY OF DEMOPOLIS
SIDEWALKS ALONG SR-44 FROM THE CHEVRON (MP 5.606) CONNECTING TO THE SIDEWALK ALONG THE HOLIDAY INN ENTRY ROAD AND SIDEWALK EXTENSIONS NEAR THE HOLIDAY INN IN THE CITY OF GUIN
SIDEWALK EXTENSION ALONG MAIN STREET - PHASE III IN THE TOWN OF GRANT
CONSTRUCTION OF ADA HANDICAP RAMPS AND SIDEWALK IMPROVEMENTS ALONG SOUTHWEST BLVD., FIFTH ST., YEEND AVE., GRANT ST. AND LEE ST. IN THE CITY OF CHICKASAW
CONSTRUCTION OF 159 ADA COMPLIANT CURB RAMPS IN DISTRICT 1 AND DISTRICT 2 THROUGHOUT MOBILE COUNTY
SIDEWALK IMPROVEMENTS ALONG NORTH 3RD STREET, WEST STATE STREET, NORTH 4TH STREET AND WEST LEBARON AVENUE IN THE CITY OF CITRONELLE
SIDEWALK IMPROVEMENTS ALONG DYESS BLVD FROM SR-136 TO BROWN STREET AND EXCEL/FRISCO HWY FROM SHADY ACRES PL (TRAILER CT) TO GRIFFIN ST. IN THE TOWN OF EXCEL
STREETSCAPE IMPROVEMENTS ON MOLTON STREET FROM MONTGOMERY STREET TO TALLAPOOSA STREET (IMPROVEMENTS INCLUDE BIKE LANES, SIDEWALKS, AND ADA COMPLIANT CURB RAMPS) PHASES I-IV
DOWNTOWN STREETSCAPE IMPROVEMENTS ALONG EAST JEFFERSON STREET IN THE CITY OF MONTGOMERY
SIDEWALKS ALONG SR-3 (US-31 / 6TH AVENUE) FROM MOULTON STREET TO WILSON STREET IN DECATUR
SIDEWALKS ALONG EAST UPPER RIVER ROAD AND NORTH BETHEL ROAD IN THE CITY OF PRICEVILLE
SIDEWALKS AND MULTI-USE PATH ALONG BETHEL STREET NE FROM MORROW STREET SE TO BETHEL ROAD NE - PHASE I IN THE CITY OF HARTSELLE
SIDEWALKS ALONG EAST ACADEMY STREET FROM ALPHONSA BYRD DRIVE (N. BRUNDIDGE STREET) TO ELM STREET IN THE CITY OF TROY
DOWNTOWN STREETSCAPE IMPROVEMENTS ALONG SR-77(MAIN STREET) IN THE TOWN OF WADLEY
MULTI-USE TRAIL AND GREENWAY SYSTEM ALONG THE SR-3 (US-31) CORRIDOR ADJACENT TO BISHOP CREEK IN PELHAM; PHASES 3 AND 4
DOWNTOWN STREETSCAPE IMPROVEMENTS ALONG SR-25 (MAIN STREET) FROM SR-3 (US-31) TO THE CSX RR AND ALONG SR-3 (US-31) FROM MAIN STREET TO 17TH AVENUE IN THE CITY OF CALERA
PEDESTRIAN AND STREETSCAPE IMPROVEMENTS ALONG CHESSER PLANTATION LANE FROM CHESSER PARK DRIVE TO CHESSER DRIVE AND ALONG CHESSER DRIVE FROM CHESSER PLANTATION LANE TO ATCHISON DRIVE IN THE CITY OF CHELSEA
DOWNTOWN STREETSCAPE IMPROVEMENTS ALONG NORTON AVENUE AND THE EAST SIDE OF SR-21 IN THE CITY OF SYLACAUGA
SIDEWALK IMPROVEMENTS ALONG E SOUTH STREET, W LAFAYETTE STREET, AND E LAFAYETTE STREET IN THE CITY OF DADEVILLE
SIDEWALKS ALONG TINGLE TANGLE ROAD FROM THE VANCE MUNICIPAL PARK TO WALLACE CHAPEL ROAD/WIRE ROAD IN THE CITY OF VANCE
SIDEWALK AND STREETSCAPE IMPROVEMENTS ALONG FIRST ST. FROM THE TERMINUS OF PHASE II IMPROVEMENTS TO BRIDGE AVE. AND ALONG BRIDGE AVE. FROM FIRST AVE. TO DREAMLAND DR.- PHASE III IN THE CITY OF NORTHPORT
SIDEWALKS ALONG CENTRAL PARK DR. FROM THE LAKE VIEW CITY HALL IN THE CITY OF LAKE VIEW TO BROWNE WAY AND FROM OLMSTED CIR. TO KIMBRELL CUTOFF RD.
SIDEWALKS ALONG SUMITON CUTOFF RD. FROM THE SUMITON WALKING TRAIL AND JOYCE ST. TO 1ST ST., ALONG 1ST ST. FROM FROM SUMITON CUTOFF RD. TO THE SUMITON ELEM. SCH., ALONG OLD CAMP RD. FROM SUMITON CUTOFF RD. TO MAIN ST. IN THE CITY OF SUMITON
LEVEL OF EFFORT INTERSTATE RESURFACING FY 2025
RESURFACING I-10 FROM 0.5 MILE WEST OF SR-181 TO SR-59 INCLUDING RAMPS
RESURFACING I-59 FROM THE ST. CLAIR COUNTY LINE TO SR-77
INTERCHANGE LIGHTING ON I-459 AT CR-18 (EXIT #1) AND CR-52 (EXIT #6) (PRIORITY #29)
CONCRETE PAVEMENT PRESERVATION ON I-59 FROM THE NORTH END OF THE BRIDGES (MP134.664) OVER WALDROP AVE (BIN # 11339 AND 11340) TO THE SOUTH END OF THE BRIDGES (MP 137.421) OVER EDWARDS LAKE ROAD (BIN # 10179 AND 10180).
CONCRETE PAVEMENT PRESERVATION ON I-59 FROM THE NORTH END OF THE BRIDGES (MP 130.584) OVER AVIATION AVE (BIN # 11094 AND 11095) TO THE NORTH END OF THE BRIDGES (MP 131.820) OVER 77TH STREET (BIN# 11559 AND 11560).
PLANING, OVERLAY AND STRIPING ON I-459 FROM THE NORTH END OF THE BRIDGE OVER SR-150 TO THE SOUTH END OF THE BRIDGE OVER US-31
ADDITIONAL LANES AND EXISTING LANE RECONSTRUCTION ON I-59/I-20 FROM FAIRFIELD BOULEVARD TO VALLEY ROAD INCLUDES BRIDGE REPLACEMENT OF DUAL BRIDGES OVER WEIBE DR (BIN 9517 AND 9518) AND VALLEY RD (BIN 9519 AND 9520)
PAVEMENT REHAB AND GUARDRAIL SAFETY IMPROVEMENTS ON I-65 NB: FROM DANIEL PAYNE DRIVE TO NORTH OF 47TH AVENUE OVERPASS(MP 265.200) SB:FROM DANIEL PAYNE DRIVE TO SOUTH OF WALKER CHAPEL ROAD(MP 266.906)
SIGN REPLACEMENT ON I-22 FROM THE WALKER COUNTY LINE (EXIT 81) TO I-65 INTERCHANGE
SIGN REPLACEMENT ON I-65 FROM THE TENNESSEE RIVER TO THE STATE LINE
SIGN REPLACEMENT ON I-65 FROM THE CULLMAN COUNTY LINE TO THE TENNESSEE RIVER
RESURFACING ON I-22 FROM SR-118 (MP 51.788) TO SR-118 (MP 57.366)
LEVEL OF EFFORT NON-INTERSTATE RESURFACING (FM) FY 2025
RESURFACE SR-3 (US-31) FROM PINEY WOODS CREEK BRIDGE TO .5 MILE SOUTH OF JULIAN TOWN RD
RESURFACE AND PLANE SR-167 FROM THE GENEVA COUNTY LINE TO SR-192 IN ENTERPRISE
RESURFACING AND PLANING SR-9 FROM PAVING JOINT 0.49 MILE NORTH OF THE DIVIDED 4 LANES TO PAVING JOINT AT 4TH STREET IN LUVERNE
MICRO-MILLING AND RESURFACING ON SR-74 (US-278) IN HOLLY POND FROM THE EAST BRIDGE END AT DUCK RIVER (MP 88.100) TO SR-91 (MP 92.500)
RESURFACING AND 2' SAFETY WIDENING ON SR-41 FROM SR-89 TO CR-85
RESURFACING AND 2' SAFETY WIDENING ON SR-41 FROM CR-85 TO SR-8 (US-80)
RESURFACE SR-3 FROM THE NORTH SIDE OF ALABAMA RIVER BRIDGE TO SR-6 (US 82)
MICRO-MILLING AND RESURFACING ON SR-291 FROM SR-759 (MP 0.000) TO SR-1 (US-431) (MP 0.890)
MICRO-MILLING AND RESURFACING ON SR-35 FROM SR-2 (US-72) (MP 49.396) IN SCOTTSBORO TO SR-279 (MP 50.546)
RESURFACING,PLANING,STRIPING AND PATCHING (SITE 1)SR-7(3RD AVE N) FROM ARKADELPHIA RD TO 10TH ST N (SITE 2)13th ST N FROM 3RD AVE N TO 1ST AVE N (SITE 3)SR-7N(1ST AVE N) FROM 9TH ST N TO 25TH ST N (SITE 4)SR-7S(9TH ST N) FROM 3RD AVE N TO 1ST AVE N
RESURFACING, PLANING, STRIPING AND PATCHING ON SR-7 (US-11) FROM 25TH STREET NORTH TO 83RD STREET NORTH INCLUDING WORK ON RAMPS 130A AND 130B
SURFACE TREATMENT AND STRIPING ON SR-4 (US-78) FROM JOHN ROGERS DRIVE TO GRAND RIVER PARKWAY
RESURFACING ON SR-133 FROM SR-2 TO SR-17
RESURFACING AND HIGH SURFACE TREATMENT ON SR-1 (US-431) FROM THE NORTH END OF THE TENNESSEE RIVER BRIDGE (MP 298.10) TO CATHEDRAL CAVERNS HIGHWAY (MP 304.84)
PLANING AND RESURFACING ON SR-1 (US-431) FROM SR-75 (MP 286.740) TO BRASHERS CHAPEL ROAD (MP 290.520)
RESURFACE AND MICRO-MILL SR-53 (US-231) ALONG BRUNDIDGE BYPASS FROM BEGIN DIVIDED HIGHWAY AT SR-93 TO THE END OF THE DIVIDED HIGHWAY AT VETERANS BLVD
RESURFACING, PLANING AND STRIPING SR-25 FROM SR-3 (US-31) TO OLD IVY ROAD
RESURFACING, 2' SAFETY WIDENING, SCORING AND ADA CURB RAMPS ON SR-28 FROM SR-7 (US-11) TO CR-21
RESURFACING AND PLANING ON SR-7 (US-11) FROM SR-6 (US-82) TO PLEASANT HILL DRIVE AND MODIFYING LEFT TURN LANE OFFSET AT HARGROVE ROAD, PALISADES DRIVE AND CYPRESS CREEK AVENUE INTERSECTIONS
LEVEL OF EFFORT SECTION 5311 RTAP AND NON-URBANIZED AREA (APPORTIONMENTS FY 2022)
LEVEL OF EFFORT - SECTION 5310 RURAL AND SMALL URBAN APPORTIONMENTS - FY 2024
LEVEL OF EFFORT SECTION 5339 BUS AND BUS FACILITIES (STATEWIDE-31 AND SMALL URBAN-BF APPORTIONMENTS FY 2023) ROLLING STOCK
SECTION 5339 TUSCALOOSA TRANSIT CAPITAL APPORTIONMENT FY 2024
LEVEL OF EFFORT RECREATIONAL TRAILS FOR FY 2025
LEVEL OF EFFORT ELECTRIC VEHICLE PROGRAM FY 2025
LEVEL OF EFFORT-SECTION 5307-BIRMINGHAM (APPORTIONMENT FY 23)
LEVEL OF EFFORT-SECTION 5307-PHENIX CITY (APPORTIONMENT FY 23)
LEVEL OF EFFORT-SECTION 5307-HUNTSVILLE(APPORTIONMENT FY 2023)
SECTION 5307 HUNTSVILLE TRANSIT CAPITAL RV MAINT FY 2025 (APPORTIONMENT FY 2024)
SECTION 5307 HUNTSVILLE TRANSIT CAPITAL OTHER PROJECTS/ITEMS FY 2025 (APPORTIONMENT FY 2024)
SECTION 5307 HUNTSVILLE TRANSIT CAPITAL ADA FY 2025 (APPORTIONMENT FY 2024)
LEVEL OF EFFORT-SECTION 5307-MOBILE (APPORTIONMENT FY 2023)
LEVEL OF EFFORT-SECTION 5307-MONTGOMERY (APPORTIONMENT FY 2023)
LEVEL OF EFFORT-SECTION 5307-LILLIAN-(APPORTIONMENT FY 2023)
LEVEL OF EFFORT-SECTION 5307-ANNISTON (APPORTIONMENT FY 2023)
LEVEL OF EFFORT-SECTION 5307-AUBURN(APPORTIONMENT FY 23)
LEVEL OF EFFORT-SECTION 5307-DECATUR (APPORTIONMENT FY 2023)
LEVEL OF EFFORT-SECTION 5307-DAPHNE/FAIRHOPE(APPORTIONMENT FY 2023)
LEVEL OF EFFORT-SECTION 5307-DOTHAN (APPORTIONMENT FY 2023)
LEVEL OF EFFORT-SECTION 5307-FLORENCE(APPORTIONMENT FY 2023)
LEVEL OF EFFORT-SECTION 5339-BIRMINGHAM (APPORTIONMENT FY 23)
LEVEL OF EFFORT-SECTION 5339-HUNTSVILLE (APPORTIONMENT FY 23)
LEVEL OF EFFORT-SECTION 5339-MOBILE (APPORTIONMENT FY 2023)
LEVEL OF EFFORT-SECTION 5339-MONTGOMERY (APPORTIONMENT FY 2023)
LEVEL OF EFFORT-SECTION 5339-PHENIX CITY (APPORTIONMENT FY 2023)
LEVEL OF EFFORT-SECTION 5339-LILLIAN (APPORTIONMENT FY 2023)
LEVEL OF EFFORT-SECTION 5310-BIRMINGHAM (APPORTIONMENT FY 23)
LEVEL OF EFFORT - SECTION 5310 HUNTSVILLE (URBAN) APPORTIONMENT - FY 2024
LEVEL OF EFFORT-SECTION 5310-MOBILE (APPORTIONMENT FY 2023)
LEVEL OF EFFORT-SECTION 5310-MONTGOMERY (APPORTIONMENT FY 2023)
LEVEL OF EFFORT-SECTION 5310-PHENIX CITY (APPORTIONMENT FY 2023)
LEVEL OF EFFORT-SECTION 5310 LILLIAN (APPORTIONMENT FY 2023)
LEVEL OF EFFORT SAFETY PROGRAM FY 2026
ACCESS MANAGEMENT ON SR-1(US-431) FROM COX GAP ROAD TO THE MARSHALL COUNTY LINE.
ACCESS MANAGEMENT ON SR-1(US-431) FROM COX GAP ROAD TO THE MARSHALL COUNTY LINE.
ACCESS MANAGEMENT ALONG SR-210 (ROSS CLARK CIRLCE) FROM KELLY DRIVE TO MEDICAL PARK BOULEVARD
ACCESS MANAGEMENT ALONG SR-210 (ROSS CLARK CIRLCE) FROM KELLY DRIVE TO MEDICAL PARK BOULEVARD
CONSTRUCTING ROUNDABOUT AT SR-51 AND GATEWAY DRIVE
RESURFACING AND 2' SAFETY WIDENING ON SR-147 FROM SR-38 (US-280) TO THE CHAMBERS COUNTY LINE
ACCESS MANAGEMENT ALONG SR-2(US-72) FROM 0.25 MILES WEST OF SHIELDS ROAD TO 0.75 MILES EAST OF BROCK ROAD, INCLUDING SIGNAL MODIFICATIONS AT SHIELDS ROAD, AND "R-CUT" IMPROVEMENTS AT JORDAN RD, DUG HILL RD, AND BROCK RD.
ACCESS MANAGEMENT ALONG SR-2(US-72) FROM 0.25 MILES WEST OF SHIELDS ROAD TO 0.75 MILES EAST OF BROCK ROAD, INCLUDING SIGNAL MODIFICATIONS AT SHIELDS ROAD, AND "R-CUT" IMPROVEMENTS AT JORDAN RD, DUG HILL RD, AND BROCK RD.
LEVEL OF EFFORT FOR TRANSPORTATION ALTERNATIVES PROGRAM FY 2026
DOWNTOWN STREETSCAPE IMPROVEMENTS ALONG 14TH STREET FROM 12TH AVENUE TO BROAD STREET
DOWNTOWN STREETSCAPE IMPROVEMENTS ALONG 14TH STREET FROM 12TH AVENUE TO BROAD STREET
LEVEL OF EFFORT INTERSTATE RESURFACING FY 2026
I-65 RECONSTRUCT NORTH AND SOUTH BOUND LANES AND ADDITIONAL LANES FROM BLOUNT COUNTY LINE TO 2.6 MILES S SR-69 AND WIDEN OVERPASS SR-91 (PRIORITY #22)
RECONSTRUCTION AND REHABILITATION OF I-59 SOUTHBOUND ROADWAY FROM 1.0 MILE NORTH OF SR-7 (US-11) TO THE GEORGIA STATE LINE
ADD LANES ON I-59 FROM 18TH/19TH STREET (EXIT 112) TO VALLEY ROAD (EXIT 118)
BRIDGE WIDEN ON I-65 CSX RR AND BUXAHATCHEE CK, SOUTH OF EXIT 228 BIN# 006832 AND #006833
INTERCHANGE LIGHTING ON I-20 AT CR-207 (EXIT 165)
RESURFACING ON I-22 FROM THE MARION COUNTY LINE TO CR-1
LEVEL OF EFFORT NON-INTERSTATE RESURFACING (FM) FY 2026
RESURFACE, PLANE, STRIPE, AND PATCH SR-79 FROM WINEWOOD ROAD (MP 7.424) TO THE SOUTH END OF TURKEY CREEK BRIDGE (MP 12.450)
RESURFACING AND 2' SAFETY WIDENING ON SR-147 FROM SR-38 (US-280) TO THE CHAMBERS COUNTY LINE
LEVEL OF EFFORT SECTION 5311 RTAP AND NON-URBANIZED AREA (APPORTIONMENTS FY 2023)
LEVEL OF EFFORT - SECTION 5310 RURAL AND SMALL URBAN APPORTIONMENTS - FY 2025
LEVEL OF EFFORT SECTION 5339 BUS AND BUS FACILITIES (STATEWIDE AND SMALL URBAN APPORTIONMENT FY 2024) ROLLING STOCK
SECTION 5339 TUSCALOOSA TRANSIT CAPITAL APPORTIONMENT FY 2025
LEVEL OF EFFORT RECREATIONAL TRAILS FOR FY 2026
LEVEL OF EFFORT ELECTRIC VEHICLE PROGRAM FY 2026
LEVEL OF EFFORT-SECTION 5307-BIRMINGHAM (APPORTIONMENT FY 24-EST)
LEVEL OF EFFORT-SECTION 5307-PHENIX CITY(APPORTIONMENT FY 2024-EST)
LEVEL OF EFFORT-SECTON 5307-HUNTSVILLE (APPORTIONMENT FY 24-EST)
LEVEL OF EFFORT-SECTION 5307-MOBILE (APPORTIONMENT FY 2023)
LEVEL OF EFFORT-SECTION 5307-MONTGOMERY(APPORTIONMENT FY 2024-EST)
LEVEL OF EFFORT-SECTION 5307-LILLIAN (APPORTIONMENT FY 2024-EST)
LEVEL OF EFFORT-SECTION 5307-ANNISTON(APPORTIONMENT FY 24-EST)
LEVEL OF EFFORT-SECTION 5307-AUBURN(APPORTIONMENT FY 24-EST)
LEVEL OF EFFORT-SECTION 5307-DECATUR (APPORTIONMENT FY 2024-EST)
LEVEL OF EFFORT-SECTION 5307-DAPHNE/FAIRHOPE(APPORTIONMENT FY 2024-EST)
SECTION 5307 BALDWIN REGIONAL AREA TRANSIT SYSTEM (BRATS) BUS/VAN FY 2024
SECTION 5307 BALDWIN REGIONAL AREA TRANSIT SYSTEM (BRATS) PREVENTATIVE MAINTENANCE FY 2024
SECTION 5307 BALDWIN REGIONAL AREA TRANSIT SYSTEM (BRATS) SOFTWARE FY 2024
SECTION 5307 BALDWIN REGIONAL AREA TRANSIT SYSTEM (BRATS) OPERATING FY 2024
LEVEL OF EFFORT-SECTION 5307-DOTHAN (APPORTIONMENT FY 2024-EST)
LEVEL OF EFFORT-SECTION 5307-FLORENCE(APPORTIONMENT FY 2024-EST)
LEVEL OF EFFORT-SECTION 5339-BIRMINGHAM (APPORTIONMENT FY 24-EST)
LEVEL OF EFFORT-SECTION 5339-HUNTSVILLE (APPORTIONMENT FY 2024-EST)
LEVEL OF EFFORT-SECTION 5339-MOBILE (APPORTIONMENT FY 2024-EST)
LEVEL OF EFFORT-SECTION 5339-MONTGOMERY (APPORTIONMENT FY 2024-EST)
LEVEL OF EFFORT-SECTION 5339-PHENIX CITY (APPORTIONMENT FY 2024-EST)
LEVEL OF EFFORT-SECTION 5339-LILLIAN (APPORTIONMENT FY 2024-EST)
LEVEL OF EFFORT-SECTION 5310-BIRMINGHAM (APPORTIONMENT FY 24-EST)
LEVEL OF EFFORT - SECTION 5310 HUNTSVILLE (URBAN) APPORTIONMENT - FY 2025
LEVEL OF EFFORT-SECTION 5310-MOBILE (APPORTIONMENT FY 2024-EST)
LEVEL OF EFFORT-SECTION 5310-MONTGOMERY (APPORTIONMENT FY 2024-EST)
LEVEL OF EFFORT-SECTION 5310-PHENIX CITY (APPORTIONMENT FY 2024-EST)
LEVEL OF EFFORT-SECTION 5310 LILLIAN (APPORTIONMENT FY 2024-EST)
LEVEL OF EFFORT SAFETY PROGRAM FY 2027
IMPROVEMENTS AT THE INTERSECTION OF SR-6 (US-82) AND CR-29 (GIN SHOP HILL ROAD)
CONSTRUCTING ROUNDABOUT AT SR-51 AND GATEWAY DRIVE
LEVEL OF EFFORT FOR TRANSPORTATION ALTERNATIVES PROGRAM FY 2027
LEVEL OF EFFORT INTERSTATE RESURFACING FY 2027
RECONSTRUCTION OF THE NORTHBOUND ROADWAY OF I-59 FROM 0.75 MILES NORTH OF THE SR-68 INTERCHANGE (MP 205.600) TO 0.73 MILES SOUTH OF THE SR-35 INTERCHANGE (MP 217.85)
I-85 ADDITIONAL LANES AND BRIDGE REPLACEMENT FROM MP 58.6 TO MP 62.45 INCLUDES BRIDGES: I85-41-12.2 #006495 AND #006496, I85-41-13.2 #006497 AND #006498, I85-41-13.3 #006499 AND 006500
LEVEL OF EFFORT NON-INTERSTATE RESURFACING (FM) FY 2027
RESURFACING, PLANING, STRIPING, LEVELING AND PATCHING ON SR-23 FROM SR-7 (US-11) IN SPRINGVILLE TO SR-53 (US-231) IN ASHVILLE
LEVEL OF EFFORT SECTION 5311 RTAP AND NON-URBANIZED AREA (APPORTIONMENT FY 2024)
LEVEL OF EFFORT - SECTION 5310 RURAL AND SMALL URBAN APPORTIONMENTS - FY 2026
LEVEL OF EFFORT SECTION 5339 BUS AND BUS FACILITIES (STATEWIDE AND SMALL URBAN APPORTIONMENT FY 2025) ROLLING STOCK
SECTION 5339 TUSCALOOSA TRANSIT CAPITAL APPORTIONMENT FY 2026
SECTION 5339 TUSCALOOSA TRANSIT CAPITAL APPORTIONMENT FY 2027
LEVEL OF EFFORT RECREATIONAL TRAILS FOR FY 2027
LEVEL OF EFFORT ELECTRIC VEHICLE PROGRAM FY 2027
LEVEL OF EFFORT-SECTION 5307-BIRMINGHAM(APPORTIONMENT FY 25-EST)
LEVEL OF EFFORT-SECTION 5307-PHENIX CITY (APPORTIONMENT FY 2025-EST)
LEVEL OF EFFORT-SECTION 5307-HUNTSVILLE(APPORTIONMENT FY 2025 EST)
LEVEL OF EFFORT-SECTION 5307-MOBILE (APPORTIONMENT FY 2025- EST)
LEVEL OF EFFORT-SECTION 5307-MONTGOMERY(APPORTIONMENT FY 2025-EST)
LEVEL OF EFFORT-SECTION 5307-LILLIAN (APPORTIONMENT FY 2025-EST)
LEVEL OF EFFORT-SECTION 5307-ANNISTON(APPORTIONMENT FY 25-EST)
LEVEL OF EFFORT-SECTION 5307-AUBURN (APPORTIONMENT FY 25-EST)
LEVEL OF EFFORT-SECTION 5307-DECATUR (APPORTIONMENT FY 2025-EST)
LEVEL OF EFFORT-SECTION 5307-DAPHNE/FAIRHOPE (APPORTIONMENT FY 2025-EST)
LEVEL OF EFFORT-SECTION 5307-DOTHAN (APPORTIONMENT FY 2025-EST)
LEVEL OF EFFORT-SECTION 5307-FLORENCE(APPORTIONMENT FY 2025-EST)
LEVEL OF EFFORT-SECTION 5339-BIRMINGHAM (APPORTIONMENT FY 25-EST)
LEVEL OF EFFORT-SECTION 5339-HUNTSVILLE (APPORTIONMENT FY 2025-EST)
LEVEL OF EFFORT-SECTION 5339-MOBILE (APPORTIONMENT FY 2025-EST)
LEVEL OF EFFORT-SECTION 5339-MONTGOMERY (APPORTIONMENT FY 2025-EST)
LEVEL OF EFFORT-SECTION 5339-PHENIX CITY (APPORTIONMENT FY 2025-EST)
LEVEL OF EFFORT-SECTION 5339-LILLIAN (APPORTIONMENT FY 2025-EST)
LEVEL OF EFFORT-SECTION 5310-BIRMINGHAM (APPORTIONMENT FY 25-EST)
LEVEL OF EFFORT - SECTION 5310 HUNTSVILLE (URBAN) APPORTIONMENT - FY 2026
LEVEL OF EFFORT-SECTION 5310-MOBILE (APPORTIONMENT FY 2025-EST)
LEVEL OF EFFORT-SECTION 5310-MONTGOMERY (APPORTIONMENT FY 2025-EST)
LEVEL OF EFFORT-SECTION 5310-PHENIX CITY (APPORTIONMENT FY 2025-EST)
LEVEL OF EFFORT-SECTION 5310-LILLIAN (APPORTIONMENT FY 2025-EST)